One to keep an eye on, 156498 apparently is out of traffic at Etches Park (and has been for some time) awaiting a decision to be made on whether corrosion repairs are to be authorised, it is currently unfit for traffic and requires works attention.
I wouldn't be at all surprised if this ends up at Newport Sims Metals (or somewhere similar).
You evidently don’t remember the 2002/3 version of MML, which was so dire it was the worst performing operator.
Well this version of the MML can't be much better than 2002/2003, surely?
We currently have 222s that are starting to show their age internally - and whilst the fleet has been standardized to 5 car, there is now a weird mismatch of provisioning between units. Some 5 car units have 2 cars 1st, some have 1 2/3 cars 1st, and some have 1 1/3 cars 1st.
The 360s still have their original interiors, with no tables and 2+3 seating, as well as being regularly short formed to 4 cars. We were promised 12 cars in the peaks. Plus, at least for Wellingborough/Bedford/Luton customers travelling north, they don't actually go where they need to, i.e. Leicester/Nottingham/Sheffield.
Personally I'd have kept the HST's and refurbished them to be PRM compliant - the HST's (all apart from the ex GC units) were 8 car, so no short formations; they actually had tables and 2+2 seating (which is much comfier and more suitable than commuter 2+3), they actually used to go further north than Kettering, and they had a higher running speed of 125mph - compared to the 110 of the 360s - and speaking of, the 360s can only do 110 between Wellingborough and Bedford (and vice versa). Corby - Wellingborough is 90 due to the limitations of the Slow lines and Beford - London is 100 due to the limitations of the old OHLE wiring.
For me, it would have been: upgrade the Slow lines to 100mph in all directions; use a 100mph capable DMU (like a 170, for example) to do Corby - Bedford intermediate stations for those that want to travel to Corby (interconnects with Thameslink at Bedford for London), use the HSTs and 180s to do London - Leicester - Nottingham/Sheffield (with at least a half hourly Bedford/Wellingborough/Kettering stops) and send the 222s to either CrossCountry or Newport Sims Metals.
(Yes, I don't like the 22x series of trains either, who thought it was a good idea to screen out 3G/4G/5G/FM/DAB/GPS using metallic foil in the coach windows?!)
I can't wait to actually get enough of an income to afford a car/insurance/petrol etc - then I'll start driving and become self-sufficient, so I won't need to rely on shoddy TOC's such as EMR. 2 trains northbound per day, and 3 trains southbound per day, does not count as a sufficient service IMO.