Bletchleyite
Veteran Member
What "standard capacity of street trams"? There is huge variation. The Manchester sets are shorter than a Pacer, while the new Croydon and Edinburgh ones are quite long.
Wouldn't they also need to be 25 kv AC capable to work through Cardiff Central and its surrounds? And even if there may be a case for 750 v DC on losing speed branches without through routes, would it not be sensible to wire the VoG line at 25 kv AC so it can provide an electric diversionary route when Swansea is eventually wired? Not insurmountable obstacles, if high capacity tram trains could be found to meet the network's needs otherwise, but factors that will need to be considered.
This thread includes the sensible, realistic and financially grounded all the way to the "flat earth conspiracy theorist" type content...also quite a lot of disinformation and genuine misunderstanding. I think it better to wait for the current procurement to produce a winning bidder and solution for the valleys....any ensuing disagreement and debate can at least be informed by what is on offer. As I have said a lot of people with significant, expertise, experience and resources at their disposal having been exploring all the questions raised here for quite a long time. This is a complex process with a range of objectives to satisfy (which WG did publish for Metro http://gov.wales/topics/transport/public/metro/?lang=en and later in http://gov.wales/docs/det/publications/170922-rail-services-of-the-future-brochure-en.pdf )...the best overall solution (which is affordable and deliverable) is what we need and I suspect is what we will get.
I've just had another look at the other document that Solaris linked. Obviously this is a puff/PR piece of literature, but I was struck by one thing:
The journey time improvements they suggest LR can achieve on page 21:
Heads of the Valleys -> Cardiff 10-15 minute journey time savings ( on a journey currently taking about an hour) ... Doesn't that sound somewhat ambitious, even for electric fast acceleration units - taking into account the number of station calls?
Another hollow post with straw man arguments Solaris - the boys and girls in hiding are all very clever and will come to best ever ever conclusions as this is what they believe they will do (note not the rest of us). And of course if we all sit and keep stum like good little boys and girls when the concerns emerge after award of contract of course the answer will be "there's nothing we can do as the contract is awarded".
Frightened of scrutiny? You sure seem to be. I note that you have declined my previous offer to PM me with actual evidence of these assertions I can only conclude and share this with fellow Forum members that you cant provide any evidence of this what so ever. If you really are "close" to the decision making as you appear to claim to be then then you should be able to feret away some hard evidence to back your claims. Please leak it to me I will keep you anonymous after all if it really is ...the best overall solution (which is affordable and deliverable) then there's nothing to be worried about.
...or she.To be fair to Solaris, if he is internal to this process, then I'm pretty certain that disclosure would be a breach of his NDA and employment contract, so I wouldn't expect him to be providing evidence on a public forum which could be traced back to him.
This thread includes the sensible, realistic and financially grounded all the way to the "flat earth conspiracy theorist" type content...also quite a lot of disinformation and genuine misunderstanding. I think it better to wait for the current procurement to produce a winning bidder and solution for the valleys....
I think it better to wait for the current procurement to produce a winning bidder and solution for the valleys....any ensuing disagreement and debate can at least be informed by what is on offer. As I have said a lot of people with significant, expertise, experience and resources at their disposal having been exploring all the questions raised here for quite a long time. This is a complex process with a range of objectives to satisfy (which WG did publish for Metro http://gov.wales/topics/transport/public/metro/?lang=en and later in http://gov.wales/docs/det/publications/170922-rail-services-of-the-future-brochure-en.pdf )...the best overall solution (which is affordable and deliverable) is what we need and I suspect is what we will get.
3 car 20m, end gang-wayed DMUs to keep the network together and make best use of CASR is a good option.A question for the locals in the thread - would you have been happy with (prefer?) an order of 3-car 23m DMUs such as the CAF ones on order for Northern, but no other service changes other than a bit of peak tweaking to recognise that there could be no multiple working with that length of train? That would be viable, I reckon, and is an approach that seems to have done fine to upgrade the Snow Hill lines out of Birmingham.
I hadn't seen that document.
'As part of the new rail service, services will be improved across the network including the Metro. The Core Valley Lines will be transformed with faster, more frequent “turn up and go” service.
This will require the use of different vehicles from the Pacers and Sprinters used currently. There will be vehicles more suited to delivering Metro services.'
Translation: These vehicles will be trams.
'Providing adequate toilet facilities through future design of the network'
Translation: Trams don't have toilets, so we'll have to build some new facilities on stations.
'Modern energy efficient trains that are more suitable for the types of journeys passengers make in the Metro area and better trains outside the Core Valley Lines'
Translation: Trams and cascaded DMUs.
3 car 20m, end gang-wayed DMUs to keep the network together and make best use of CASR is a good option.
But WG won't go with it as they want to get one up on Grayling.
I hadn't seen that document.
'Providing adequate toilet facilities through future design of the network'
Translation: Trams don't have toilets, so we'll have to build some new facilities on stations.
The VoG at 25kV would be nice, but of little use if the mainline to Bridgend and beyond is not also electrified. A bit of 750V on NR infrastructure to Barry would not be implausible and would avoid the new tram train/light metro vehicles needing 25kV capability while still retaining the established cross-Cardiff routes. If desired, the Barry electrification could be specced for future upgrade to 25kV, like Rotherham. In Cardiff Central, the main line side (#0-4) could be 25kV while the valleys (#6-8) could be 750V. DC on the VoG would make the station arrangements easier as there would be no system switching neccessary on any platforms. Anything arriving on 25kV from the east would have to switch to diesel (or other self contained) power to proceed further west, whether along the main line or the VoG.
To be fair to Solaris, if he is internal to this process, then I'm pretty certain that disclosure would be a breach of his NDA and employment contract, so I wouldn't expect him to be providing evidence on a public forum which could be traced back to him.
So what is he, she or it (allowing for the possibility of a BayBot) doing on a public discussion forum, trying to stop other people discussing things?
I'm a new member but have been following this, and the other W&B-related threads for a while. I am a regular commuter from Lisvane&Thornhill into Cardiff.
From a commuter point of view, I think the existing valley lines timetable is fine, especially now the CASR seems to be working and makes both Cardiff Central and Queen St work much more smoothly. The only problem is, of course, the totally inadequate and elderly pacer units. We just need 3 car end-gangway units that can double up to 6 at peak times (either diesel or electric, new or second-hand, I don't care, just get on with it). I am also strongly in favour of retaining the existing HR cross-city links.
Regarding the 319 / 769 conversions, I hope the much vaunted 'capacity increase' is not going to be accounted for by using 3+2 seating. There are some big people using the service, and if you make the seats narrower, it effectively becomes 2 + 1 seating as people can't fit in the narrower seats. I remember about 7-10 years ago (I think), ATW got some more 150/2 units from Scotland - I believe these had the 3+2 removed in favour of 2+2, and the 150s on the line are generally fine, but evidently dont meet the PRM-TSI regs.
Please don't give us trams - they'll be fine for me, but for commuting from Rhymney, Aberdare etc? Please not!!
I wouldn't get your hopes up on 2+2 seating....
Is that likely to happen? Or just conjecture?No one should get their hopes up on the 769s full stop. They are late to Northern, who are getting them first. It's highly unlikely Wales will get any 769s this year. We are more likely to see Northern's 144s come down to Wales first.
Check out the 769 thread over in the rolling stock section. I don't think they've even gone into production yet.Is that likely to happen? Or just conjecture?
3 car 20m, end gang-wayed DMUs to keep the network together and make best use of CASR is a good option.
But WG won't go with it as they want to get one up on Grayling.
I think we should invite Solaris to tell us who he/she is and what relationship if there is, is there with the Welsh Government. otherwise Solaris is as secretive as the Government itself on this issue.
We don't want Christian name surname or address. I'm quite happy for forum members to know my credentials so to speak. I own a Station Agency business, I worked for Welsh Government and was involved in the ebbwvale reopening and Welsh Highland Railway funding.Prior to that I have been Chairman of my local RUG and a Public Member of the Rail Passenger Council for Wales. My other half was in British Rail Boards Policy Unit.
No matter how sensible it seems, TfW or the new ODP are not getting control of these lines. Grayling thinks hybrid trains are the solution to electrification and is on record as saying he expects to see it's use in the Cardiff and Valleys areas. He will not authorise NR to electrify these lines.
If DfT were solely in control of the award of this new franchise and /or the Valley lines, do you think we'd even be having these discussions? Valley lines electrification would have been canned last Summer when Cardiff - Swansea was axed and we'd be getting new DMUs and that would be the end if it. Maybe DOO DMUs but still.
It's not just around the corner, it's here now. The upgrades have been paid for and implemented. The signalling is ready. The platforms are ready. The infrastructure in Queen St and Central is ready. We just need the politicians to order the trains.
Forgive me if I don't quite see the attraction of ripping up 2 electric suburban railways, blocking both in the process to any use for through services (for which one of them was still vital at the time), then putting in some sort of pseudo-heavy rail solution 40+ years later. What is the advantage of some sort of DLR clone over the Metrolink?
The Manchester region, like south Wales, should be allowed to aspire to the world-class public transport seen in most other western European countries, not fobbed off with some low capacity, low quality rubbish because British governments fetishise not spending money. There is a place for light rail, but it is not generally providing an inadequate substitute for heavy rail on heavy rail alignments.
And before you mention Karlsruhe, it's not exactly comparable size-wise to either Manchester or Cardiff. It's also conspicuous in being one of the very few cities anywhere to run light rail vehicles on heavy rail tracks (although at least its scheme doesn't bar those heavy rail tracks to heavy rail vehicles). If converting everything to light rail is such an obviously good idea, why have so few countries done it?
The reality is it will cost more to staff an LRT system than the current one because the Labour administration will not want to be seen anywhere near a decision that sacks well paid workers and reemploys them at cheaper rates. Metrolink managed it back in the early 90's as the pay differential then was not great and BR could absorb those wanting to stay through natural wastage and they were far fewer in number than those potentiality effected in South Wales. The TfW LRT system will be today's wages plus.
I've just had another look at the other document that Solaris linked. Obviously this is a puff/PR piece of literature, but I was struck by one thing:
The journey time improvements they suggest LR can achieve on page 21:
Heads of the Valleys -> Cardiff 10-15 minute journey time savings ( on a journey currently taking about an hour) ... Doesn't that sound somewhat ambitious, even for electric fast acceleration units - taking into account the number of station calls?
But then we're back to the Manchester approach. Why is nothing allowed to be future-proofed? Why would you build something to 750 v DC and then have the expense and hassle of conversion?
And why, when you can have 8 multiple use platforms at Central, would you rule 3 them out of use for electrified trains? Has this even been allowed for in the specification for the electrification at Central?
25kV AC dual-voltage capability is absolutely trivial to add to new-build metro vehicles. Let NR wire up Cardiff how they want and then add in 750V DC for the bits they don't have to cover but the Metro would need.