More than I was expecting actually.So now your saving is down to about 2.3 minuites.
More than I was expecting actually.So now your saving is down to about 2.3 minuites.
You might get away with just four tracking from Cross Gates onwards, as long as you keep slower DMUs off of the Hull trains.
Eventually but we don't know when.What’s the update on Leeds - Church Fenton electrification? Not happening?
I'm assuming the main time saving is 5 minutes of not being stuck behind a stopper. Admittedly it doesn't need to be a 250mph line for thatNot much.
8 miles at 100 MPH, is 4.8 minutes, at 250MPH it's 1.92 minuites, so even with trains that could accelerate instantly you would be saving less than 3 minuites.
If we assume an acceleratoin/decelleration rate 1 meter per second per second (I don't know what the acceleration profile of the HS2 stock is planned to be but I suspect at the top end of the speed range it will be less than this) it will take over a minuite for a train to reach that speed. So ballparking you would have
1 minuite of accelerating operation with an average speed of around 175MPH covering about 3 miles.
2 miles at full speed taking about half a minuite.
1 minuite of decelerating operation with an average speed of around 175MPH covering about 3 miles.
So now your saving is down to about 2.3 minuites.
Crossgates to Thorpe Park / M1 should be easy to do as it has passive provision for 4-tracking (as long as the new bridge at Thorpe Park does!). It is more difficult when you get to Garforth as there is no room for 4 track and East Garforth station is built on the space for the slow linesUnfortunately its Marsh Lane to Crossgates which is probably the easiest section to four track!
DMUs going to Hull is a major outstanding question for me, even with some four tracking, stopping services going that way will still have to mix it with the expresses, how that is made to work is a bit problematic, unless/until electrification to Selby/Hull is authorised.
The HS2 route would also allow the speed and capacity restrictions of Micklefield Jnc to be avoidedI'm assuming the main time saving is 5 minutes of not being stuck behind a stopper. Admittedly it doesn't need to be a 250mph line for that
If these were the plans on NR's site, they were unleashed prior to the scaling back of NPR. Any additional NPR enhancements (if there even are any) would have to be in a separate doc.Just been looking at proposed Huddersfield station improvements. NR document says through platforms will cater for 8 coach trains. How will it cater for HS2 trains which surely will be longer (unless only half a train goes forward to Leeds)? Wouldn't it be a spiffing idea to make Huddersfield cater for full length HS2 trains rather than remodel again later?.... Or is there a cunning plan Baldrick?
Carlisle is currently receiving a platform upgrade. Although it requires P1&3 lengthening and P2 filling in to be replaced by P0, this will come from a separate pot of money so current work will have to be partly undone for HS2 works. Delaying the HS2 work will save money in this year’s budget which is all the treasury is concerned about.Just been looking at proposed Huddersfield station improvements. NR document says through platforms will cater for 8 coach trains. How will it cater for HS2 trains which surely will be longer (unless only half a train goes forward to Leeds)? Wouldn't it be a spiffing idea to make Huddersfield cater for full length HS2 trains rather than remodel again later?.... Or is there a cunning plan Baldrick?
According to the IRP only the Birmingham-Manchester trains would continue on to Huddersfield and Leeds, and I believe those are planned to be 200m long. But it would become complicated if they were to be expanded in the future.Just been looking at proposed Huddersfield station improvements. NR document says through platforms will cater for 8 coach trains. How will it cater for HS2 trains which surely will be longer (unless only half a train goes forward to Leeds)? Wouldn't it be a spiffing idea to make Huddersfield cater for full length HS2 trains rather than remodel again later?.... Or is there a cunning plan Baldrick?
Ah, thanks!According to the IRP only the Birmingham-Manchester trains would continue on to Huddersfield and Leeds, and I believe those are planned to be 200m long. But it would become complicated if they were to be expanded in the future.
Just been looking at proposed Huddersfield station improvements. NR document says through platforms will cater for 8 coach trains. How will it cater for HS2 trains which surely will be longer (unless only half a train goes forward to Leeds)? Wouldn't it be a spiffing idea to make Huddersfield cater for full length HS2 trains rather than remodel again later?.... Or is there a cunning plan Baldrick?
You won’t be seeing 400m passenger services across the Pennines.
Do we know how they plan to path additional trains on the 2 track section east of Westtown? One of the reasons I was in favour of new build all the way to Leeds is I didn't think there was space for additional trains on the route through Batley and Morley and at Leeds itselfDo we know what the actual usable train length of the platforms will be, afaict "8 car" could be anything from 160m to 208m
Do we know what the actual usable train length of the platforms will be, afaict "8 car" could be anything from 160m to 208m.
Do we know how they plan to path additional trains on the 2 track section east of Westtown? One of the reasons I was in favour of new build all the way to Leeds is I didn't think there was space for additional trains on the route through Batley and Morley and at Leeds itself
A 3 minute headway seems somewhat 'ambitious', at least through Morley tunnel.including 2 stoppers at 3 minute headways
A 3 minute headway seems somewhat 'ambitious', at least through Morley tunnel.
The journey time you quoted is only 2 minutes quicker than some of the current stoppers. Can they stay ahead of additional fast services, especially through the tunnel? The original TRU plan involved major work at both Batley and Morley for realignment- has the IRP abandoned this idea?ETCS is coming...
At current linespeed (75mph), Morley's 3080m length take 92 seconds to traverse. 98s if you allow 200m for train length.ETCS is coming...
The journey time you quoted is only 2 minutes quicker than some of the current stoppers. Can they stay ahead of additional fast services, especially through the tunnel? The original TRU plan involved major work at both Batley and Morley for realignment- has the IRP abandoned this idea?
At current linespeed (75mph), Morley's 3080m length take 92 seconds to traverse. 98s if you allow 200m for train length.
So unless I'm missing something, even with ETCS that's going to be exceptionally tight for a 180s planning headway...
Because it's roughly at the midpoint of the two-track section, the fast and slower trains will be further apart here (the slow will have fallen back from the fast it left just behind but won't yet have the next fast catching up with it). So the headway before and after the slows, which are the ones that will take more than 92s, can be more than 3min.At current linespeed (75mph), Morley's 3080m length take 92 seconds to traverse. 98s if you allow 200m for train length.
So unless I'm missing something, even with ETCS that's going to be exceptionally tight for a 180s planning headway...
True, I was just challenging @Bald Rick on the assertion of a 3 minute headway!Because it's roughly at the midpoint of the two-track section, the fast and slower trains will be further apart here (the slow will have fallen back from the fast it left just behind but won't yet have the next fast catching up with it). So the headway before and after the slows, which are the ones that will take more than 92s, can be more than 3min.
It might be that the TPR shows a longer headway around Morley.True, I was just challenging @Bald Rick on the assertion of a 3 minute headway!
Because it's roughly at the midpoint of the two-track section, the fast and slower trains will be further apart here (the slow will have fallen back from the fast it left just behind but won't yet have the next fast catching up with it). So the headway before and after the slows, which are the ones that will take more than 92s, can be more than 3min.
2 stoppers an hour is what we have now isn't it? So there will be no increase in local services, certainly no chance of having a local metro-frequency service, unless you want to drastically reduce the number of fast services. The IRP is quoting 8 fast services an hour Manchester-Leeds, so that appears to be it.Way too soon to be planning the detail. But it’s quite simple - with electric trains and some linespeed improvements the stoppers will take about 17 minutes Leeds - Ravensthorpe. Possibly less. A non stop train will do the same in 9 mins; one that stops at Dewsbury about 12 minutes. In theory, that provides capacity for 14 trains an hour each way including 2 stoppers at 3 minute headways (each stopper takes four paths).
No, there is just an hourly Leeds to Huddersfield all shacks. That's all that the new White Rose station is due to get.2 stoppers an hour is what we have now isn't it?
Surely we can say something slightly more meaningful than that? Figure 9 in the Integrated Rail Plan (pp. 134 - 135) shows Leeds to York electrification to start between 2030 and 2035.Eventually but we don't know when.
2 stoppers an hour is what we have now isn't it? So there will be no increase in local services, certainly no chance of having a local metro-frequency service, unless you want to drastically reduce the number of fast services. The IRP is quoting 8 fast services an hour Manchester-Leeds, so that appears to be it.
Also this would produce a highly flighted timetable, with a rush of fast trains every few minutes, followed by a 15 minute gap for the slow service, then the next rush, etc.
.....via Dewsbury and Brighouse, but not Halifax!and 1 to Wigan via Halifax.