Newbury Railcam shows work in progress (as I type) hanging wires under Boundary Road bridge.
All three lines are now wired past there.Newbury Railcam shows work in progress (as I type) hanging wires under Boundary Road bridge.
Maybe I should wheel the track maps back out again...Advance warning again for you all: I'm going to be out of the UK (sans laptop) from Saturday until Sunday the 5th of August, so apologies in advance for the lack of summative updates in that time.
All three lines are now wired past there.
There must be something they (the engineers) know that we don't.It is appalling that despite completing the new bridge over the line near St.Brides Wentloog months ago, that Network Rail have still not opened this minor road to traffic.
It’s likely to be a utilities issue. Often a bridge re-opens to rail traffic long before everyone else gets on with their bits...There must be something they (the engineers) know that we don't.
It is appalling that despite completing the new bridge over the line near St.Brides Wentloog months ago, that Network Rail have still not opened this minor road to traffic.
GWML Electrification: State of Play, week beginning 16/7/18.
All mileages given from Paddington, except where noted.
Paddington to Wootton Bassett Jct - LIVE
(...)
(...)
- Another note on the OLE to Wootton Bassett - testing with IETs will occur in July, and entry of IETs in AC passenger service occurs in September.
The bridge I am talking about is at the centre of this map:>https://www.google.co.uk/maps/@51.537622,-3.0420509,1409m/data=!3m1!1e3!5m1!1e1
The approach road from the south seems fine though I think that they should have had a wider ramp going up to the bridge. It has always been a through road.
Assuming you don't count Parkway as Bristol, the answer is some time after next spring, possibly.Does anyone know if and when the wires will reach Bristol?
Unless something has changed recently, current plans are to start electric operation west of the Didcot area on 1 Jan 2019. For safety reasons the wires as far as Wootton Bassett have to be regarded as live while testing takes place. There is still some way to go before an intensive electric service can be operated, and passenger services cannot be operated until authority is given by the ORR, due in December.Excuse my ignorance (I'm a Brit living in Switzerland and relatively clueless concerning UK railways), but do you mean to say with the last part that the class 800 trains will only start operating between London and Swindon under overhead electric power from September? If so, why the long wait? Have previous segments just after Didcot not been tested rigorously beforehand, as soon as they were installed? This seems like quite an inefficient wait to be honest if all the wiring has been essentially completed since around mid June. Also, does anyone know whether or rather when any of the class 800 trains will start operating on the Kemble - Stroud - Cheltenham branch? It's a pity that they don't intend to electrify that part of the network at the moment, but then the GWML electrification has been a bit of an unfortunate endeavor from what I gather. Maybe some day...
Unless something has changed recently, current plans are to start electric operation west of the Didcot area on 1 Jan 2019.
Another note on the OLE to Wootton Bassett - testing with IETs will occur in July, and entry of IETs in AC passenger service occurs in September.
Unless something has changed recently, current plans are to start electric operation west of the Didcot area on 1 Jan 2019. For safety reasons the wires as far as Wootton Bassett have to be regarded as live while testing takes place. There is still some way to go before an intensive electric service can be operated, and passenger services cannot be operated until authority is given by the ORR, due in December.
Oh wow, even later than I had thought. So even though wires are already up, trains will continue to travel on diesel power between Didcot and Swindon (around 24 miles) for more than half a year? Seems a bit unfortunate. Oh well, it'll probably be worth the wait.
Indeed not; Parkway is in Gloucestershire, whereas Temple Meads is in Somerset. https://wikishire.co.uk/map/#/centre=51.448,-2.581/zoom=14/base=outlineParkway isn’t even in the same county
Indeed not; Parkway is in Gloucestershire, whereas Temple Meads is in Somerset. https://wikishire.co.uk/map/#/centre=51.448,-2.581/zoom=14/base=outline
As has been explained up thread, the main reason for the non electrification is the need to remodel Bristol East Jn, which is a project deemed not deliverable in the current Control Period (CP5). The requadrification is a requirement for the new timetable, which has also been deferred, however it (4 tracking) is going ahead and should be complete by December.But we better get back to electrification! It's only about five miles from Filton Junction to Temple Meads and it's closure for requadrifucation would be a good opportunity to electrify.
As has been explained up thread, the main reason for the non electrification is the need to remodel Bristol East Jn, which is a project deemed not deliverable in the current Control Period (CP5). The requadrification is a requirement for the new timetable, which has also been deferred, however it (4 tracking) is going ahead and should be complete by December.
Dai, you know full well that local government structures have no bearing on geographical counties! The boundary between the counties of Gloucester and Somerset has always been the Avon. The county corporate of Bristol was situate in both.
Great Charter of Liberties
King Edward III granted important rights and privileges to Bristol by this royal charter in 1373 that were to have far-reaching consequences for its future self-governance and identity.
The town burgesses had petitioned him for more independence and they asked that Bristol be raised to the status of county completely separate from the counties of Gloucester and Somerset. Until this time Bristol was divided, geographically and administratively, by the River Avon. The parishes to the west and north of the river lay in Gloucestershire, while those to the south were in Somerset. The charter of 1373 gave Bristol and its suburbs jurisdiction independent from those county authorities, making it a county in its own right.
That the said town of Bristol with its suburbs ... shall be separated henceforth from the said counties of Gloucester and Somerset equally and in all things exempt, as well by land as by water, and that it shall be a county by itself and [be] called the County of Bristol forever......
Bristol was the first provincial town to be given this status. The form of local government that this charter allowed for Bristol, as well as the settling of its boundaries, remained unaltered for the next 450 years until the Municipal Reform Act of 1835. Its illuminated first letter also incorporates a shield with the ship and castle of the Bristol coat of arms and is thought to have been the first time it was used.
Oh wow, even later than I had thought. So even though wires are already up, trains will continue to travel on diesel power between Didcot and Swindon (around 24 miles) for more than half a year? Seems a bit unfortunate. Oh well, it'll probably be worth the wait.
Indeed not; Parkway is in Gloucestershire, whereas Temple Meads is in Somerset. https://wikishire.co.uk/map/#/centre=51.448,-2.581/zoom=14/base=outline
Dai, you know full well that local government structures have no bearing on geographical counties! The boundary between the counties of Gloucester and Somerset has always been the Avon. The county corporate of Bristol was situate in both.
The vast majority of Temple Meads is north of the middle of the river Avon, ergo in Gloucestershire and I claim my £5.