ScotRail HST Introduction - Updates & Discussion

Status
Not open for further replies.

47271

Established Member
Joined
28 Apr 2015
Messages
2,983
Also, due to extra height of a MK3 carriages compared to that on a unit
It's not just the height, it's the way that the step tapers away at the carriage end.

The other day someone showed me a photo of a classic HST door at the notoriously low Dunkeld platform - I knew it was bad on a 170 but oh my God, even an Olympic gymnast would have to think twice about that one. That station seriously needs sorting out ASAP as soon as they know what's happening with the A9, it's an even bigger disgrace than ever with an HST service.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CEN60

Member
Joined
17 Dec 2018
Messages
299
It's not just the height, it's the way that the step tapers away at the carriage end.

The other day someone showed me a photo of a classic HST door at the notoriously low Dunkeld platform - I knew it was bad on a 170 but oh my God, even an Olympic gymnast would have to think twice about that one. That station seriously needs sorting out ASAP as soon as they know what's happening with the A9, it's an even bigger disgrace than ever with an HST service.

Not that easy - big issues to sort out Dunkeld - the building is listed - the footbridge is listed - all which have an interface with the problem platforms making alterations extremely difficult!
 

FQ

Established Member
Associate Staff
Quizmaster
Joined
4 Oct 2013
Messages
6,645
Location
-
The other day someone showed me a photo of a classic HST door at the notoriously low Dunkeld platform - I knew it was bad on a 170 but oh my God, even an Olympic gymnast would have to think twice about that one. That station seriously needs sorting out ASAP as soon as they know what's happening with the A9, it's an even bigger disgrace than ever with an HST service.
Indeed, I've used an HST at Dunkeld before (off the southbound Chieftain and onto a northbound Scotrail HST so got to try both platforms) and they were so low it was comical. Great fun though, just brought the child out in me leaping up into the vestibule from the platform.
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,026
Regarding trying to get the refurbished sets from Wabtec to Edinburgh, could a LNER driver do that being as they are familiar with the traction type?

This is of course assuming that LNER have enough drivers and ones who are willing to do a few hours overtime.
Of course not, they will likely be delivered as planned, not to suit those on Rail Forums!
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,907
Location
North
Not that easy - big issues to sort out Dunkeld - the building is listed - the footbridge is listed - all which have an interface with the problem platforms making alterations extremely difficult!
Why not just lower the track? Can be as cheap as raising a platform sometimes.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
As long as the platform foundations are strongly built enough to handle the removal of support.
...and there aren't any underbridges nearby. It looks as though there is one at the west end of Dunkeld station which might complicate things.
 

DirtyJohn

Member
Joined
24 Mar 2019
Messages
15
You are right. "Fiasco" is a good description of this project. At least the Fyra trains actually arrived at some point.

For factual accuracy, can we understand the following (correct me please if I am wrong):

  • Three refurbished HSTs, of 27, have been delivered.
  • One is in daily service.
  • Set's two and three have carried no passengers (?)
  • Set four is "ready" but unable to depart due to lack of paths/lack of drivers/it doesn't work properly.
  • Set five is "imminent".... as of 1st May.
  • There are 22 sets to be delivered by 31st December this year.....

Around 12 sets have been stripped already.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Seems to be having a long PNB at Drem! Seems an odd place to swap crew.
 

Morayshire

Member
Joined
6 Feb 2019
Messages
302
RTT suggests it arrived 134 minutes early at Drem Passenger loops. Left on time by the looks of it.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,117
Or if it was a driver change then maybe the new driver arrived on time rather than 2 hrs early?
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,593
Seems to be having a long PNB at Drem! Seems an odd place to swap crew.
Good place to swap a freight driver who signs the east coast route for a Scotrail driver who signs North Berwick and the Scotrail depot it was ending up at
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,703
Location
Scotland
Good place to swap a freight driver who signs the east coast route for a Scotrail driver who signs North Berwick and the Scotrail depot it was ending up at
True. But it had 40 minutes at Millerhill, and I'd expect most ECML north freight drivers would sign Millerhill, no?
 

Steven_G

Member
Joined
5 Mar 2018
Messages
143
I take it having 170’s on the 7cities routes are due to training and not lack of HST’s?

Correct me if I am wrong but do we now have refurb and classic sets available for training at all depots ?

Should mean that crew training should complete much more quickly and the 170’s can go back to their original planned routes (is that fife circle and borders ?)....which in turn means less cancellations and short forms?
 