I'd divert those services that run via the Met to Baker Street as LUL S8 services.
We'll ignore that the Met doesn't have the track capacity to handle the and just continue treating that line as an aside.
Again: If having a short section of adjacent track with a different electrification is something that pushes back electrification of the Birmingham suburban routes, why isn't it a problem for the London suburban routes?
Phase 2 would cover the Cotswold Line into Worcester (with Hereford-Shrub Hill getting handed to the Turbos from/to Bristol.)
(Oxford-Worcester is off-topic for this thread, but I'm developing a point here) Why hand Worcester-Hereford to Turbos?
You don't even need to buy hybrid trains to run the mostly electrified route as they already run on the (much-less electrified) route currently!
I'm pointing this out as it shows how warped you are when it comes to the idea that hybrid trains exist. Not only is your desire to fully electrify routes so services don't have to run diesels better served by wiring Birmingham suburban routes than Oxford-Coventry, but it's not even necessary anyway!
Warwick - Leamington would be a phase 2 job, with potentially Stratford UA - Warwick being a phase 2A, and phase 3 was to cover both approaches to Snow Hill from the east, as well as Kiddy (Worcester to Kiddy would get as part of phase 4 as part of the Cotswold services returning to Hereford, and the Cheltenhams running from Shrub Hill up to Stourbridge/a new station at Brierley Hill).
Sure, but I'm working on the assumption that Birmingham suburban electrification happens before your Stratford/Coventry to Oxford/Bicester 'phase 2', and so naturally Stratford - Warwick - Leamington would be swapped should the order of the phases swap.
And given your aversion to hybrid trains, why on earth did you end phase 3 at Kidderminster and thus not do the full route to Worcester? Are you proposing run a third of the stopping service through Birmingham as diesels and the rest as electric? Or are we looking at Worcestershire shuttles here? Even more bizarre as you have already wired up Worcester itself as part of phase 2 under your plan!
It was my thinking that the Voyagers could then run over the NE/SW route doubled up, or even replace HSTs at Scotrail!
They very well could (I'd assumed they would have been cascaded down to the XC regional routes), however if you are XC getting new stock, they'd be hybrid as more flexible for the franchise - even if they keep the Voyagers and run them doubled up.
And once this is grasped, then we can look at the case for Leamington-Banbury-Oxford electrification rationally (Coventry-Leamington will be Birmingham suburban, and electrified for those reasons, in the timescales involved, according to the regional aspirations for the Coventry corridor) rather than having "Manchester-Bournemouth needs to be fully electric" as the overriding dogma driving notions of what electrification is more important north of the Ridgeway.
Suburban electrification has massive advantages: acceleration gains, removal of diesel fumes from large urban areas, busy lines, easier to get the whole route converted. Electrifying through Banbury is infill - it makes a lot more sense when the urban stuff either side is done.