How long per 442 will the replacement of the traction package probably take?
A long time. But revinyling a unit is much faster, and applying a sticker over the TOC name is even quicker.
Last edited:
How long per 442 will the replacement of the traction package probably take?
Some payment modes were switched off for a period in the final few days of the franchise (especially cash) to allow accounting to be completed and finalised. Nothing to do with revenue allocation.
A long time. But revinyling a unit is much faster, and applying a sticker over the TOC name is even quicker.
If that's the case then don't know about anyone else but for me it makes it a waste of time as i may as well change at Southampton Central to the GWR service which does goto Portsmouth Harbour, where all the main tourist attractions are ferries (don't know which is best for the channel ferries as have never caught a channel ferry from Portsmouth) and bus station
SWR have some long layover times which take up the platforms
Could Fratton depot handle them being parked up there after running ECS to the depot? What would be involved in bringing platform 2 at Portsmouth Harbour back into use?
You have a bottleneck at PMS, which is the low speed and curvature of the line, also there's only one down line, a chance to make both lines bi-di was missed quite spectacularly by NR and something that would have eased the congestion, especially when the ACs throw a temper tantrum and lock the place solid.
Also you would have to have a pair of FR drivers on shunt duties all day long as they're the only ones possibly NT (IIRC) who sign the depot, none of the visiting depots sign it.
As for bringing P2 back into use down the harbour, that's a bit of a sore point, because when they were redeveloping Gunwharf Quays, the developer offered to build a brand new station with more platforms and the offer was declined. Gawd knows why!
P2 I believe has some structural issues, hence its closure to traffic and the track being removed. I believe it would be expensive to reinstate it, not only for the structural work, but the work on the track and signalling too.
It might already be the case but if it isn't would it make much difference if all tracks were bidirectional from the buffer stops at Portsmouth Harbour through to a few hundred meters north of Fratton?
Do all Waterloo-Pompey trains that won't be formed of 442s (once they get used again) get enough traffic to justify them all being 2x450, which could eliminate the need for some joining and splitting at Portsmouth Harbour
... What would be involved in bringing platform 2 at Portsmouth Harbour back into use?
To convert all lines from the Portsmouth Harbour buffer stops through to a few hundred meters north of Fratton to bidirectional, would it require a complete re-signalling ti implement?
It would require alterations and probably isn't worth doing now, there's no down facing crossing from the down to the up, you'd also need the actual signal and relevant AWS/TPWS, relays, etc and finally changes to the box at Havant (I still have never found out if Havant is panel or computer screened, and if there's any ARS, but that's a different subject)
Computer screens - no ARS
My hunch is something as stupid as the developers wanted the 'new' station to be called Portsmouth Gunwharf Quays or it wuld have meant a closure of the line between Southsea and the Harbour for a period during redevelopment (which would have been worse to the shambles during the PARS over-run how?).As for bringing P2 back into use down the harbour, that's a bit of a sore point, because when they were redeveloping Gunwharf Quays, the developer offered to build a brand new station with more platforms and the offer was declined. Gawd knows why!
You would struggle to put extra pay platforms in at Southsea because of the Matalan shop and car park, the new(ish) 12 car platform is much longer than the building there. As HD suggested earlier, you could possibly turn the DCS into an extra platform or 2, but you'd lose some berthing space as you'd probably only get 2 platforms in there instead of the 3 roads currently there. Also the issue is there is no up facing crossovers from the DCS or back road at all until Fratton east junction, so it wouldn't be able to call at Fratton without money spent on some crossovers.
It always strikes me as odd that the UP was never made BI-DI from Fratton East to the harbour, after all, they were spending that money anyway.
In regards to the harbour, people often forget about the fuel road that used to be there next to P5, and how would the cost economy compare to making a P6 compared with bringing 2 safely back to use.
Out of interest (I know nothing of the subject) you mention LED signals - why is this an opportunity missed though? Maybe they offer lower running costs and longer life than 'incandescent' ones, but are there any other advantages? Can't they just be dropped in at any time to replace the current ones - it wouldn't have to be part of a new resignalling scheme would it?Lots of opportunities were missed under the PARS including fll bi-direction to Fratton P1/2 and 3 was the main one and no LED signals.
It’s mentioned in this month’s Modern Railways.
Out of interest (I know nothing of the subject) you mention LED signals - why is this an opportunity missed though? Maybe they offer lower running costs and longer life than 'incandescent' ones, but are there any other advantages? Can't they just be dropped in at any time to replace the current ones - it wouldn't have to be part of a new resignalling scheme would it?
Out of interest (I know nothing of the subject) you mention LED signals - why is this an opportunity missed though? Maybe they offer lower running costs and longer life than 'incandescent' ones, but are there any other advantages? Can't they just be dropped in at any time to replace the current ones - it wouldn't have to be part of a new resignalling scheme would it?
It would require alterations and probably isn't worth doing now, there's no down facing crossing from the down to the up, you'd also need the actual signal and relevant AWS/TPWS, relays, etc and finally changes to the box at Havant (I still have never found out if Havant is panel or computer screened, and if there's any ARS, but that's a different subject)
Just tweeted SWR about the launch event, and received a reply that it's definitely happening tomorrow at Waterloo.
I'm guessing it won't be too much of a grand gesture tho, just a new livery unit in a platform and goodie bags, something along those lines?
Very hush-hush tho, still haven't seen anything about it, it's only through here I knew it was happening at all!![]()
Very hush-hush tho, still haven't seen anything about it, it's only through here I knew it was happening at all!![]()