Northern Unit Refurbishments and depot allocations.

jan5468

Member
Joined
7 Aug 2016
Messages
13
I was on this unit yesterday on the Manchester Stalybridge shuttle, and I was quite impressed; it is the first refurbed 150 unit that I would say is in an "as new" condition.
.... I quite like the carpeted walls (though I don't know why).
I'm on 150123 now and although it doesn't look bad, is certainly not in as new condition.
Has scratches on the internal glass panels, very rattly and the carpeted walls are a bit threadbare in places with oversprayed paint on the edges. It's an ex FGW unit and the carpet is the purple and turquoise they used.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LM93

Member
Joined
9 Apr 2018
Messages
49
Location
Walkden
Updated list. If there's anything I've missed or any mistakes, please let me know.

Units in red are in the Northern Rail livery or their former operator's livery.
Units in blue are in the Northern or Northern base livery.
Units in bold are refurbished.
Units with a ^ are out of service for repaint/refurbishment/PRM mods.
Units with a * have received PRM modifications.
Units with a $ are currently stored/out of service.
Units in italics have not arrived yet.

Class 150s
150123*

I'm on 150123 now and although it doesn't look bad, is certainly not in as new condition.
Has scratches on the internal glass panels, very rattly and the carpeted walls are a bit threadbare in places with oversprayed paint on the edges. It's an ex FGW unit and the carpet is the purple and turquoise they used.

I don't think this one has been fully refurbished yet, if we go off 507021's list.
 

tommy_train

Member
Joined
5 Apr 2016
Messages
44
I'm on 150123 now and although it doesn't look bad, is certainly not in as new condition.
Has scratches on the internal glass panels, very rattly and the carpeted walls are a bit threadbare in places with oversprayed paint on the edges. It's an ex FGW unit and the carpet is the purple and turquoise they used.

I've since been on another ex-FGW 150 (not yet refurbed) , and the carpet on the wall is, as you said, the same; it was filthy, but there we go.

I didnt recognise the colour as purple (I am colourblind), so I am guessing that to regular people, it clashes with the seats?

It doesn't surprise me that Northern have done the refurb like this, but at least the things are clean when they come out of the works :p
 

Class37.4

Member
Joined
8 Oct 2018
Messages
125
Another extremely Polished Turd coming back, putting it politely, putting less politely a lick of paint for a piece of British Leyland garbage.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,861
Location
west yorkshire
I think someone posted that around 140 units still need prm work so with 14months left that's 10 a month which I think is considerably more than being achieved with roughly 5 units away at once and months or even years of work on each.
Wonder what plan B is.
K
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,188
I think someone posted that around 140 units still need prm work so with 14months left that's 10 a month which I think is considerably more than being achieved with roughly 5 units away at once and months or even years of work on each.
Wonder what plan B is.
K
Counting up off the last list I make 92 non PRM units including what's in the works. Still 9 a month though to get done.
 

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
If/when the bolton line is up and running it might free up some DMUs has most services will go to EMU operation and use the pacers and refurbed DMUs for the diesel work and probably the newbies might make appearances on the rails in the new year as well
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,861
Location
west yorkshire
Counting up off the last list I make 92 non PRM units including what's in the works. Still 9 a month though to get done.
I suspect the difference is 92 non PRM units but 140 needing the full Northern treatment. Doing PRM on units a month seems an impossible task on past performance.
K
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,845
Counting up off the last list I make 92 non PRM units including what's in the works. Still 9 a month though to get done.
Errrrr. There’s 13.5 months left to go until the deadline. I make it around 7 units per month on that basis - remember conversions don’t have to be done by 31/12/19, they just have to be stopped for conversion by then.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,861
Location
west yorkshire
Tall order then but I suppose they could make 4 car units with non PRM and a PRM fitted 2 cars.
Incidentally I note from above the penultimate for refreshing and PRM rustbucket 155 343 has just headed for Kilmarnock (Brodies?). On past performance I can't see the 155 program being completed for the Dec12 end date. Lots of 158 to do too.
K
 

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
Tall order then but I suppose they could make 4 car units with non PRM and a PRM fitted 2 cars.
Incidentally I note from above the penultimate for refreshing and PRM rustbucket 155 142 has just headed for Kilmarnock (Brodies?). On past performance I can't see the 155 program being completed for the Dec12 end date. Lots of 158 to do too.
K

155342 has just been refurbished, it's 155343 which has gone to Kilmarnock.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,188
Errrrr. There’s 13.5 months left to go until the deadline. I make it around 7 units per month on that basis - remember conversions don’t have to be done by 31/12/19, they just have to be stopped for conversion by then.

Yes of course, no idea where I got that maths from!

Also, 170474 is now.back out the shed at Crewe and was shunting round the yard earlier so presumably will be released into the wild soon.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,845
Tall order then but I suppose they could make 4 car units with non PRM and a PRM fitted 2 cars.
Incidentally I note from above the penultimate for refreshing and PRM rustbucket 155 343 has just headed for Kilmarnock (Brodies?). On past performance I can't see the 155 program being completed for the Dec12 end date. Lots of 158 to do too.
K
Why? It hasn’t taken 12 months to do the last few sets.
 

507021

Established Member
Joined
19 Feb 2015
Messages
4,759
Location
Chester
Why? It hasn’t taken 12 months to do the last few sets.

Agreed, I've noticed each 155 seems to be done a bit quicker than the previous unit.

Mind you it's the same for all refurbishments though, once the first couple of units are done then the rest don't take as long to complete.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,354
Location
Yorkshire
A friend at Northern told me recently only two 150/9s are to be formed, with the other 150s staying as two car units.
Not to cast aspersions on your contact, but a fleet of just two 3-car units would seem rather pointless. If there was a service which required 2 diagrams there'd be no spare (HUD-SHF is earmarked for 3-car 150s but requires 3 diagrams), and a service requiring only one diagram would mean the other as a spare, which would seem wasteful.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Not to cast aspersions on your contact, but a fleet of just two 3-car units would seem rather pointless. If there was a service which required 2 diagrams there'd be no spare (HUD-SHF is earmarked for 3-car 150s but requires 3 diagrams), and a service requiring only one diagram would mean the other as a spare, which would seem wasteful.

Are not the 2 Hybrid toiletless units 57209 and 57212 currently running as 150209 going to be split to form 3 Car Sets
 