With the network change that’ll bump LCB services back down to 6 (including the 43) the 276 while having a handy link between Bathgate and West Calder (which is only hourly fyi) is a pain to get to Broxburn, the 275 was at least every 30 minutes and ran a faster route to Broxburn compared to it‘s other half!
Honestly i would of just made the 275 hourly before scrapping it altogether and maybe taken a chance by extending it beyond Broxburn, the 276 could also be extended but the full route already comes up to 1 hour and 43 minutes at least!
The Key Route’s into the city seem like they hold well on their own as stated up above so no worries there! And the 280 does very well getting from Livingston to Bathgate! It’s just the 276 I’m worried about, and the 281 if that ever comes out of suspension.
Since the 276 has two sections on the route is it not worth just extending the Loganlea section back to Fauldhouse, as if history goes to show LCB will no doubt consider serving it again as they did back in Christmas!
Could we also see a new route within West Lothian somepoint this year? Something linking with Queensferry or Linlithgow?
Anyway that‘s plenty from me!