iantherev
Member
Or as my mother used to say - have a squeeze!It's like taking a toddler out:
Do you need to go to the toilet?
No.
Are you sure?
Yes.
Can you just try, just in case?
Or as my mother used to say - have a squeeze!It's like taking a toddler out:
Do you need to go to the toilet?
No.
Are you sure?
Yes.
Can you just try, just in case?
From what I can see, the only area that gets very little is Bridgend-Maesteg
I doubt it will actually share traffic lanes although it may cross them on the level. The main thing is as 'segregated tramway' it will not require fully fencing off from pedestrians, and may have tighter curves and possibly steeper gradients where expedient.Combining this with the new stations at "Loudoun Square" and "The Flourish", I anticipate a new station on the current alignment half way along Bute Road, and then a street-running extension beyond the current Cardiff Bay station toward the Flourish.
It won't be done to Metro standards (ie not a tram), but it will be part of the metro. It's on the map, but I would guess that it'll be done with the "South Wales DMU" that will be part of the new build.
![]()
Agreed: Crossing Hemmingway Road (south of the current station) on the level there's space to the west of Lloyd George Avenue to reach down to the Flourish, especially if you're willing to relocate the current bus/coach stops there.I doubt it will actually share traffic lanes although it may cross them on the level. The main thing is as 'segregated tramway' it will not require fully fencing off from pedestrians, and may have tighter curves and possibly steeper gradients where expedient.
If there are to be six trains an hour to Cardiff Bay/The Flourish does this mean two trains an hour to/from Treherbert, Aberdare and Merthyr? (With the other 2tph from those three rail heads going to Cardiff Central)
Agreed: Crossing Hemmingway Road (south of the current station) on the level there's space to the west of Lloyd George Avenue to reach down to the Flourish, especially if you're willing to relocate the current bus/coach stops there.
Good thinking, but I think that takes it a bit too far, as some street running is required. Quoting from Ken Skates' forthcoming speech:You could re-design the junction.
Close the east west bit of Bute Street immediately south of the Station and make Bute Street two way. Then tweek the road layout at the bottom of Lloyd George Avenue/The Florish. As Krus said you'd just need to find a new home for the coach parking.
Green is rail, yellow is road.
![]()
To ensure all bidders offered a future–proof solution from the outset, the contract requires a short section of on-street running in Cardiff Bay
Good thinking, but I think that takes it a bit too far, as some street running is required. Quoting from Ken Skates' forthcoming speech:
Mixing pedestrians, cyclists, cars and tram-trains, what could possibly go wrong.
, but a bit of good road design with separate lanes and properly designed junctions and crossings can protect the more vulnerable road user.
That assumes that every driver, cyclist and pedestrian will a) know what to do and b) do as they're told.
I assume these plans will mean a redesign of The Flourish and hope that there is no crossover between road and rail. A level crossing in the country side is one thing, creating a brand new one in a busy area with six trains coming in and six trains going out an hour would be madness.
You could have 2tph from Pontypridd going via the City line into Cardiff Central rather than through Queen St, then you've got 18tph through Queen St. This would mean longer journeys on these services but it would save the need for a Central - Radyr via City line shuttle.As I read it, 6 to the Bay (presumably 3 form each railhead), with the other 6 looping round the Coryton loop and heading back up North.
The numbers don't quite add up on that map. North of Queen Street toward Crwys Road you've got 2tph to Coryton and 6 to Caerphilly, total: 8. South of Cardiff Central toward Grangetown you've got 4tph Penarth, 3tph Barry Island and 3 tph Rhoose and Bridgend, total 9. Okay, there could be one terminator at Central. But when you add in the 6tph from the Valleys to the Flourish (or the other 6tph that go through Queen St and head back North) I can't see how they get a figure of 18tph at Queen Street unless they've dropped the Coryton services!
That assumes that every driver, cyclist and pedestrian will a) know what to do and b) do as they're told.
I assume these plans will mean a redesign of The Flourish and hope that there is no crossover between road and rail. A level crossing in the country side is one thing, creating a brand new one in a busy area with six trains coming in and six trains going out an hour would be madness.
That's how I read it. (On both counts.)Surely, to reach ‘The Florish’ (fountains at southern end of Lloyd George Avenue) - you can simply extend the Cardiff Bay line southwards through the grassy area and not encroach on any roads - apart from crossing the one by the old station?
The City Line (west section) is marked as being down for tram conversion. Can I take it that such trams or tram-trains will be allowed to enter the Central station from the west using the present lines?
You could have 2tph from Pontypridd going via the City line into Cardiff Central rather than through Queen St, then you've got 18tph through Queen St.
That matches my thoughts.I'd expect something like this with the new rail terminal placed in the green strip alongside the coach bays:
The City Line (west section) is marked as being down for tram conversion. Can I take it that such trams or tram-trains will be allowed to enter the Central station from the west using the present lines?
The City Line (west section) is marked as being down for tram conversion. Can I take it that such trams or tram-trains will be allowed to enter the Central station from the west using the present lines?
That's how I read it. (On both counts.)
Tram-trains must meet train standards for running on train infrastructure: it's mainly on the tram-style infrastructure that you'll see the savings.
I don't think we will see any widespread 'tram conversion' of the Valley lines, because as I quoted from Ken Skates statement today:
"The Metro Vehicles will use a technology often referred to as Tram-Train. They will operate under Heavy Rail regulations on conventional railway, but will be capable of use in Light Rail (or Tram) mode for extendibility."
Which suggests that these tram-train Metro vehicles will be running to the exact same regulations on lines via Pontypridd as 150s and Pacers do now, using HR signalling. Which asks the Q why are they bothering with tram-trains on these lines? There's no mention of any LR extensions up the Valleys in today's announcements. The only street running section is in the Bay. Essentially you have tram-trains on these lines 'just in case' there are any on-street extensions in the Valleys in the distant future (maybe in the next post 2033 franchise!)
The only infrastructure differences I think we'll see between the lines via Pontypridd and Caerphilly, is 25 Kv AC for Caerphilly lines and 750v DC for Pontypridd lines.
...Which asks the Q why are they bothering with tram-trains on these lines? There's no mention of any LR extensions up the Valleys in today's announcements.
The only infrastructure differences I think we'll see between the lines via Pontypridd and Caerphilly, is 25 Kv AC for Caerphilly lines and 750v DC for Pontypridd lines.
From Ken Skates' statement today:I don't know about 25kV for the Rhymney. The trimode term could mean diesel/battery/750v capability rather than (or as well as) AC. With Metro coming from Radyr on the City Line it could be the Valleys line platforms at Central are exclusively DC. which solves any compatibility between there and Queen St as well (assuming the Metro tram trains are not AC/DC). .
If what you say is correct, it sounds like costs will not be much lower from using tram trains compared to conventional HR. The only saving will be 750 v DC electrification compared to 25 kv AC. What has the light-rail-at-all-costs brigade got to say about that ?
If it's going to be light rail to the Bay, why not use this added flexibility to have another stop around Callaghan Square for easier transfer from non-Queen Street services at Central (and better access to the metro from the southern part of the city centre, without having to walk to Queen Street) ? And what about an eventual extension of the line from the Bay over that causeway thing to Penarth ?
I'd expect something like this with the new rail terminal placed in the green strip alongside the coach bays:
View attachment 47830
Which might be considerable on an old Victorian railway in the light of difficulties experienced by many main line wiring projects.If what you say is correct, it sounds like costs will not be much lower from using tram trains compared to conventional HR. The only saving will be 750 v DC electrification compared to 25 kv AC.
Good extension ideas for the future there, all possible with tram-train technology. I also like the interchange idea for Callaghan Square. Perhaps linked to the redeveloped south entrance at Central via a covered pedestrian walkway through new developments on the south side of the square.If it's going to be light rail to the Bay, why not use this added flexibility to have another stop around Callaghan Square for easier transfer from non-Queen Street services at Central (and better access to the metro from the southern part of the city centre, without having to walk to Queen Street) ? And what about an eventual extension of the line from the Bay over that causeway thing to Penarth ?