• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Remaining Great Northern services post Thameslink to be rolled into London Overground and LNER?

Status
Not open for further replies.

si404

Established Member
Joined
28 Dec 2012
Messages
1,267
Might be time to introduce route identifiers (letters or numbers) if the Overground becomes much more complex than it is now.
Why does it have to be letters or numbers? There's names already in common parlance (and they can always tweak them/give them new ones) and that's how all the other lines are done.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Envy123

Member
Joined
9 Apr 2015
Messages
633
Location
Peterborough
You probably got lucky.

I also don't have issues with Thameslink either, except for the engineering works when I have to drive to get somewhere but that affects LNER, HT and GC too. In fact, I'm thinking for when I buy a house, I'll stick with being close to a Thameslink station as there are direct trains to my work in Farringdon and when I travel, it's at least 3tph (4tph pre-COVID). LNER would be too costly for a daily commute and less frequent too.
 

choochoochoo

Established Member
Joined
6 Aug 2013
Messages
1,318
How are TfL going to afford this ?

So many questions.

Extra Station Staff at shared stations (Finsbury Park, Potters Bar, Hatfield, WGC, Stevenage). Separate Driver Facilities at Signing on and PNB points ?

Will the 717s all be berthed at Hornsey/Hertford North (Or will they 'rent' siding space at Welwyn/Letchworth from GTR) ? Are they going to keep driver depots at Welwyn and Hitchin ? Or transfer those drivers with the additional PT&R costs

How will the maintenance contract with Siemens work ? Am I right that GTR's contract with Siemens works on the premise that Siemens guarantee GTR a set number of operational 700/717s every day. Sure they can split the contract, but suspect it'll be altogether more expensive to GTR/TfL and that cost will then be passed on to tax payer/passengers.

Will it be run by a TOC on behalf of TfL like Overground is now with Arriva?

What's the TfL pension pot like ? Won't the transfer of GTR staff burden that pot ?

Was it not only a few weeks ago that TfL almost had to stop running the Overground because they'd got that short of money ?

I cannot see how it will be cost-neutral at all. It's going to cost the tax-payer/passengers a fortune.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,145
I don't think it would be a good a for Great Northern 'outer suburban' services to be put with LNER.

As @bramling mentions there would be a dogs breakfast of operators at Stevenage, as well as at Cambridge. At the moment when things go wrong it's straightforward for GTR control to add additional stops but with 2 or 3 organisations involved this becomes far harder and probably wouldn't happen.

GTR provide cheaper fares from Peterborough, these are particularly popular on the class 365 operated additional peak services operated under the Great Northern brand. Imagine if these services transferred to LNER, the price would no doubt increase as LNER would be unable to offer cheaper fares from Peterborough as they set the Any Permitted fare. The unintended consequence would be the 365s would cart fresh air around and price sensitive commuters would switch to the slower Thameslink services causing overcrowding towards London.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Will the 717s all be berthed at Hornsey/Hertford North (Or will they 'rent' siding space at Welwyn/Letchworth from GTR) ? Are they going to keep driver depots at Welwyn and Hitchin ? Or transfer those drivers with the additional PT&R costs

Seeing as GTR/GN won't be using it anymore, the stabling arrangements will be transferred over. Much the same way that LO didn't have to build new rolling stock depots upon taking over the lines out of Liverpool Street or even the original WLL/NLL/GOBLIN

How will the maintenance contract with Siemens work ? Am I right that GTR's contract with Siemens works on the premise that Siemens guarantee GTR a set number of operational 700/717s every day. Sure they can split the contract, but suspect it'll be altogether more expensive to GTR/TfL and that cost will then be passed on to tax payer/passengers.

700s are on the 'set diagrams/day' system but the 717s are on a 'normal' manufacturer maintenance scheme - no contracts to be unwoven, just the 717 contract moved to TfL (assuming it isn't handled indirectly already by the ROSCO - Rock Rail)
 

choochoochoo

Established Member
Joined
6 Aug 2013
Messages
1,318
Seeing as GTR/GN won't be using it anymore, the stabling arrangements will be transferred over. Much the same way that LO didn't have to build new rolling stock depots upon taking over the lines out of Liverpool Street or even the original WLL/NLL/GOBLIN

700s are on the 'set diagrams/day' system but the 717s are on a 'normal' manufacturer maintenance scheme - no contracts to be unwoven, just the 717 contract moved to TfL (assuming it isn't handled indirectly already by the ROSCO - Rock Rail)

But GTR use Welwyn for 700s and Letchworth for every traction.

Also is there some sort of discount for GTR for having 2 contracts with Siemens- one for 700s, one for 717s. Would that discount not be lost if they were split between 2 operators. Again assuming maintenance isn't taken care of by the ROSCO.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,400
Location
Hertfordshire / Teesdale
But GTR use Welwyn for 700s and Letchworth for every traction.

The crewing would be interesting for sure. What do Hitchin drivers do now? I presume given, as you say, Letchworth stables a mix of 365, 387, 700 and 717 each night, Hitchin drivers must work all of these?

Is the longer term plan that Hitchin will work Stevenage to Moorgate, peak Baldocks, and a few Maidstone-Cambridge services? At present there seems to be a lot of “pass” travelling from Hitchin to both Welwyn and Finsbury Park, which is presumably Hitchin drivers. One presumes this can’t be the permanent plan as it is extremely wasteful.
 

aleggatta

Member
Joined
28 Sep 2015
Messages
565
Also is there some sort of discount for GTR for having 2 contracts with Siemens- one for 700s, one for 717s. Would that discount not be lost if they were split between 2 operators. Again assuming maintenance isn't taken care of by the ROSCO.

The 717's are under a standard rolling stock agreement, the same type of agreement that the 313's were under. They are maintained by the same staff that maintain the 387's that operate north of the thames, the only agreement between GTR and siemens in relation to the 717's will be a service contract to maintain rotating spares and to provide consumables so as to maintain train/component warranties, however this will normally be in agreement with the ROSCO as they will invest in the 'stock' spares to hold on depot as well as investing in the trains at time of build. There is no 'linked' financial gain for operating two Desiro City fleets apart from the ease of traction conversion for train crews, which would always have been a bonus rather than a necessity.
 

choochoochoo

Established Member
Joined
6 Aug 2013
Messages
1,318
The crewing would be interesting for sure. What do Hitchin drivers do now? I presume given, as you say, Letchworth stables a mix of 365, 387, 700 and 717 each night, Hitchin drivers must work all of these?

Is the longer term plan that Hitchin will work Stevenage to Moorgate, peak Baldocks, and a few Maidstone-Cambridge services? At present there seems to be a lot of “pass” travelling from Hitchin to both Welwyn and Finsbury Park, which is presumably Hitchin drivers. One presumes this can’t be the permanent plan as it is extremely wasteful.
Hitchin drive 717s mainly with some 387 work I believe.
 

Envy123

Member
Joined
9 Apr 2015
Messages
633
Location
Peterborough
The unintended consequence would be the 365s would cart fresh air around and price sensitive commuters would switch to the slower Thameslink services causing overcrowding towards London.

If Huntingdon had LNER style fares for the "faster services", I would indeed just stick with Thameslink. Thameslink actually is faster if you're going to any core stations, taking into account wait and interchange time.
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
But GTR use Welwyn for 700s and Letchworth for every traction.

Ilford is used by LO, MTR Crossrail, and Greater Anglia. Willseden was used by Caledonian Sleeper and Chiltern in addition to LO. Splitting depots/stabling isn't beyond the wit of the railway industry

Also is there some sort of discount for GTR for having 2 contracts with Siemens- one for 700s, one for 717s. Would that discount not be lost if they were split between 2 operators. Again assuming maintenance isn't taken care of by the ROSCO.

No - the 700s are on a completely separate system to the 717s, there is no 'discount'. The 700 contract was arranged through DfT, GTR have very little input into it.
 

AlbertBeale

Established Member
Joined
16 Jun 2019
Messages
3,188
Location
London
...

Will the 717s all be berthed at Hornsey/Hertford North (Or will they 'rent' siding space at Welwyn/Letchworth from GTR) ? Are they going to keep driver depots at Welwyn and Hitchin ? Or transfer those drivers with the additional PT&R costs

...

Sorry - but what are "PT&R" costs?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,916
Location
UK
I also don't have issues with Thameslink either, except for the engineering works when I have to drive to get somewhere but that affects LNER, HT and GC too. In fact, I'm thinking for when I buy a house, I'll stick with being close to a Thameslink station as there are direct trains to my work in Farringdon and when I travel, it's at least 3tph (4tph pre-COVID). LNER would be too costly for a daily commute and less frequent too.

The blockades on the ECML may be a thing for a while, with the KGX works and then the new signalling, but once done it would stand to reason that this would be a line you'd value living near given the extra capacity boost (and maybe by then HS2 taking off some pressure for IC services and more local services being possible).

The GN inners, or perhaps LO one day, has its own capacity constraints but we may well be seeing a shift towards more people working from home as a matter of course - and the City of London that these trains serve will potentially see the biggest changes. Some of those new office blocks going up, or existing ones, may one day be partially or completely remodelled for residential living.
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,892
Sorry - but what are "PT&R" costs?

'Promotion, Transfer and Redundancy'

In this instance, if work were moved from one train crew depot to another resulting in drivers being forcibly transferred, there could be additional costs of travelling time/car mileage payment. In certain circumstances of distance and extra travelling time taken, interest payments on a mortgage if a house move has to take place is also written down in the arrangements.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,916
Location
UK
I think Grant Shapps has wanted LO to take over for some time and has been very vocal about it - having once shown a letter from TfL that specifically mentioned more services to/from Brookmans Park (his home station). This was during the 2018 timetable fiasco, when anger was quite high and justified.

I too have 'predicted' this would happen for around 15 years!

However, it seems more unlikely today given the integration of GN inner services with other GN and TL services, as well as the financial troubles of TfL, plus now it seems Grant prefers to travel from Potters Bar and presumably on faster trains. Maybe he's less bothered as he once was!!

We shall see, but if TfL was going to do it then all the changes at Stevenage and the all-new trains, plus recently revamped inner stations, clean tunnels, new signalling due to be done and talk of leaky feeders to provide phone coverage, it seems that they won't have much to spend besides the logistical issues mentioned by others.
 

James H

Established Member
Joined
25 Jun 2014
Messages
1,546
It doesn't display much confidence in the national network when the transport secretary wants to transfer the train service he uses himself to be outside his own jurisidiction
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,145
It doesn't display much confidence in the national network when the transport secretary wants to transfer the train service he uses himself to be outside his own jurisidiction

Although he has just bailed out TfL and put two DfT people on its board as one of the conditions.
 

Geogregor

Member
Joined
16 Sep 2016
Messages
458
Location
London
How are TfL going to afford this ?

The question is how is anyone going to afford anything. That question applies to pretty much any form public transport. With usage subdued probably for years...

Funding of public transport infrastructure and its operation post-Covid need a proper rethink. In that respect moving GN to TfL is a small change...
 

Envy123

Member
Joined
9 Apr 2015
Messages
633
Location
Peterborough
The blockades on the ECML may be a thing for a while, with the KGX works and then the new signalling, but once done it would stand to reason that this would be a line you'd value living near given the extra capacity boost (and maybe by then HS2 taking off some pressure for IC services and more local services being possible).

I already value the ability to go direct to the core and GTR's smart ticketing. Being able to tap and go is a convenience that I wouldn't get if I went further north (to Peterborough). But yes, even more capacity would be great.
 

choochoochoo

Established Member
Joined
6 Aug 2013
Messages
1,318
The question is how is anyone going to afford anything. That question applies to pretty much any form public transport. With usage subdued probably for years...

Funding of public transport infrastructure and its operation post-Covid need a proper rethink. In that respect moving GN to TfL is a small change...
Judging by the number of people I saw out and about using trains yesterday, it won't be long before the money comes back.

Ok for a while there will be less commuters, but there were too many travelling for the capacity available in the peaks anyway.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,916
Location
UK
It doesn't display much confidence in the national network when the transport secretary wants to transfer the train service he uses himself to be outside his own jurisidiction

Logistics aside, I think taking the inners into LO makes sense….

Although he has just bailed out TfL and put two DfT people on its board as one of the conditions.

...especially after you've bailed out TfL and might potentially seek to take further control.

Maybe London Overground, which is already a normal railway service anyway, will actually be taken out of TfL control? Then it merely becomes a brand. Far easier to manage then.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,006
Location
London
A FCC-style breakup of GTR would be better IMO, with the TL and GN brands simply kept as they are now.

Breaking up GTR now would be a mistake based on the errors of the past as opposed to the current performance. It’ll be a nightmare too as so many things are finally integrated between the 4 brands (other than pay grades etc but that was never going to happen!).

People involved in GTR have long expected it be split up again, as GTR was only expected to be temporary due to the mass disruption to the franchise. However in the current circumstances, I suppose it is more in doubt.

This would clearly have an effect on any LO takeovers.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,290
People involved in GTR have long expected it be split up again, as GTR was only expected to be temporary due to the mass disruption to the franchise. However in the current circumstances, I suppose it is more in doubt.

This would clearly have an effect on any LO takeovers.
You don’t need to have been that involved in GTR, splitting up was always in the public domain from the TSGN franchise spec onwards.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,006
Location
London
You don’t need to have been that involved in GTR, splitting up was always in the public domain from the TSGN franchise spec onwards.

Indeed, was very publicly clear. A lot of people have started considering this breakup again now having spent years cobbling it together!
 

James90012

Member
Joined
21 Sep 2016
Messages
186
I think there is a case to move the Moorgate services over to TfL - for example the May 18 timetable change saw severe disruption to the Moorgate services which seemed to be solely a factor of being part of the integrated GTR operation despite being largely segregated operationally.

I also think removing the GN peak inners from an integrated operation with Thameslink would be a mistake, there's no reason that these need to be branded Great Northern either - I would just subsume these within Thameslink as the services from King's Cross and St Pancras work together to provide the peak capacity needed on the ECML.

The GN King's Lynn and Cambridge are more interesting - clearly if GN was abolished the choice is for the service to stay with the new Thameslink or to move to LNER - which is a choice for the DfT - retaining within Thameslink potentially with it's own brand wouldn't make Thameslink much smaller, and moving to LNER could generate a case for upgrading the level of service albeit at a cost.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
The GN King's Lynn and Cambridge are more interesting - clearly if GN was abolished the choice is for the service to stay with the new Thameslink or to move to LNER - which is a choice for the DfT - retaining within Thameslink potentially with it's own brand wouldn't make Thameslink much smaller, and moving to LNER could generate a case for upgrading the level of service albeit at a cost.

The other alternative might be for the King's Lynn service to move over to Greater Anglia, sharing traincrew resource at Cambridge and King's Lynn. Don't think the service really needs "upgrading".
 

Geogregor

Member
Joined
16 Sep 2016
Messages
458
Location
London
Judging by the number of people I saw out and about using trains yesterday, it won't be long before the money comes back.

Ok for a while there will be less commuters, but there were too many travelling for the capacity available in the peaks anyway.

Where was that? Trains in SE London are deserted...
 
Status
Not open for further replies.

Top