For a relatively small proportion of that time , yesDo you think they might have been ill?
For a relatively small proportion of that time , yesDo you think they might have been ill?
But this is what we are all up against. The timetable is being drawn up by idiots who have never worked a train. But timetabling is a complex thing, and this is why the chaos last May commenced.Also what about mobilise / demob (or whatever local term is) - is that gone too? Surely can't have agreed a lower turnaround time than that. This would be laughable if it wasn't such an embarrassment to the industry!
Were you his GP at the time?For a relatively small proportion of that time , yes
Then you don't know everything do you. Here goes. Look it up. Crew changing ends at Lancaster = turn around.
LANCASTER 14.51
BARE LANE 1456
MORECAMBE 15.00
MORECAMBE 15.03
BARE LANE 15.07
LANCASTER arr 15.13
LANCASTER to LEEDS dep 15.15.
So why are staff side selling turnaround times so much? The Weymouth example presumably wanted a longer break than turnaround time - but must have been inside whatever continuous driving time had been sold by the union which would be between toilet (natural) breaks or whatever the local term is? Crews are an incredibly expensive resource of course.Short turn rounds aren’t only a Northern issue.
Bristol Temple Meads to Avonmouth and Severn Beach 2/3 minute turn rounds.
If one of the services got delayed enroute the only way get the branch services out of mounting delays was to turn back short at Clifton Down or cut out a service all together.
Another cracker was Bristol Temple Meads to Weymouth with a 8 minute turn round, in that time the crew (who has brought it down from Bristol) had use the toilet (through two security dorks and a 200 yard walk), change ends, and set the cabs up.
The response from diagram unit was it’s “legal” as in within parameters. When you take the diagram planning away from Hunan beings with years of experience and replace them with inputted “legal” parameters into a computer program don’t be surprised when your timetable falls to bits.
All in the name of efficiency, yesterday costing a fortune tosay, repeat this across every TOC and the costs are eye watering, but the only way to reduce costs is to get rid of guards....
No, the (minimum) parameters are what the unions have agreed... if they are nonsensical then all sides are at fault for agreeing them and using them.The computers aren’t the problem, I assume the problem is that they didn’t use the correct humans to input the parameters? Unless the parameters are far too restrictive.
So why are staff side selling turnaround times so much? The Weymouth example presumably wanted a longer break than turnaround time - but must have been inside whatever continuous driving time had been sold by the union which would be between toilet (natural) breaks or whatever the local term is? Crews are an incredibly expensive resource of course.
The computers aren’t the problem, I assume the problem is that they didn’t use the correct humans to input the parameters? Unless the parameters are far too restrictive.
So have staff side offered to sell it back for longer turnarounds balancing company vs crew requirements? They are elected by to represent traincrew...Staff, as in traincrew don’t get a say. That’s the officials who work these things out - we never got a way, nor were we asked.
Walking time parameters are often decades old, based on sometimes single vehicle trains.
To get a walking time reevaluating is pretty much impossible, as a slight increase could end up costing millions as the ripple effect across multiple diagrams could be huge.
The company have worked out it’s cheaper to pay the delays and screw the passengers than alert the diagrams which will cost more money in wages to new lengthened diagrams.
LANCASTER 14.51
BARE LANE 1456
MORECAMBE 15.00
MORECAMBE 15.03
BARE LANE 15.07
LANCASTER arr 15.13
LANCASTER to LEEDS dep 15.15.
No, the (minimum) parameters are what the unions have agreed... if they are nonsensical then all sides are at fault for agreeing them and using them.
They’ll be reduced in pay talks. Pay me more, I’ll agree lower turnaround. Or reduced walking time. “Productivity” Etc.Ps for the outsider....what is meant by “the staff side selling turnaround times” please?
Ps for the outsider....what is meant by “the staff side selling turnaround times” please?
They’ll be reduced in pay talks. Pay me more, I’ll agree lower turnaround. Or reduced walking time. Etc.
Coincidentally latest release from the RMT is that's it's a 'scandal' that journey times are getting longer, so obviously Mick Cash and the RMT fully support faster changeovers mid-journey.https://www.rmt.org.uk/news/rmt-on-new-research-today-from-the-tuc/
RMT Press Office:
Rail union RMT on new research today from the TUC showing that the daily commute is taking longer
RMT General Secretary Mick Cash said;
"Britain's commuters, robbed blind by greedy private train companies, are being forced to travel greater distances as they are priced out of our towns and cities. They are a captive market being exploited for shareholder gain. It's a national scandal and the only solution is public ownership.
"The pressure of longer commuting times also piles stress onto infra structure, capacity and staff. We need investment in services that reflects those demands and that will only come through a publicly owned railway freed from the profit motive."
Ends
Yes, but have the staff side attempted to buy them back or just wanted them extended without a trade-off? It should be in notes somewhere what they were “worth” when sold.It doesn’t work like that.
Each turn round point has a agree time allowance, like I say often worked out years and years ago - left as was due to cost, as in the company not wanting to alter them to increase cost.
(WMT need to act in this way on the appallingly unpunctual and unreliable Liverpool-Brum service too, so Northern are not the only ones at it).
A few doted around.
Yes but part of the problem here is the location. Leaving Lancaster on time is never easy, and the 14.51 departure clashes with the 14.50 arrival from Barrow. Add into the mix any late running Virgin trains, and the ball is rolling.
It used to be 10 mins allowance between Lancaster and Morecambe. But to squeeze this in, they reduced it to 9. Now even if they arrive on time, changing the destination blinds, checking the headlights and tail lights. 3 minutes is the limit, add to that any disabled passengers and the problems mount. Then you have to get back onto the WCML again. Then change ends at Lancaster, then get out again. It is not hard to see how squeezing every last drop creates delays.
Is a departure (in the opposite direction) one minute after an arrival (I.e. a ‘re-occupation’ rather than a ‘headway’ issue) actually very unusual? I think that they used to be quite common at Leicester around xx25 a couple of years ago, for example.I've noticed at least 3-4 Skipton based conductors out on Saturdays over the past few weeks.
Don't Network Rail also have to agree to the schedules? So the clash with the 1450 arrival / 1451 departure should have been identified and amended before timetables were confirmed. At least that confirms why the 1451 often arrives Leeds late though!
I appreciate many are completely genuine with some sadly having to ultimately retire early due to ill health, however both examples I gave had at least 3 periods of around 6-9 months off over a 4 or 5 year period, eventually agreeing to resign, and (the last I heard) were still well enough to be carrying out almost identical work elsewhere, however probably a debate for another thread by HR expertsThe idea that someone can be off work for two years and nobody wants to know why. It does not happen in the real world.
All of those allowances (ie 2 minute turnaround) in the diagrams will have been agreed with the unions and therefore brought by the crews of course...
Sounds like the staff need to get their unions to insist on a review of the parameters.
A chance to be the reasonable ones trying to create a better service for the passengers in the face of incompetent management (if they do the PR correctly)