locally and in most of West Yorkshire that is how it is pronounced.STANDEDGE not Stanage please.
locally and in most of West Yorkshire that is how it is pronounced.STANDEDGE not Stanage please.
Oh I am sure just like Darwen is pronounced Darren by many.locally and in most of West Yorkshire that is how it is pronounced.
Doesn't matter how it's pronounced, it's still spelled Standedge.locally and in most of West Yorkshire that is how it is pronounced.
Electrification will form part of a rolling programme of Transpennine enhancements, according to Grayling's letter to the RIA:
https://www.railwayelectrification.org/blog/transpennine-electrification
"a rolling programme" !!!
What does that mean? Still rolling in 2075?
Agreed, it's avoiding saying "piecemeal patching up" so as not to admit they have abandoned the route upgrade.
This still (to me) points towards bi-mode fudge to avoid the supposedly insuperably difficult bits:
'...rolling programme of enhancements including major civil engineering projects and electrification.'
I don't get the impression that is 'fully electrified throughout' or it would have been something like '...of electrification and including major civil engineering projects.'
Might just be me though.
The letter states the intention is a near complete relaying of the line with multiple changes to alignment. I would say that counts as a route upgrade. There has been no back tracking on the budget of £3bn yet either.
That's made a bit tricky by the need to get power to the electrified sections. If electrification isn't continuous from the feeder station then a trackside feeder cable ("extension lead") would be needed to link up any isolated part. Not a big deal if it's just a dead section under a low bridge or two but if (hypothetically) the bit round Mirfield was left unwired pending re-modelling and Standedge was left unwired as too difficult, then anything in the Huddersfield area would need a long feeder cable or its own Grid feeder station (and incidentally the lead time to get a suitable Grid connections is at least five years). Going by the typical distances between existing feeders, a continuous electrification might not need anything more between the new one near Stalybridge and whatever exists around Leeds.It maybe that is what they plan - to electrify as they rebuild bits over the Control Period and then fill in the remainders of unaltered trackwork with wires for full electrification - we can but hope!
That's made a bit tricky by the need to get power to the electrified sections. If electrification isn't continuous from the feeder station then a trackside feeder cable ("extension lead") would be needed to link up any isolated part. Not a big deal if it's just a dead section under a low bridge or two but if (hypothetically) the bit round Mirfield was left unwired pending re-modelling and Standedge was left unwired as too difficult, then anything in the Huddersfield area would need a long feeder cable or its own Grid feeder station (and incidentally the lead time to get a suitable Grid connections is at least five years). Going by the typical distances between existing feeders, a continuous electrification might not need anything more between the new one near Stalybridge and whatever exists around Leeds.
To me the logical thing is to wire from Man Vic- Stalybridge Grid Feeder and also Leeds - York/Selby and then do other bits later. I must check where the other grid feeders were supposed to be.
EDIT - at 23.30 approx. says 2 grid feeders in addition to Heyrod - I assume the 5 year lead time does NOT start from official go ahead -otherwise that is crazy delay.
That's definitely happening AFAIAA, I've seen a lot more auto-transformer wires on the southern end of the route lately. Must be for the increased power demands of the 80x fleet, and the Desiro City units too. It stands to reason that AT will need to go further northwards to cater for the 80x' demands, so yes - Gascoigne Wood seems to be multi-purpose in that regard.There was also talk that this supply point was required for ECML requirements too - whether this work is ongoing and/or ordered I'm not sure.
If they are talking of having to relay the line then questions like , The Woodhead route - was it any faster? , If so , surley cheaper to rebuild.The letter states the intention is a near complete relaying of the line with multiple changes to alignment. I would say that counts as a route upgrade. There has been no back tracking on the budget of £3bn yet either.
Was the Woodhead route ever an alternative to the Standedge route? I thought one was only ever used for Manchester-Sheffield and the other only ever for Manchester-Leeds.If they are talking of having to relay the line then questions like , The Woodhead route - was it any faster? , If so , surley cheaper to rebuild.
It also makes the OLE Design a lot easier if the track design is firmed up or better still installed before OLE start work. Same for the signalling... when it's all being designed at once things inevitably change in one discipline which has huge knock on effects in others.Renewing the track before Electrification is a normal practice.
Its easier to do without the wires being there and you have more freedom in realignment work.
Gets expensive or severely limited in the amount of alteration after OHLE Masts are installed.
The letter states the intention is a near complete relaying of the line with multiple changes to alignment. I would say that counts as a route upgrade. There has been no back tracking on the budget of £3bn yet either.
Allegedly- partiallyAnd is this quasi new railway going to be electrified ?
Allegedly- partially
Time to call him and Grayling out now, then and ask (no, demand to know) why not? No evasions or platitudes will be accepted.Andrew Haines has apparently said TP electrification May now not take place in his view of Route Upgrade