61653 HTAFC
Veteran Member
Is the 155 still being refurbed ?
It will have been there for a year very soon![]()
A year tomorrow, I think. There was a post a week or two ago suggesting it isn't far off being outshopped though.
I have my doubts the 170s will be with Northern next summer, Scotrails refurbishment is running behind, the HSTs will most likely be late if Im any judge and the DMU fleat is at full stretch so I think they will be unreliable when they do move.
I thought they were to work Calder Valley? They will be hopeless on the loop due to acceleration
The 170s are planned to run Harrogate services, and non-Connect Calder Valley services, presumably along with other non-Connect services in Yorkshire, there'll be enough to go round. They may not be the quickest units around but will they be worse than the 150s and especially 155/153s that currently run the majority of Harrogate line services today?