DerekC
Established Member
Cambridge South? Why not call it Trumpington? That I believe is about where it will be.
Anything with Trump in it makes me nervous just now.
Cambridge South? Why not call it Trumpington? That I believe is about where it will be.
BBC local news last night were reporting that it will not open until May 2017, which seems a bit far off considering the current state of construction?
I prefer the station to be called Chesterton as it is located in the Chesterton area of Cambridge.
The location is about 2 miles north of the present station on the site of the former Chesterton Sidings of which a few tracks are still in use.!
It is also at the site of the junction of the long closed St. Ives branch. The guided bus service which now uses most of the former St. Ives line is being extended along another part of the old trackbed to serve the new station.
The station will serve the northern suburbs of the city and presume served by Kings Cross-Ely-Kings Lynn plus Cambridge- Norwich and Cambridge-Peterborough and west services?
BBC local news last night were reporting that it will not open until May 2017, which seems a bit far off considering the current state of construction?
Anything with Trump in it makes me nervous just now.
Photography is hard; the station building site is not close to currently accessible roads
Anything with Trump in it makes me nervous just now.
As far as progress goes:
(I'd imagine there's rather more to see from trains passing through).
A few photos, taken from variously:
Moss Bank, which will be the southern pedestrian and cycle access, ideally positioned for the future new bridge
Fen Road Level Crossing (the dark grey jagged building is the solar-roofed cycle park)
Busway extension, for western access
Cowley Road- the motor vehicle access.
... while every other service will stop.
...
But then I would not expext any else from a German owned company.
Stopping XC at Cambridge North would provide a useful link to Stansted as well as Peterborough and beyond. I would have thought it was a reasonable thing to expect in the next franchise but stopping the service now would probably cause it to miss paths south of Cambridge.
Pretty sure GA intend on running their Norwich-Cambridge service to Stansted, stopping at Cambridge North.
Cross-Country is not going to stop at Cambridge North, instead just race through while every other service will stop.
I wish this were true, but the situation for commuters from the north is significantly worse even than that under the current proposed timetable - as well as no XC stops, no GN train from the north is going to call between 0727 and 1019 (!).
As a commuter from Ely working on Cambridge Science Park I was looking forward to the new station, but the timetable currently set for May is really quite pathetic for those commuting from the north
If we say the peak time is 0800-0930 - in that time, I make it that there are two services from the north that will stop at Cambridge North
0814 GA from Ely to Liverpool St
0850 GA from Norwich to Cambridge
and six (!) services - 4 GN and 2 XC - which will pass through without stopping.
It is very hard to see how this satisfies what was apparently one of the main aims for the station - to help commuting from the north into Cambridge, especially the area around the Science Park. I appreciate this will improve later, if Waterbeach is ever extended and if Ely North is ever remodelled, but it is a very disappointing start.
Does May 2017 still remain as the opening month?