Maybe Abellio, having lost Carillion as a credible partner for the W&B franchise/metro contract, can persuade Costain, who were Arriva's partner before they pulled out, to take over Carillion's role.
We also don't know the reason for Arriva's withdrawal - it might have been instigated by Costain.

But there must be some loss of confidence in the contracting industry if a giant like Carillion can come to grief so quickly.
It's only a couple of years since Balfour Beatty nearly collapsed, and they were almost taken over by...Carillion.
Given the final bids are already in Costain jumping into bed with Abeilio and the process continuing seems highly unlikely. It would take them weeks if not months to re do a bid plus the cost £. No it's two little Indians left to compete to build the pre determined light rail system.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
That's rubbish from Ken Skates - it was not an entirely funded and specified Westminster project. Welsh Government specified the 16 tph expectation between Central and Queen St in 2011/12. Welsh Govt funded a large part of the project. And trains stop under the canopy at the rear of the platform anyway.

We're still to learn the effect the collapse of Carillion will have on the award process. The only way I can see these plans now being halted is if the DfT refuse to transfer the ownership and control of the Valley lines from NR to Welsh Govt. Otherwise heavy rail on the Valleys and the network as it operates currently is finished.

It's always "the other boys fault" down at the Welsh Government.
 

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
Given the final bids are already in Costain jumping into bed with Abeilio and the process continuing seems highly unlikely. It would take them weeks if not months to re do a bid plus the cost £. No it's two little Indians left to compete to build the pre determined light rail system.
We just have to wait for it to be confirmed, by most likely Abeillo themselves, as there's no way that WG will release a negative news story about the Metro. I can predict the press release already: "We now have two world class operators left in the running, who are set to deliver on our ambitious plans for transformational change to the rail network in South Wales". :rolleyes:
 

Bwlch y Groes

Member
Joined
22 Jul 2017
Messages
210
How come the WAG have £100m to spend on that ghastly work at Central and yet not on providing proper heavy rail electrification or BRT routes? Shows the priorities, doesn't it? Light rail conversion quoted as costing £272m because it's "more favourable" than heavy rail electrification, and yet they're spending over a third of that on ONE station. What a joke
 
Last edited:

Bwlch y Groes

Member
Joined
22 Jul 2017
Messages
210
Also one thing that hasn't been picked up before that's in that document - they want to convert the Penarth branch to light rail too! How the hell does that work with heavy rail services continuing to Barry and Bridgend?
 

CardiffKid

Member
Joined
13 Feb 2011
Messages
1,081
Location
Cardiff
Also one thing that hasn't been picked up before that's in that document - they want to convert the Penarth branch to light rail too! How the hell does that work with heavy rail services continuing to Barry and Bridgend?

Scheme 63 - LR conversion of existing HR alignment on Penarth line but with on street through Grangetown - Cost £104.3m - Strong scoring across all metrics, offers opportunities for extension and scores more strongly than diesel enhancement scheme (Scheme 224) or HR electric upgrade (Scheme 62)
 

Bwlch y Groes

Member
Joined
22 Jul 2017
Messages
210
Scheme 63 - LR conversion of existing HR alignment on Penarth line but with on street through Grangetown - Cost £104.3m - Strong scoring across all metrics, offers opportunities for extension and scores more strongly than diesel enhancement scheme (Scheme 224) or HR electric upgrade (Scheme 62)

Yeah but if you look at the map, it shows the route still sharing the heavy rail alignment to Barry for some of it. It's not all on the street to Cogan. That to me implies a tram train, but it's still all a bit bizarre. Makes me wonder how much they have actually scoped this out
 

CardiffKid

Member
Joined
13 Feb 2011
Messages
1,081
Location
Cardiff
Yeah but if you look at the map, it shows the route still sharing the heavy rail alignment to Barry for some of it. It's not all on the street to Cogan. That to me implies a tram train, but it's still all a bit bizarre. Makes me wonder how much they have actually scoped this out

I don't know I'm just going on what's in the PDF. It could be possible to have two HR tracks on the Vale line and a single LR track along side running from Penarth to say IKEA then joining the roadway and heading to the rear of Cardiff Central station, although I agree that this scheme would unnecessarily complicate things.
 

CardiffKid

Member
Joined
13 Feb 2011
Messages
1,081
Location
Cardiff
Can anyone make any sense of this?

http://www.bbc.co.uk/news/uk-wales-south-east-wales-42689172
http://www.cardiffcapitalregioncity...s-deal-funding-metro-central-development.html

The image shows the proposed new rear entrance to Cardiff Central complete with a tram stop.

And another image shows a dedicated entrance from platforms 1 & 2 (although I'm not sure if this is at the front or back?) either way it looks like the new rear entrance completed just over a year ago is to go.

Further to this WalesOnline have more details:

http://www.walesonline.co.uk/business/business-news/new-vision-sees-cardiff-central-14157440

Bringing the northern entrance of the station forward would allow easier access for passengers to the current platform zero, as well as far more space in the concourse.

The aim is to also extend its length for it to become the dedicated platform for south Wales to Paddington inter-city train services.

Rather than having to move the structure brick by brick, the current three-part steel structure supporting the facade would be moved.

The changes to Cardiff Central railway station include
  • A new Cardiff Central coach station located south of the railway lines providing 24 hour access and dedicated facilities for inter-city and regional coach services.
  • Extension of Platform 0 that could see the listed clock tower building moving forward a few metres. This would mean the platform could accommodate trains on the London to South Wales line.
  • A new park & ride multi-storey car park south of the railway lines to replace the existing rail related parking surrounding Cardiff Central train station and to improve the provision of pick-up and drop-off facilities, and disabled parking, under a covered roof.
  • A new taxi rank alongside the multi-storey car park to the south of the station providing adequate waiting capacity for taxis and covered waiting areas for passengers. New taxi drop off facilities north of the railways lines will also be provided.
  • A new cycle hub accommodating up to 1000 cycle parking bay and related facilities to the south of the station in close proximity to the main station concourse. This is in addition to the proposed new cycle hub that will be provided as part of the Central Bus station project.
  • New cycle routes north and south of the station to improve access to the station.
  • Provision for a new Metro (tram) terminal south of the railway station, adjacent to the main southern concourse, to enable easy, covered transition between bus and tram and train and tram.
  • Improvements to public realm north and south of the station and between Metro Central and Queen St station to improve access to the Interchange and to encourage walking.

The leader of RCT council said last night that there would be 4tp on the 'core valley' lines by 2022. I laughed so much I almost cried.
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
One wonders how much of this is TfW being process led and needing an EIA as the tick box checklist tells them its needed, hence with the final plans unknown its all a rather woolly crayon exercise.......No doubt Mott McDonald have obliged so that a big fat Invoice can be submitted
 

Bwlch y Groes

Member
Joined
22 Jul 2017
Messages
210
This whole plan to move the old building forward is absolutely bizarre. I'd be surprised if that actually happened - I think they'd sooner find some way of juts knocking it down in the end

It's a complete mess. Just like the Metro this seems like a totally political project
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
This whole plan to move the old building forward is absolutely bizarre. I'd be surprised if that actually happened - I think they'd sooner find some way of juts knocking it down in the end

It's a complete mess. Just like the Metro this seems like a totally political project

Agree its about "Top show" one wonders whether Cardiff Central will really have all this growth projected if the half baked Tram scheme for "Core valleys lines" goes ahead. Passengers consistently have indicated there biggest gripe is getting a seat at peak times on the current service yet Welsh Government seems to want to provide fewer seats with a better standing environment with no toilets........Pontypridd/Caerphilly are further from downtown Cardiff than Altringham/Bury are from the center of Manchester.
 

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
Also one thing that hasn't been picked up before that's in that document - they want to convert the Penarth branch to light rail too! How the hell does that work with heavy rail services continuing to Barry and Bridgend?

Yeah but if you look at the map, it shows the route still sharing the heavy rail alignment to Barry for some of it. It's not all on the street to Cogan. That to me implies a tram train, but it's still all a bit bizarre. Makes me wonder how much they have actually scoped this out

I don't know I'm just going on what's in the PDF. It could be possible to have two HR tracks on the Vale line and a single LR track along side running from Penarth to say IKEA then joining the roadway and heading to the rear of Cardiff Central station, although I agree that this scheme would unnecessarily complicate things.

It's all very bizarre and quite frankly, totally bonkers. I get the feeling the Mott Macdonald report writers have just looked on Goggle maps and then drawn coloured lines on their report. They obviously have no clue about current road layouts, traffic levels, and the geography of the rail line between Cardiff and Cogan - Penarth, like that fact that the line from Central - Grangetown is up on a high embankment well above the road level.

A tram line through Grangetown would get stuck in heavy traffic through that area. Then if they want to re-join the tram to the current Penarth branch after Cogan junction, there would need to be not just a complete re-design, but a complete re-build of the road junctions there, along with demolishing the old Penarth Docks station building, which is now commercial premises. The 'extension' beyond Penarth station to Forrest road, the furthest the line could be taken before it runs into a housing estate, just runs between the back of houses along what is now a popular railway walk and goes nowhere. Totally pointless.

Similarly bonkers is the proposal in the report to convert the City line via Fairwater to light rail, but only as far as Ninian Park, and then have trams somehow come down from Ninian Park station (which again is up on a high embankment) to run on street level towards the city centre, when it currently takes all of 5 minutes by train.

Tram-train might be a saving grace option if light rail on the Valleys is determined, but then electrification of the Vale of Glamorgan and City lines would be needed as well. I'm pretty sure there's no money for that.
 
Last edited:

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
First post!

Have been following this discussion with interest, being an ex-Valleys boy (now London).

I'm surprised that the prevailing view is very much against conversion to Light Rail.

Some of the concerns about seating may be justified, though I think the seating arrangements can be specified in any new units purchased. And there is a difference from standing all the way from say the tops of the Valleys, to standing from the outer Cardiff suburbs - whose commuters are standing now anyway.

But I think some of the other complaints about a lack of toilets are overdone. There's no toilets on tube trains, yet the journey from Oxford Circus to Epping is 52 minutes, and one which I used to do daily. There are other similar longer distance journeys on the Underground with no toilets, Upminster/Amersham etc.

The major concern that I have and share with other posters is over a potential break to through services between the lines north of Cardiff Queen Street and Penarth/Barry. More importantly, through links to interchange with main line services at Cardiff Central must be maintained - but that doesn't mean that all 'trams' from North of QS need to get sent through to Cardiff Central, as long as there's an efficient and convenient change (e.g. cross platform).

There are particular challenges that arise from a conversion to light rail: the freight only branch to Cwmbargoed, the maintenance of the VoG line as a diversion to the SWML etc.

But overall, light rail has the best prospects for future expansions of the network and for increasing frequency. Electrification with heavy rail won't deliver much more than cascaded EMUs, with slightly improved journey times, some more seats and perhaps a slight improvement in frequencies. What Manchester has done with their Metrolink offers a glimpse of what could be possible.


The devil will obviously be in the detail and I have scepticism about whether the Welsh Assembly / its contractors will have the experience necessary to deliver this, and their secrecy is not reassuring and looks to be to avoid public and political scrutiny.

But overall, I've thought for many years, that for the South Wales region to grow economically, the towns and villages around Cardiff and its hinterland need to be treated as dormitories / suburbs, funneled efficiently in to Cardiff city centre - as is the case in London.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,599
First post!

Have been following this discussion with interest, being an ex-Valleys boy (now London).

I'm surprised that the prevailing view is very much against conversion to Light Rail.

So I'm going to reply to your points, one by one. This is from an ex valleys boy, living in Bath (somewhere else that also has shocking public transport!) but who spends a lot of time in and around London due to relationships, work and friends living there! Hope you don't take my replies the wrong way, especially as its your first post!

Being honest though, I am sure most of the issues could be somehow worked around. I just think they won't be, and we'd be left with a cobbled together light rail system that is not integrated properly into the rail network and will be in a worse position than even now!

Some of the concerns about seating may be justified, though I think the seating arrangements can be specified in any new units purchased. And there is a difference from standing all the way from say the tops of the Valleys, to standing from the outer Cardiff suburbs - whose commuters are standing now anyway.

Seating isn't just the only concern, it is also unit length. Genuine question, how do the seat numbers and unit lengths of say the trams used in Manchester compare to a doubled up 150 (which IMO should be what we are comparing things to).

But I think some of the other complaints about a lack of toilets are overdone. There's no toilets on tube trains, yet the journey from Oxford Circus to Epping is 52 minutes, and one which I used to do daily. There are other similar longer distance journeys on the Underground with no toilets, Upminster/Amersham etc.

I think there are two main differences there.
1 - There are decent facilities dotted around the network. If you really need the loo, you can probably find a station somewhere along where you are going to alight at. Especially if you are in central London. Outside of Cardiff, the valley lines basically have no station facilities.
2 - London is used to it, the valleys aren't!

The major concern that I have and share with other posters is over a potential break to through services between the lines north of Cardiff Queen Street and Penarth/Barry. More importantly, through links to interchange with main line services at Cardiff Central must be maintained - but that doesn't mean that all 'trams' from North of QS need to get sent through to Cardiff Central, as long as there's an efficient and convenient change (e.g. cross platform).

I disagree totally. If people have to start changing trains at Queen Street just to then change trains again at Central - that is total lunacy. Even for those alighting at Central (remember, there is limited parking for the new offices around Central so the assumption must be that these workers will use public transport - and a large number of them the train station next door to their offices), changing trains at Queen Street is going to be a pain in the backside and a massive downgrade to what their current journey would be. At least the WG seem to have realised that now with the newest plans posted about Central station (having a metro stop as part of it).

There are particular challenges that arise from a conversion to light rail: the freight only branch to Cwmbargoed, the maintenance of the VoG line as a diversion to the SWML etc.

Add to that the usage of the city line as a diversion to the main valley lines, the "through" services to Barry and Bridgend etc, the continuation of through ticketing (at the moment, my return ticket from Bath Spa to Treherbert only costs a few quid more than if I bought a return from Bath Spa to Cardiff Central - I will not be happy if that return gets even more expensive because I have to buy a separate tram ticket), the actual engineering and structural challenges (some highlighted by gareth950 above) etc.

But overall, light rail has the best prospects for future expansions of the network and for increasing frequency. Electrification with heavy rail won't deliver much more than cascaded EMUs, with slightly improved journey times, some more seats and perhaps a slight improvement in frequencies. What Manchester has done with their Metrolink offers a glimpse of what could be possible.

So what is possible with light rail on the valley lines that wouldn't be with heavy rail, or at least a mix of heavy rail and light rail?
 
Last edited:

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,140
Right now, we have 6 trains an hour from Pontypridd southward to Cardiff & the coast; 4 trains an hour southward from Abercynon to the coast and 4 trains an hour from Bargoed southwards via Caerphilly to the coast. All of these are precisely timed and usually run to the minute. That in my mind is a pretty good service - a near as dam it - turn up and go - as advocates of the Metro claim will be the case with trams. However, once you start having services running onto the streets of Cardiff, the whole system is put at risk. Just look at the situation now on bus routes in Cardiff, you can never guarantee when a bus will turn up.

Perhaps someone from the Welsh Government/Transport for Wales - who no doubt have their people monitoring this forum - can come on here and explain exactly how trams will get off the valleys network to access the south side of the Central Station and how they will get from the City Line near Ninian Park into central Cardiff as well as from the Penarth line? Have you negotiated access to the National Rail network tracks into Cardiff Central? Stop being so secretive and clearly state your intentions and what routes/roads you will use. Have you completely ruled out keeping the network as it is and simply electrifying it and ordering new trains?
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
First post!

Have been following this discussion with interest, being an ex-Valleys boy (now London).

I'm surprised that the prevailing view is very much against conversion to Light Rail.

Some of the concerns about seating may be justified, though I think the seating arrangements can be specified in any new units purchased. And there is a difference from standing all the way from say the tops of the Valleys, to standing from the outer Cardiff suburbs - whose commuters are standing now anyway.

But I think some of the other complaints about a lack of toilets are overdone. There's no toilets on tube trains, yet the journey from Oxford Circus to Epping is 52 minutes, and one which I used to do daily. There are other similar longer distance journeys on the Underground with no toilets, Upminster/Amersham etc.

The major concern that I have and share with other posters is over a potential break to through services between the lines north of Cardiff Queen Street and Penarth/Barry. More importantly, through links to interchange with main line services at Cardiff Central must be maintained - but that doesn't mean that all 'trams' from North of QS need to get sent through to Cardiff Central, as long as there's an efficient and convenient change (e.g. cross platform).

There are particular challenges that arise from a conversion to light rail: the freight only branch to Cwmbargoed, the maintenance of the VoG line as a diversion to the SWML etc.

But overall, light rail has the best prospects for future expansions of the network and for increasing frequency. Electrification with heavy rail won't deliver much more than cascaded EMUs, with slightly improved journey times, some more seats and perhaps a slight improvement in frequencies. What Manchester has done with their Metrolink offers a glimpse of what could be possible.


The devil will obviously be in the detail and I have scepticism about whether the Welsh Assembly / its contractors will have the experience necessary to deliver this, and their secrecy is not reassuring and looks to be to avoid public and political scrutiny.

But overall, I've thought for many years, that for the South Wales region to grow economically, the towns and villages around Cardiff and its hinterland need to be treated as dormitories / suburbs, funneled efficiently in to Cardiff city centre - as is the case in London.

The main concern of current user is "getting a seat" at peak times, the Metro supposedly is to accommodate a massive increase in usage of people wanting to get into down town Cardiff. The current Pacer/150 combos deliver c1000 seats into central Cardiff from Pontypridd an hour . That's equivalent to the seating capacity on 20 2 car Trams just to stay stil......
 

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
Thanks for the gentle welcome!

On seating: Making direct comparisons on the availability of seats between new units and say 150sx2 without also having an idea as to relative frequencies of the services isn't really possible.

On toilets: The same argument could be advanced for the new tram Valley Lines as you've argued for London Underground: Go to the toilet at CDF/CQS (many in the central area), then go to the toilet in Caerphilly/Pontypridd/Merthyr (building if necessary) (representing larger non-central tube hubs). Many of the toilets in the outer fringes of the Underground aren't even open late at night - as I know from experience. My local Underground station now is Canada Water. It doesn't even have a public toilet, though handles millions of passengers a year.

Saying they aren't 'used to it', London is: I'd rather get used to crossing my legs and having a frequent service, than the option of going to the toilet on an hourly Pacer to the fringes! I've never used a train toilet on a Valley Lines train - the journeys just aren't that long - and I'd hope would be quicker as light rail.

On interchange: I don't see it as a deal breaker if say my tram from Pontypridd rolls into and terminates at CQS and there's a tram just arriving on the adjacent platform from Rhymney going through to CDF. Not if it's frequent. Again, people don't get on tube lines in London and expect to reach their destination without changing. Agree that it's less optimal than them all running through, end to end, via CDF, but it could offer advantages to frequencies elsewhere.

On structural challenges: Sure. But any expansion of the network will involve structural challenges.

On through ticketing: I agree with you. Through tickets to the rest of the National Rail network must be maintained. Though if it's only a few quid extra for your journey, extending from Cardiff Central to Treherbert (return), then that suggests the fares are too cheap.


With light rail: you'll be able to run more trains in shorter signaling blocks, the opportunity for expansions beyond the current network via on-street running where necessary, in particular supporting extension of Cardiff North East/Cardiff North West development areas. You won't get that with heavy rail, even after the CASR upgrade which delivered what, four additional paths per hour between CDF and CQS?

The question is - what do you guys who favour heavy rail think can be achieved over the next 10-20 years via electrification and cascaded EMUs, even in the unlikely scenario of VoG line and Maesteg / Ebbw Valey etc. all getting wired? I think you'd get a few extra stations between Cardiff and Newport on the relief lines, maybe one extra train to the fringes of the Core Valley lines, a Caerphilly terminator, maybe a Pontypridd terminator, a better Sunday service (could be delivered now), perhaps an extra train via the VoG line to Rhoose/Llantwit Major, and nothing more.
 

50031

Member
Joined
28 Aug 2013
Messages
176
My home town from my childhood is Pontypridd. It is a large town. Several times, there has been talk of providing through services to Bristol or even Portsmouth. Isolating it as tram junction will presumably put paid to that.

And what about journey times? Wouldn't heavy rail electrification provide opportunity for some limited stop services?
 

gareth950

Member
Joined
3 Nov 2013
Messages
1,009
My home town from my childhood is Pontypridd. It is a large town. Several times, there has been talk of providing through services to Bristol or even Portsmouth. Isolating it as tram junction will presumably put paid to that.

And what about journey times? Wouldn't heavy rail electrification provide opportunity for some limited stop services?

We'll be lucky to have direct services into Cardiff Central station, let alone anywhere else.
 
Last edited:

50031

Member
Joined
28 Aug 2013
Messages
176
We'll be lucky to have direct services into Cardiff Central station, let alone anywhere else.

Exactly my point! My local station is Cam & Dursley. I could travel to Pontypridd with just a change at Filton Abbey Wood if heavy rail and through trains happened in a common sense world. We can but dream !
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
So what is possible with light rail on the valley lines that wouldn't be with heavy rail, or at least a mix of heavy rail and light rail?

The key difference is that light rail (or metro-specific technology in general) is much more forgiving when you're designing new infrastructure. For instance, if you want to grade-separate a junction, the ramps can be much steeper and the curves that bit tighter. If you're trying to upgrade existing infrastructure this really helps, as even the best-funded government is still bounded by the laws of physics.
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,599
On seating: Making direct comparisons on the availability of seats between new units and say 150sx2 without also having an idea as to relative frequencies of the services isn't really possible.

Only partly true. We have seen with XC what happens if you increase frequency but reduce capacity per service. Really what the valley lines need is an increase in frequency and an increase in capacity. Heavy rail with electrification can easily provide both. Light rail can provide one, maybe half of the other at a push.

On toilets: The same argument could be advanced for the new tram Valley Lines as you've argued for London Underground: Go to the toilet at CDF/CQS (many in the central area), then go to the toilet in Caerphilly/Pontypridd/Merthyr (building if necessary) (representing larger non-central tube hubs). Many of the toilets in the outer fringes of the Underground aren't even open late at night - as I know from experience. My local Underground station now is Canada Water. It doesn't even have a public toilet, though handles millions of passengers a year.

Saying they aren't 'used to it', London is: I'd rather get used to crossing my legs and having a frequent service, than the option of going to the toilet on an hourly Pacer to the fringes! I've never used a train toilet on a Valley Lines train - the journeys just aren't that long - and I'd hope would be quicker as light rail.

I can probably just about let this pass. I don't agree (especially with the "journeys just aren't that long" comment), but it is a fairly small issue compared to the other things. How the travelling public will see this though - I can't imagine they will be happy getting a downgrade! The comment about London was more that, as far as I am aware, the underground hasn't had toilets on board services in recent history, so it isn't there to be missed!

On interchange: I don't see it as a deal breaker if say my tram from Pontypridd rolls into and terminates at CQS and there's a tram just arriving on the adjacent platform from Rhymney going through to CDF. Not if it's frequent. Again, people don't get on tube lines in London and expect to reach their destination without changing. Agree that it's less optimal than them all running through, end to end, via CDF, but it could offer advantages to frequencies elsewhere.

So your roughly 1 hour 5 minute direct commute now changes so you spend roughly the same amount of time on a train, but you have to change at Queen Street and fight to get on another overcrowded tram and so you have to add on say ten minutes aswell as the extra inconvenience? Not really going to go down well is it! Again, not convinced by comparisons to London because, again, it is something that currently is possible and so losing that would be a downgrade, not an improvement. If LU changed say the Bakerloo Line services so you had to change at Oxford Circus for services to anywhere north of that, I can imagine many people being annoyed.

On structural challenges: Sure. But any expansion of the network will involve structural challenges.

True, but at least with what the WG seem to want to do, the challenges are much much greater with light rail. Heavy rail electrification is a fairly known bit of work, and so the electrification of the valleys should not be too difficult once the funding problems are sorted. Light rail on the other hand, especially the ideas of street running and joining up here there and everywhere requires a lot of thought, a lot of heavy engineering and in many places the complete redesign and rebuilding of road layout and junctions, of residential areas and of commercial areas.

On through ticketing: I agree with you. Through tickets to the rest of the National Rail network must be maintained. Though if it's only a few quid extra for your journey, extending from Cardiff Central to Treherbert (return), then that suggests the fares are too cheap.

But who is going to ensure it is maintained?
And it really doesn't - it is commonplace that a through ticket is cheaper than buying separate tickets for the journey (of course, there are also many cases where because of badly priced flows, split ticketing is cheaper, but those are specific cases rather than how the system usually works).

With light rail: you'll be able to run more trains in shorter signaling blocks, the opportunity for expansions beyond the current network via on-street running where necessary, in particular supporting extension of Cardiff North East/Cardiff North West development areas. You won't get that with heavy rail, even after the CASR upgrade which delivered what, four additional paths per hour between CDF and CQS?

The question is - what do you guys who favour heavy rail think can be achieved over the next 10-20 years via electrification and cascaded EMUs, even in the unlikely scenario of VoG line and Maesteg / Ebbw Valey etc. all getting wired? I think you'd get a few extra stations between Cardiff and Newport on the relief lines, maybe one extra train to the fringes of the Core Valley lines, a Caerphilly terminator, maybe a Pontypridd terminator, a better Sunday service (could be delivered now), perhaps an extra train via the VoG line to Rhoose/Llantwit Major, and nothing more.

If you want street running and trams to areas currently not served by rail, why can't there be a seperate tram system that has a stop as part of Central station? Why does that idea (which I agree is a good one) have to inconvenience the entire upper valleys population who rely on a heavy rail connection to Cardiff Central and connections from there to the rest of the UK?

In terms of HR electrification with cascaded EMU's and a bit more investment, you could have 3 trains and hour for each valley (so 9 an hour from Pontypridd to Cardiff Central), each of them at least 3 carriages long.

Again I am not against light rail for the immediate areas around Cardiff. What I am saying is an issue is the expansion of that to the wider valleys lines, areas that are not part of Cardiff and are actually quite a distance away, is not the correct solution. By all means look at a tram-train solution if that helps save money in terms of combining the schemes, but at the very very least you need to maintain the existing journey times, the existing journey comfort (aka outside of peak hours the ability for most passengers to have a seat), the through ticketing (without increasing prices more so than what tickets are already increasing in cost by) and the existing journey opportunities. Basically, you cannot downgrade any parts of the existing service - to do so would be insane and a massive mistake when we should be improving the service!
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,599
The key difference is that light rail (or metro-specific technology in general) is much more forgiving when you're designing new infrastructure. For instance, if you want to grade-separate a junction, the ramps can be much steeper and the curves that bit tighter. If you're trying to upgrade existing infrastructure this really helps, as even the best-funded government is still bounded by the laws of physics.

But it isn't new infrastructure. We are dealing with infrastructure that is already there. That has been specifically build for heavy rail. With things like high embankments which are not at all compatible with the ideas that the WG has said they want. To put it bluntly, and to steal your line, the suggestions that have been made read as if they have been made by people who have literally no idea about "the laws of physics"!

Now, if we were talking about tram trains that run essentially as heavy rail on current infrastructure and transition to light rail on street running at sensible areas, without adversely affecting the existing service, then you absolutely have a good suggestion. But what is being suggested by the WG is not that at all.
 

Bwlch y Groes

Member
Joined
22 Jul 2017
Messages
210
I suppose the point Del and NotaTrainspott are making is that light rail does allow more of an opportunity to extend the network to places like Beddau, Trelewis, Machen etc, and add in extra stations like Upper Boat, Cwmbach North, the new Cathays Rhymney Line station etc, because it reduces the cost and makes it easier to design such projects. And it's a fair point I've considered myself

However, I have three counter-points to this:

- The reason it's easier to develop these extensions is partly because of the lower safety standards of light rail. Is this something we should be willing to accept? We saw what happened in Croydon. Similarly the infrastructure isn't always maintained to the same standards. Metrolink has had these issues with things failing and major disruption resulting

- A lot of these proposals for new stations or line extensions were on the table anyway. In my opinion, they had mostly been dismissed for no good reason. Aside from the more frequent service and faster acceleration (which you could get from a new metro heavy rail train anyway, or even a 323), what's the difference? See point 1

- Ultimately the main objection is the way this whole Metro project is being carried out. It's totally opaque and deceitful by claiming it was up to the bidders to decide when they've clearly already done feasibility studies and decided what they were going to do months ago - the light rail talk has been around about a year now (Today's Railways have been reporting it that long). Combined with CAF suddenly moving into South Wales of all places, and Arriva pulling out of the bidding process in odd circumstances, it gives the distinct impression that all is not what it seems

I think there are very good reasons for considering this a project for political gain on the part of Welsh Labour rather than for the gain of the people who live in the Valleys, who are going to face years of disruption and then get a downgraded service, all so that Cardiff can have new trams. Coming off the back of huge investment in the Cardiff area from Network Rail over the last couple of years, it's clear those making the decisions here have absolutely no knowledge of transport policy and are making it up as they go along to suit themselves. I mean they've just overseen the construction of the new south entrance to Cardiff Central and yet are now proposing knocking it down again and rebuilding it totally differently - that's symbolic of how nonsensical this whole process has been

The total lack of accountability here for Welsh Labour is astonishing - the media are totally complicit and people are being and will be led up the garden path. It's sickening to me. But I guess this is what happens when you get a devolved government where one party is totally dominant and a bad election for them is being just short of a majority

My only hope now is that Grayling is able to put a stop to it by preventing the transfer of the Valley Lines to WAG control so that they can privatise it. And I really don't want to have to put my trust in him
 

Del1977

Member
Joined
16 Jan 2018
Messages
224
Location
Canada Water
I suppose the point Del and NotaTrainspott are making is that light rail does allow more of an opportunity to extend the network to places like Beddau, Trelewis, Machen etc, and add in extra stations like Upper Boat, Cwmbach North, the new Cathays Rhymney Line station etc, because it reduces the cost and makes it easier to design such projects. And it's a fair point I've considered myself

However, I have three counter-points to this:

- The reason it's easier to develop these extensions is partly because of the lower safety standards of light rail. Is this something we should be willing to accept? We saw what happened in Croydon. Similarly the infrastructure isn't always maintained to the same standards. Metrolink has had these issues with things failing and major disruption resulting

- A lot of these proposals for new stations or line extensions were on the table anyway. In my opinion, they had mostly been dismissed for no good reason. Aside from the more frequent service and faster acceleration (which you could get from a new metro heavy rail train anyway, or even a 323), what's the difference? See point 1

- Ultimately the main objection is the way this whole Metro project is being carried out. It's totally opaque and deceitful by claiming it was up to the bidders to decide when they've clearly already done feasibility studies and decided what they were going to do months ago - the light rail talk has been around about a year now (Today's Railways have been reporting it that long). Combined with CAF suddenly moving into South Wales of all places, and Arriva pulling out of the bidding process in odd circumstances, it gives the distinct impression that all is not what it seems

I think there are very good reasons for considering this a project for political gain on the part of Welsh Labour rather than for the gain of the people who live in the Valleys, who are going to face years of disruption and then get a downgraded service, all so that Cardiff can have new trams. Coming off the back of huge investment in the Cardiff area from Network Rail over the last couple of years, it's clear those making the decisions here have absolutely no knowledge of transport policy and are making it up as they go along to suit themselves. I mean they've just overseen the construction of the new south entrance to Cardiff Central and yet are now proposing knocking it down again and rebuilding it totally differently - that's symbolic of how nonsensical this whole process has been

The total lack of accountability here for Welsh Labour is astonishing - the media are totally complicit and people are being and will be led up the garden path. It's sickening to me. But I guess this is what happens when you get a devolved government where one party is totally dominant and a bad election for them is being just short of a majority

My only hope now is that Grayling is able to put a stop to it by preventing the transfer of the Valley Lines to WAG control so that they can privatise it. And I really don't want to have to put my trust in him


Yup. That's exactly my point. I see extensions to the current network as very much being possible if light rail is the plan. I was probably imagining a Karlsruhe style system more than a Tramlink system, but I don't think I'd agree that light rail would mean lesser safety standards overall. Modal shifts in commuting would reduce car accidents, for example. And the DLR, Tyne & Wear Metro etc have excellent safety records.

I'm unconvinced that even fast accelerating EMUs operationally match dwell times and point to point efficiencies of more specialised urban units, given the short distances, acceleration and braking differences and realistically - most of the Valley Lines stations are at best on average 2 miles apart, the track speed is hardly ever more than 60mph, and even where there are longer stretches currently, additional fill-in stations are planned.

Some of the schemes have indeed been on the drawing board a while but surely are constrained by the 16 paths through Queen St. I would agree that without greatly enhanced frequencies and extensions, that heavy rail electrification would be the best solution if we are simply going to keep the current network.

I understand the idea for separate light rail and heavy rail systems, but given costs, and the disruption caused by digging up roads, you can see why the use of existing infrastructure can offer savings and efficiencies, though any conversion would be highly disruptive to today's rail users.

I guess for me it comes down to this: would I rather turn up to Caerphilly station in the morning peak and have a tram train every 4-5 minutes to get to central Cardiff, or a train every 15 minutes. I'd pick the former, even if I had to stand every day. But perhaps it would be a more difficult decision if I repeated the hypothetical question and was starting my journey at say Bargoed, further up the line. There the benefit of frequency versus potential comfort is less clear. But perhaps that's why the choice of unit / seating levels is critical.

Agree with all the concerns about the WA's handling, secrecy, general incompetence!
 

Solaris

Member
Joined
17 Jun 2010
Messages
145
WG/TfW have done an excellent job in managing a very complex procurement - and between them and the bidders have all the necessary expertise and experience to define & deliver better and more affordable services to passengers. Lets wait and see....
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,667
WG/TfW have done an excellent job in managing a very complex procurement - and between them and the bidders have all the necessary expertise and experience to define & deliver better and more affordable services to passengers. Lets wait and see....

Im confused if this is sarcasm or not?
 

Gareth Marston

Established Member
Joined
26 Jun 2010
Messages
6,231
Location
Newtown Montgomeryshire
More powers and more control are the holy grail for Welsh Labour - the Core Valley Lines are a case in question there so desperate to get more control and power then that agenda overrides everything else. Its made them blind to doing the right thing for the Valleys and the economy of South Wales. Everything is not magically better because its controlled from Cardiff. The correct decisions still have to be made whether its in Marhsam St or the Bay.

The effort and time is invested in getting the control and the eye is taken off the ball of improving public transport. The Light Rail for core valley lines is a bit like rail privatization - flog it off, smash it up and make it hard for someone else to put back in one piece. Convert to Light Rail sever from national network make it hard to put back as part of national network that someone else might have control of.
 