Can someone explain to me why it's considered so difficult to build a flyover at Newark? Given that the crossing currently only handles one or two movements an hour on the Notthingham-Lincoln line, you would only need a single-track straight viaduct, rising over the ECML. There seems to be plenty of space to do this. From the crossing, I measure 800m SW to the A46 bridge, and 1200m NE to the A1 bridge. And yet the new flyover at Hitchin only needed 660m to rise from the point of divergence to cross the ECML.
If ground conditions are poor, then you just need deep piles to support the pillars of the viaduct.
If vertical curvature is the problem, there is 400m between the A46 and Newark Castle station to dig down a bit so that you can go under the A46 on a rising gradient; and the crest of the viaduct could be 200m beyond the ECML crossing itself and still allow space to curve down and fit under the A1. (In which case the junction to access Northgate would have to be North of the A1 bridge, at which pont the line could become double-track again.)
Or am I missing something?
If ground conditions are poor, then you just need deep piles to support the pillars of the viaduct.
If vertical curvature is the problem, there is 400m between the A46 and Newark Castle station to dig down a bit so that you can go under the A46 on a rising gradient; and the crest of the viaduct could be 200m beyond the ECML crossing itself and still allow space to curve down and fit under the A1. (In which case the junction to access Northgate would have to be North of the A1 bridge, at which pont the line could become double-track again.)