Cambridge North: Cambridge's new station

Status
Not open for further replies.

TheDavibob

Member
Joined
10 Oct 2016
Messages
431
The Cambridge/Kings Lynn fasts all stop at Waterbeach currently, so must be 4 carrages only

They are, the first four splitting off/reattaching at Cambridge, but this in itself wouldn't stop them stopping at Cambridge North.

As of next month, the Cambridge fasts (previously terminating there) will run to Ely via Cambridge North. This is the only GN service that will stop at Cambridge North initially, and goes walkies in rush hour.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,422
Location
Hertfordshire / Teesdale
As these presumably will be using 387s shortly which have SDO, couldn't 2x387 call at waterbeach using SDO ?

In theory, maybe, although you would have the rear unit hanging over the level crossing - which seems now to be deemed unacceptable, or at least undesirable.

Also, the services being extended to Ely are generally going to be a mix of 2x365 and 2x387 in the May timetable, although of course this may change in the future. If the desire was there, it may have been possible to design the diagrams so that a unit could be dropped at Cambridge for the Ely part of the journey, but this would of course introduce complexity and unreliability. One presumes someone decided that the numbers of people expected to travel between Waterbeach and Cambridge North didn't merit these disbenefits.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Waterbeach IS planned- it's just not been scheduled well. The Outline planning application for the barracks site in its transport assessment promises that the 8-car extensions to the existing platforms will be a priority (I think they may be required by conditions to have that completed before anyone moves into any property on the site- we'll see what officers and councillors recommend and approve) and that the 12-carriage station on a site to the north of the existing station is to be built to serve the full development.

But because of that, nobody else (Network Rail, councils, etc) wants to spend a penny on doing the work there.
 

MikeWM

Established Member
Joined
26 Mar 2010
Messages
4,960
Location
Ely
Waterbeach IS planned- it's just not been scheduled well. The Outline planning application for the barracks site in its transport assessment promises that the 8-car extensions to the existing platforms will be a priority (I think they may be required by conditions to have that completed before anyone moves into any property on the site- we'll see what officers and councillors recommend and approve) and that the 12-carriage station on a site to the north of the existing station is to be built to serve the full development.

But because of that, nobody else (Network Rail, councils, etc) wants to spend a penny on doing the work there.

Unfortunately that hardly inspires confidence. There is quite a laundry list from recent years in Cambridgeshire of housing developers being 'required' to do things that have nevertheless gone on to do nothing of the sort, seemingly without consequence.

On that basis, we'll be lucky if anything happens in the next decade :(
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,663
It's a bit of a perfect storm, unfortunately, that no-one seems to have been capable of predicting in advance. Everyone who travels into Cambridge from the north knows that more capacity is urgently needed, but:

- we can't have more frequent trains, because Ely North junction works have been put off

- we can't have longer trains without SDO, because Waterbeach platforms need extending and that's been put off (and/or never officially been scheduled in the first place)

- we can't have longer trains with SDO at Waterbeach, even though we're about to get SDO trains, because either that fouls the level crossing (which possibly may be ok if altered (?), but no-one is planning on doing that) or the front end would be off the platform, which is apparently not allowed with DOO.

Also the power supply north of Milton Fen feeder station is an issue. Only 5 EMUs in section between there and Littleport and a further 5 EMUs north of Littleport to Kings Lynn moving is allowed.
 

MikeWM

Established Member
Joined
26 Mar 2010
Messages
4,960
Location
Ely
Also the power supply north of Milton Fen feeder station is an issue. Only 5 EMUs in section between there and Littleport and a further 5 EMUs north of Littleport to Kings Lynn moving is allowed.

Thanks, I knew there was yet another constraint but couldn't recall what it was.

Perhaps someone (GA??) could find an old DMU or two from somewhere, and put on a shuttle service in peak hours between Cambridge and Ely, calling at Cambridge North and Waterbeach, preferably timed to connect into those services that aren't able to call at the new station due to existing overcrowding. That seems just about the only plausible improvement to what is a right mess of a situation, until someone decides to sort out these numerous infrastructure issues.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
Thanks, I knew there was yet another constraint but couldn't recall what it was.

Perhaps someone (GA??) could find an old DMU or two from somewhere, and put on a shuttle service in peak hours between Cambridge and Ely, calling at Cambridge North and Waterbeach, preferably timed to connect into those services that aren't able to call at the new station due to existing overcrowding. That seems just about the only plausible improvement to what is a right mess of a situation, until someone decides to sort out these numerous infrastructure issues.

No chance of that. You've only got to look at 37s/68s on long term hire to see the shortages on the DMU front. Class 153s operating vice a 156 is still an almost daily occurrence.
 

MikeWM

Established Member
Joined
26 Mar 2010
Messages
4,960
Location
Ely
Yes, I know, I was mostly being facetious. I was going to suggest holding onto a 365 or 2 for the job, but the Milton power supply issue probably scuppers that idea.

As I said above, a perfect storm of infrastructure problems that no-one seems willing to sort out. As it stands, we can't have more trains that go through Ely North, we can't have more electric trains whether they go through Ely North or not, we don't have any more non-electric trains, we can't have longer trains without SDO stopping at Waterbeach, and we can't have longer trains with SDO stopping at Waterbeach!

It would be quite amusing if it wasn't quite so annoying.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,657
How about one of the 315s - aren't they soon to be going spare? Or even a spare 313 going back and forth! With a re-paint, most people don't know the difference...
 

arb

Member
Joined
31 Oct 2010
Messages
498
On the subject of not being able to have longer trains, I've always been impressed at what happens with the 0748 and 0756 departures from Ely towards Cambridge/London. These are two "short" trains that both originate from Kings Lynn (I think), following each other just a few minutes apart but with different stopping patterns, and they then join together at Cambridge to make a single long train to London.

Is there no scope for doing something similar with both the 0826 and 0858 departures from Ely (even if not all the way from Kings Lynn)? An additional train 5-10 minutes in front of both feels like it would help spread out the passengers in both cases (or at least definitely on the 0826; I'm not sure how much of the crowding on the 0858 is due to it being the first off-peak train, so providing another peak train there might not achieve much).

Is it a lack of trains that prevents this happening? Or the problem with too many electric trains at once in the different sections north of Cambridge? Or something else entirely?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,318
Location
Bolton
On the subject of not being able to have longer trains, I've always been impressed at what happens with the 0748 and 0756 departures from Ely towards Cambridge/London. These are two "short" trains that both originate from Kings Lynn (I think), following each other just a few minutes apart but with different stopping patterns, and they then join together at Cambridge to make a single long train to London.

Is there no scope for doing something similar with both the 0826 and 0858 departures from Ely (even if not all the way from Kings Lynn)? An additional train 5-10 minutes in front of both feels like it would help spread out the passengers in both cases (or at least definitely on the 0826; I'm not sure how much of the crowding on the 0858 is due to it being the first off-peak train, so providing another peak train there might not achieve much).

Is it a lack of trains that prevents this happening? Or the problem with too many electric trains at once in the different sections north of Cambridge? Or something else entirely?

Isn't this already happening with the 0551 from Kings Lynn and 0630 from Cambridge North?
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,195
Surely the power supply limitation is only going to get worse when the Class 387s are fully introduced to Kings Lynn?
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,442

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Everything seems to indicate that the station will indeed open this Sunday
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
As a matter of curiosity, is Sunday always the commencement date for operations that serve new stations?

More often than not they come in with a new timetable so that will always be a Sunday. Suppose it's a gentle day to kick things off.
 

TheDavibob

Member
Joined
10 Oct 2016
Messages
431
Does anyone know which of the various approach routes will be open come Sunday? (I'm mainly asking about the southern route from the river, though from what I've seen in the flesh it looked essentially finished).
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
I've not seen anything to indicate any routes won't be opened Sunday- so including the Moss Bank one
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,879
Location
East Anglia
Unbelievably I have heard drivers saying they are concerned about the braking point for stopping at this new station. I cannot help but worry about some of my colleagues :roll:
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,318
Location
Bolton
Unbelievably I have heard drivers saying they are concerned about the braking point for stopping at this new station. I cannot help but worry about some of my colleagues :roll:

Why might they be concerned?
 

TheDavibob

Member
Joined
10 Oct 2016
Messages
431
With regards Waterbeach et al, RAIL 827 suggests Great Northern believe that power supply upgrades and Watlington/Littleport/Waterbeach extensions will be complete "by the end of the year" (and thus 8-car 387s, presumably working in a stop at Cambridge North).
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
With regards Waterbeach et al, RAIL 827 suggests Great Northern believe that power supply upgrades and Watlington/Littleport/Waterbeach extensions will be complete "by the end of the year" (and thus 8-car 387s, presumably working in a stop at Cambridge North).
I also see that in the March 2017 update to the enhancements milestones the power supply upgrades (for this route) are stated to be only on the distribution operator's system (UKPN), suggesting that the railway's equipment is already capable. I don't think I'd noticed that point before.

The same document has not been recently updated regarding the platform work though.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,739
Location
"Marston Vale mafia"
Unbelievably I have heard drivers saying they are concerned about the braking point for stopping at this new station. I cannot help but worry about some of my colleagues :roll:

If they don't think they will stop from there, surely they should simply brake sooner (and report the matter)?
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Everything seems to indicate that the station will indeed open this Sunday

GA have done a big Comms push this week. Posters, announcements on trains, etc. Reminding passengers "if you come into Cambridge from the north, you may find Cambridge North easier than battling through town"

Also, an Easement (700714) has been added permitting all tickets (except Advances) for Cambridge to be used at Cambridge North, and vice versa.
 