Iskra
Established Member
The transition to GBR could be a fantastic opportunity to create a rail network with a higher degree of integration. We often hear on these forums that x unit can't work with z unit or y loco couldn't rescue x unit. Most of the time this doesn't cause problems, but there must be numerous examples where incidents could be resolved quicker if something closer was able to assist, or could there be a benefit from just being able to theoretically join any train on the network with another for ECS purposes, maximising paths on congested cores, or just more easily adding additional capacity?
Now, I'm not suggesting re-engineering every piece of rolling stock on the network to work with every other one, that would be problematic in many ways. However, what I would suggest is making some form of universal standards for all newly introduced rolling stock from a certain date, so that eventually we will have a railway where everything could theoretically work with all other rolling stock. I'm referring to couplings, electrical systems and computer systems here.
Do you think this is practical, or a good idea?
Now, I'm not suggesting re-engineering every piece of rolling stock on the network to work with every other one, that would be problematic in many ways. However, what I would suggest is making some form of universal standards for all newly introduced rolling stock from a certain date, so that eventually we will have a railway where everything could theoretically work with all other rolling stock. I'm referring to couplings, electrical systems and computer systems here.
Do you think this is practical, or a good idea?
Last edited: