• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Your ideas for future uses of Class 91s and Mk4 coaches

Status
Not open for further replies.

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,739
As TfW will be using Mk4's on some Holyhead to Cardiff services I think that ALL North to South Wales services should be operated by Mk4's and possibly even the Liverpool to Cardiff services when they are introduced. This would allow more of the new trains to operate/strengthen other services.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
As TfW will be using Mk4's on some Holyhead to Cardiff services I think that ALL North to South Wales services should be operated by Mk4's and possibly even the Liverpool to Cardiff services when they are introduced.
That's not very easy to do, as they'll be portion-worked with a Liverpool-Llandudno service. (I presume you don't want to start shunting coaches at Chester on an hourly basis.)
 

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,739
That's not very easy to do, as they'll be portion-worked with a Liverpool-Llandudno service. (I presume you don't want to start shunting coaches at Chester on an hourly basis.)
I did not realise that both services would join to go to Liverpool as I thought they were separate services.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,855
Mark 4s with 90s or 91s should be used by Cross Country for Manchester - Birmingham shuttles. Freeing up Voyagers to strengthen other services.
 

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,739
Mark 4s with 90s or 91s should be used by Cross Country for Manchester - Birmingham shuttles. Freeing up Voyagers to strengthen other services.
But then Manchester would loose some or all of its through services to Southern England.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,855
But then Manchester would loose some or all of its through services to Southern England.
Run them through with a 67 on the front if through services are considered to be essential. Such services from the likes of Liverpool are already deemed to be unnecessary.
 

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,739
Run them through with a 67 on the front if through services are considered to be essential. Such services from the likes of Liverpool are already deemed to be unnecessary.
I don't know exactly how many passengers travel through Birmingham but when I went from Cheltenham to Stoke around 20-25 people stayed on just in the carriage I was in. Don't forget it is not just Manchester to the south journeys but also those from Wolverhampton, Stafford, Stoke as well as other places.
Perhaps if the proposed Manchester to Oxford service via East West rail ever happens then the Bournemouth Manchester service could be split at Birmingham but until that happens I think both through journeys should be kept.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,680
Mark 4s with 90s or 91s should be used by Cross Country for Manchester - Birmingham shuttles. Freeing up Voyagers to strengthen other services.

Run them through with a 67 on the front if through services are considered to be essential. Such services from the likes of Liverpool are already deemed to be unnecessary.
So where are the Voyagers going if you are now using 67s?
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Mark 4s with 90s or 91s should be used by Cross Country for Manchester - Birmingham shuttles. Freeing up Voyagers to strengthen other services.

But then Manchester would loose some or all of its through services to Southern England.

Main problem is that you'd have 1tph from Bristol/Exeter and 1tph from Bournemouth terminating at New Street with nowhere to go...not great for platform capacity at New Street.

And, yes, there does appear to be reasonable through demand.

Run them through with a 67 on the front if through services are considered to be essential. Such services from the likes of Liverpool are already deemed to be unnecessary.

Having platform capacity to attach/detach 67s seems...improbable.

And Liverpool and Manchester are very different markets.
 

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,739
Main problem is that you'd have 1tph from Bristol/Exeter and 1tph from Bournemouth terminating at New Street with nowhere to go...not great for platform capacity at New Street.
This may be a terrible idea but a way to solve platform capacity could be to have the service those 2 services joined up to run Bristol, Birmingham, Reading, Bournemouth. No one would use it as a through journey but it may free up platforms at new street but I have not checked the timings.

Keeping the through journeys as they are is the best option in my opinion though.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,304
Location
Glasgow
Run it with a 67 throughout
Only use a 90 if the full diagram is on electrified lines to reduce the locomotive changes

Considering how poor 67s are with any sort of load at getting up speed, that would likely significantly extend the journey time.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
This may be a terrible idea but a way to solve platform capacity could be to have the service those 2 services joined up to run Bristol, Birmingham, Reading, Bournemouth. No one would use it as a through journey but it may free up platforms at new street but I have not checked the timings.

Keeping the through journeys as they are is the best option in my opinion though.

It would have a hideous crossing move across the lot across New Street....and assuming the paths join up. E.g. the current xx.50ish arrival from Bournemouth doesn't match to the xx.40ish departure to Bristol at all well!
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
As TfW will be using Mk4's on some Holyhead to Cardiff services I think that ALL North to South Wales services should be operated by Mk4's and possibly even the Liverpool to Cardiff services when they are introduced. This would allow more of the new trains to operate/strengthen other services.
If TfW were to get any more than the 3 sets of mark 4s currently planned then I would suggest using the additional sets on Swansea-Manchester services (in 5-car rakes), rather than making any more of the Holyhead-Cardiff runs LHCS. Through services between Cardiff and Carmarthen would be maintained by introducing new DMU-operated services via the Swansea District Line.
 

krus_aragon

Established Member
Joined
10 Jun 2009
Messages
6,105
Location
North Wales
Through services between Cardiff and Carmarthen would be maintained by introducing new DMU-operated services via the Swansea District Line.
Or potentially by extending this open access Bristol - Swansea service that's been applied for.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,304
Location
Glasgow
If TfW were to get any more than the 3 sets of mark 4s currently planned then I would suggest using the additional sets on Swansea-Manchester services (in 5-car rakes), rather than making any more of the Holyhead-Cardiff runs LHCS. Through services between Cardiff and Carmarthen would be maintained by introducing new DMU-operated services via the Swansea District Line.

On all the Swansea-Manchester or just certain services?
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
Or potentially by extending this open access Bristol - Swansea service that's been applied for.

On all the Swansea-Manchester or just certain services?
This is all hypothetical anyway as I'm not aware of any plans for TfW to get more than the initial 3 mark 4 rakes. But if they did get any additional mark 4 rakes then in my opinion they should be in 5-car formations (or more if the demand requires it) and used on Swansea-Manchester, whether that would be all services on the route depends on how many (hypothetical) additional mark 4 rakes we are talking about. If enough mark 4 rakes were available to cover all Swansea-Manchesters plus the 3 per day Holyhead-Cardiff then yes, that's what I think would be the best thing to do with them on the franchise.
 

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,739
If TfW were to get any more than the 3 sets of mark 4s currently planned then I would suggest using the additional sets on Swansea-Manchester services (in 5-car rakes), rather than making any more of the Holyhead-Cardiff runs LHCS. Through services between Cardiff and Carmarthen would be maintained by introducing new DMU-operated services via the Swansea District Line.
I like the sound of a faster Carmarthen to Cardiff service but are there many through passengers from West of Swansea who go past Cardiff?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,304
Location
Glasgow
This is all hypothetical anyway as I'm not aware of any plans for TfW to get more than the initial 3 mark 4 rakes. But if they did get any additional mark 4 rakes then in my opinion they should be in 5-car formations (or more if the demand requires it) and used on Swansea-Manchester, whether that would be all services on the route depends on how many (hypothetical) additional mark 4 rakes we are talking about. If enough mark 4 rakes were available to cover all Swansea-Manchesters plus the 3 per day Holyhead-Cardiff then yes, that's what I think would be the best thing to do with them on the franchise.

Well yes it's hypothetical but if you did use wholly Mk4s on Swansea-Manchester that's going to free up a good number of units.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
I like the sound of a faster Carmarthen to Cardiff service but are there many through passengers from West of Swansea who go past Cardiff?
I've got no hard facts to go on there but my gut feel is that Cardiff seems to be one of the big draws. Possibly some go to Newport, but I doubt many pepole from Llanelli and points west stay on the Manchesters beyond there (some do of course, but I doubt having to change would put many of them off). Why? Because once you start heading north again going via Cardiff starts to become quite a big detour and rail less and less competitive (particularly since the current service goes via Swansea which means even getting from Carmarthen to Cardiff is sadly slower than driving at present). Apart perhaps from passengers to Newport, most passengers going beyond Cardiff from S.W.Wales will probably be changing there anyway onto London/Bristol/Cheltenham services. With Swansea-Manchester, the starting point is a bit further south than Carmarthen so going via Cardiff is much less of a detour than Carmarthen-Manchester (if you wanted a train to do that your best bet would be going back in time and pleading to keep the line to Llandelio open).

Well yes it's hypothetical but if you did use wholly Mk4s on Swansea-Manchester that's going to free up a good number of units.
Ideally if you were going to do it you'd have planned it in advance and ordered less new DMUs, but at the very least freeing up the 3-car units that are planned for Swansea-Manchester to instead be used on the Cambrian (minus first class which apparently won't be fitted when they are first delivered anyway) would be no bad thing.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,304
Location
Glasgow
Ideally if you were going to do it you'd have planned it in advance and ordered less new DMUs, but at the very least freeing up the 3-car units that are planned for Swansea-Manchester to instead be used on the Cambrian (minus first class which apparently won't be fitted when they are first delivered anyway) would be no bad thing.

See, I wouldn't reduce the DMU order, because then you have additional causality available which could in affect future-proof things somewhat. In my mind you can never have too much capacity!
 

yoyothehobo

Member
Joined
21 Aug 2015
Messages
853
Can we run them, with just 2 coaches and a DVT to make class a 91 GTI like i used to have on my train set. You could even run them with one coach, fill the DVT full of batteries and run them as a bimode class 153 replacement...

In all seriousness is the general feeling that the majority of sets will either be split up, or at least reduced in length?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,304
Location
Glasgow
Can we run them, with just 2 coaches and a DVT to make class a 91 GTI like i used to have on my train set. You could even run them with one coach, fill the DVT full of batteries and run them as a bimode class 153 replacement...

In all seriousness is the general feeling that the majority of sets will either be split up, or at least reduced in length?

My feeling is most will be scrapped
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,270
In all seriousness is the general feeling that the majority of sets will either be split up, or at least reduced in length?
There are four documented users, only one (GU Cardiff) is proposing full length, and the other three (TfW, Alliance Blackpool and LNER Edinburgh) are all proposing short forms.

Then once you consider that the Cardiff service is highly unlikely to be approved, then there’s your answer...
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,859
See, I wouldn't reduce the DMU order, because then you have additional causality available which could in affect future-proof things somewhat. In my mind you can never have too much capacity!
I see your point but I'm concerned that large numbers of new DMUs would create a serious dent in rail's environmental credentials. There is now a (non-binding?) net zero emmisions target for 2050, and to keep warming below 1.5 degrees that probably needs to be sooner. Given a 30 year life, today's new DMUs would still be running in 2050. Replacing trains more often than necessary (eg. a 15 year life rather than 30) also has implications due to the energy use / 'embodied carbon' of building the new fleet.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,304
Location
Glasgow
I see your point but I'm concerned that large numbers of new DMUs would create a serious dent in rail's environmental credentials. There is now a (non-binding?) net zero emmisions target for 2050, and to keep warming below 1.5 degrees that probably needs to be sooner. Given a 30 year life, today's new DMUs would still be running in 2050. Replacing trains more often than necessary (eg. a 15 year life rather than 30) also has implications due to the energy use / 'embodied carbon' of building the new fleet.

Simply when you can electrify and buy new electric stock, I'd then cascade the new DMUs (which should be more efficient) to replace the older types still in service and keep cascading the newest types down to work to get rid of the oldest until the point where everything is electrified or perhaps run by battery or some other form of propulsion.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,036
It would have a hideous crossing move across the lot across New Street....and assuming the paths join up. E.g. the current xx.50ish arrival from Bournemouth doesn't match to the xx.40ish departure to Bristol at all well!

There's the other option of XC moving some services to Moor Street early (i.e. before HS2) as this could then free up paths for electric trains through New Street, see my post below from another thread:

A lot had been said about trying to fit the XC services into New Street along with an EMU/electric loco and coaches.

However there could be another option, which could work.

Given that post HS2 the XC services have been suggested to be moved to Moor Street could this move be brought forwards (at least for the South Coast services).

In doing so there could be paths through New Street for the electric trains to/from Manchester. If these could be run to have a change from the Voyager services at stations like Leamington Spa, Coventry, or Birmingham International. This would, however, require an extra change, but for those going to Birmingham not much of a difference and those passing through no difference. However it could enable extra services to be run in pairs.

The South West/Manchester services appear to almost match (in terms of departure xx:31/following arrival xx:33) with a 17 minute sitting at the platform, so although they may take up a bit more space in terms of getting in and back out again, it's only one service an hour and there's still a little scope for turning the units around (although may need to make use of onboard cleaners to achieve this) even if they're a few minutes late.

It should free up 7 Voyagers to be able to run extra services.

Also be removing the Manchester leg of the South West services it could be argued that these services could be run by HST's without incurring too much of a time penalty (especially if they were 2+5 or 2+6).

Using the existing mark 3 coaches which XC have they look like that they have enough to run an hourly service to Paignton with 2+5 coaches (8 trains, which would require an extra 6 class 43's). However as they don't always run that far down chances are they could make it work with 2+6 coaches (7 trains, which would require them to convert 2 extra mark 3 coaches and have an extra 4 class 43's).

Although that would mean no more 8 coach HST's, it would allow quite a few more 8, 9 or 10 coach Voyagers as well as longer trains between Birmingham and Manchester.

Would there be any deal breakers in doing so?
 
Status
Not open for further replies.

Top