HamworthyGoods
Established Member
- Joined
- 15 Jan 2019
- Messages
- 4,478
How many turbo diagrams are there left at Reading?
== Doublepost prevention - post automatically merged: ==
What tweaks exactly?
Have the dwell times been reduced?
Surely they would be better off ditching the 769 timings and going back to the faster 165 paths
Dwell times are the same for 165s and 769s
Bearing in mind the Reading 165s struggled with the 165 running times as these were based around the 165/0s which originally worked on the North Downs the current 769 paths provide a far more robust operating environment.
For details of the tweaks both the pre May and post May timetables are on the GWR website, you’ll be able to compare the two timetables to see what has changed, I understand it is only in the AM there are changes.