Mainsideman
Member
With the strikes upon us…
Which grades would be worried about their job security in regards to the cuts and why?
Which grades would be worried about their job security in regards to the cuts and why?
Primarily operatives to begin with, but I very much expect them to come for technicians, teamleader, supervisors, and managers in the not too distant future.The OPs question was I think related to the current strike vote. The roles affected by the “2500 job cuts” are NR operational grades - maintenance of signalling, telecom, Pway, and so on, who are being threatened with ‘modernisation’.
I think the next think they’ll try is to dramatically reduce headcount by making cross-discipline teams. You can see the start of this with what they’re proposing for operatives but in future I expect we’ll see the abolition of seperate S&T, P-Way, Off Track, Distirubtion maintenance/faulting teams and everyone will be expected to work on everything (with predictable disastrous results). The MOM grade will probably be savaged and incorporated into their cross-discipline teams too.Primarily operatives to begin with, but I very much expect them to come for technicians, teamleader, supervisors, and managers in the not too distant future.
Booking office staff would be the main one. Booking offices are likely to mostly close progressively over the coming 10-20 years (though it might not require compulsory redundancy it might involve moving round a bit), and because they are a minority method of buying tickets a strike wouldn't really affect very much, so they have no power to strike to resist it unlike guards.
Is it me, or I feel like this is hyperbole considering HS2 is under construction, Crossrail has just opened and the commitment to the Integrated Rail Plan.All jobs. The threat to the railway is VERY real. It is simply unaffordable at present. Government has made that clear.
Yes indeed.All jobs. The threat to the railway is VERY real. It is simply unaffordable at present. Government has made that clear.
These are all capex in projects that have been assessed as having a significant net benefit to the economy and the taxpayer. Quite different from trying to minimise opex on a railway whose value to taxpayers is questionable in parts.Is it me, or I feel like this is hyperbole considering HS2 is under construction, Crossrail has just opened and the commitment to the Integrated Rail Plan.
Its pretty clear the railways aren't going to be shut down entirely.
Yes, but its pretty clear the entire railway isn't going to shut down.These are all capex in projects that have been assessed as having a significant net benefit to the economy and the taxpayer. Quite different from trying to minimise opex on a railway whose value to taxpayers is questionable in parts.
The post you're quoting states that all roles should be considered to be at risk. It doesn't state that the railway is going to be wholesale closed!Is it me, or I feel like this is hyperbole considering HS2 is under construction, Crossrail has just opened and the commitment to the Integrated Rail Plan.
Its pretty clear the railways aren't going to be shut down entirely.
Is it me, or I feel like this is hyperbole considering HS2 is under construction, Crossrail has just opened and the commitment to the Integrated Rail Plan.
Its pretty clear the railways aren't going to be shut down entirely.
I think it's what they ultimately want as well, but I can't see it working at all.I think the next think they’ll try is to dramatically reduce headcount by making cross-discipline teams. You can see the start of this with what they’re proposing for operatives but in future I expect we’ll see the abolition of seperate S&T, P-Way, Off Track, Distirubtion maintenance/faulting teams and everyone will be expected to work on everything (with predictable disastrous results). The MOM grade will probably be savaged and incorporated into their cross-discipline teams too.
So a typical team might consist of someone who knows how to use a meter and has SMTH, someone who can work a shovel and knows the track standards, another who has a live line tester and can put up earths and use the insulated poles, and an operating dogsbody who can do LXA, Points Operator etc.. You’ll end up with four or five man teams but in vastly reduced numbers compared with the maintenance organisation we have now.
I wonder how many non DfT 'Category A' stations will have booking offices in the next decade or two. Very few I think outside of a few strategic locations like airports.
But I think, in fact I know, that parts of it are at risk. And therefore all types of jobs are at risk.
Which parts of it, out of interest (to the extent you’re able to say)?
All jobs. The threat to the railway is VERY real. It is simply unaffordable at present. Government has made that clear.
Hard for a government to claim anything is unaffordable when they’ve just today spent £10bn (the amount not covered by the “windfall tax”) on subsidising peoples energy bills.
Of course, whether they *want* to afford it is another matter.
Indeed.
I honestly can’t foresee a “Thatcher moment”, despite the current IR situation. The amounts of money involved with the railway simply aren’t big enough, relative to the potential disruption caused, especially with the current “get back to the office” messaging.