Cambridge North: Cambridge's new station

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Alfie1014

Established Member
Joined
27 Jun 2012
Messages
1,205
Location
Essex
BBC local news last night were reporting that it will not open until May 2017, which seems a bit far off considering the current state of construction?
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Construction on the railway side is well advanced, but non-railway hasn't started as there's been big hold ups whilst Network Rail and the local councils worked through the fine details of access arrangements. Although it shouldn't be, much of the negotiations have been muddled up with the negotiations over land use for the Abbey-Chesterton Bridge and the Chisholm Trail.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,290
Location
North West
BBC local news last night were reporting that it will not open until May 2017, which seems a bit far off considering the current state of construction?

I had read this a few days ago.

I am also wondering when the refurbishment of Cambridge station itself will be complete, if it is not already completed.
 
Joined
14 Aug 2012
Messages
1,070
Location
Stratford
I prefer the station to be called Chesterton as it is located in the Chesterton area of Cambridge.

The location is about 2 miles north of the present station on the site of the former Chesterton Sidings of which a few tracks are still in use.!
It is also at the site of the junction of the long closed St. Ives branch. The guided bus service which now uses most of the former St. Ives line is being extended along another part of the old trackbed to serve the new station.
The station will serve the northern suburbs of the city and presume served by Kings Cross-Ely-Kings Lynn plus Cambridge- Norwich and Cambridge-Peterborough and west services?

Sound feasible I guess but Cambridge Science Park it should be based on the fact its easy to search for those visiting the Science Park for the first time, someone not local will not know about Chesterton
--- old post above --- --- new post below ---
BBC local news last night were reporting that it will not open until May 2017, which seems a bit far off considering the current state of construction?

Guess its about the timetables, probably too soon for Dec 2016 so May 2017 it is
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
As far as progress goes:

cycling along the busway extension east of Milton Road the platform lift shafts are no clearly visible (I'd imagine there's rather more to see from trains passing through). Photography is hard; the station building site is not close to currently accessible roads
 

AE

Member
Joined
5 Jan 2012
Messages
57
Photography is hard; the station building site is not close to currently accessible roads

You get a half decent view from the Fen Road level crossing. It's a bit in the distance but clearly visible.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,016
As far as progress goes:

(I'd imagine there's rather more to see from trains passing through).

I went through there on a train last week. There are platforms and trackwork in place - the platforms have safety fences along the edge facing the track to protect the workforce from passing trains. Some OLE structures are in place but it isn't all wired yet, if I remember correctly. The lift shaft core for the station building is being cast. I note that there's a possession between Cambridge and Ely coming up on Sunday 8th, so that may be related.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,664
Indeed there is a possession between Ely and Cambridge on Sunday 8th.

Also between Ely and Peterborough / Brandon / Downham Market.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
There's a Cambridge-Kings Lynn closure on the 22nd as well. Guess at least one of those days will be craning the station bridge into place.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
A few photos, taken from variously:
Moss Bank, which will be the southern pedestrian and cycle access, ideally positioned for the future new bridge
Fen Road Level Crossing (the dark grey jagged building is the solar-roofed cycle park)
Busway extension, for western access
Cowley Road- the motor vehicle access.
 

Attachments

  • 2017-01-22 11.40.56.jpg
    2017-01-22 11.40.56.jpg
    217 KB · Views: 163
  • 2017-01-22 11.42.14.jpg
    2017-01-22 11.42.14.jpg
    149.6 KB · Views: 135
  • 2017-01-22 11.42.24.jpg
    2017-01-22 11.42.24.jpg
    185.4 KB · Views: 132
  • 2017-01-22 11.44.52.jpg
    2017-01-22 11.44.52.jpg
    226.6 KB · Views: 121
  • 2017-01-22 11.48.05.jpg
    2017-01-22 11.48.05.jpg
    148.8 KB · Views: 138
  • 2017-01-22 11.57.12.jpg
    2017-01-22 11.57.12.jpg
    241.4 KB · Views: 119
  • 2017-01-22 12.03.02.jpg
    2017-01-22 12.03.02.jpg
    191.1 KB · Views: 116
  • 2017-01-22 12.03.10.jpg
    2017-01-22 12.03.10.jpg
    176.7 KB · Views: 113
  • 2017-01-22 12.10.15.jpg
    2017-01-22 12.10.15.jpg
    192.9 KB · Views: 117

ocelocelot

Member
Joined
10 Jan 2017
Messages
32
A few photos, taken from variously:
Moss Bank, which will be the southern pedestrian and cycle access, ideally positioned for the future new bridge
Fen Road Level Crossing (the dark grey jagged building is the solar-roofed cycle park)
Busway extension, for western access
Cowley Road- the motor vehicle access.

Thanks for the photos! They've evidently made progress on the busway extension since I last checked. Eagerly awaiting 21 May!
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Yes, the "Class 387 to GN" thread there's been some discussion of the Cambridge North timetable as the times are now appearing, for May, in the various public systems.
 

Firesprite

Member
Joined
22 Dec 2011
Messages
295
Location
Fens
Cross-Country is not going to stop at Cambridge North, instead just race through while every other service will stop. So much for me being to get to work early, I would have to change at Ely. A fact I confilmed with Cross-Country via email, Their reply was 'That under the specifications of its franchise agreement with the Department for Transport its trains were not required to stop at the Cambridge North station.' But then I would not expext any else from a German owned company.
 

TheDavibob

Member
Joined
10 Oct 2016
Messages
431
They shouldn't stop at Cambridge North. This is coming from someone who's closest station will be Cambridge North and who, reasonably frequently, uses the Cross Country northbound.

The XCountry service should be a fast service. Frankly, as I've said before, it shouldn't really be stopping at Melton Mowbray, Stamford, Oakham or March, but given the other services that run the route I see why it does. Given the near-future Cambridge North timetable includes four services hourly into Cambridge without even including GA services, the service is pretty good.

I agree it isn't ideal, particularly Northbound, but that isn't really XCountry's fault. Also, I highly doubt their German ownership has anything to do with it.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
... while every other service will stop.
...
But then I would not expext any else from a German owned company.

Except for the Kings Lynn services every hour of course.

I agree TheDavibob that it is probably for the best. XC can be wedged at the best of times with inter-regional passengers before the added strain of punters just making short hops between local towns (it's the same for most of the rest of their network). I will grant you that it's not great that northbound there's no reasonable connection at Ely for it, but sadly that's the constraints of railway timetabling! As TheDavidbob again said, I too doubt the nationality of their owners is anything to do with it.

Maybe with time things will change too - neither EMT or TPE served Liverpool South Parkway in its early years...
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,749
Location
Nottingham
Stopping XC at Cambridge North would provide a useful link to Stansted as well as Peterborough and beyond. I would have thought it was a reasonable thing to expect in the next franchise but stopping the service now would probably cause it to miss paths south of Cambridge.
 

TheDavibob

Member
Joined
10 Oct 2016
Messages
431
Stopping XC at Cambridge North would provide a useful link to Stansted as well as Peterborough and beyond. I would have thought it was a reasonable thing to expect in the next franchise but stopping the service now would probably cause it to miss paths south of Cambridge.

Pretty sure GA intend on running their Norwich-Cambridge service to Stansted, stopping at Cambridge North.
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,016
I went down to take a look at the site this afternoon. There's still plenty of civils left to be done on the approaches - the section of busway road that will lead to the station itself is still unsurfaced inside the station site. But the station buildings themselves (as far as they can be seen) look very smart.

Stopping patterns: the GN local train (the Foxton/Shepreth/Meldreth one) will start from Cambridge North in May, which will suit a number of my colleagues - I work in Meldreth. However, the timetable consultation for the start of the Thameslink services suggests that it'll go back to terminating at Cambridge mains station in a couple of years time. It'll be interesting to see how the services get swapped around - there'll be a lot of changes over the next couple of years.
 

MikeWM

Established Member
Joined
26 Mar 2010
Messages
4,965
Location
Ely
Cross-Country is not going to stop at Cambridge North, instead just race through while every other service will stop.

I wish this were true, but the situation for commuters from the north is significantly worse even than that under the current proposed timetable - as well as no XC stops, no GN train from the north is going to call between 0727 and 1019 (!).

Apparently this is related to the short platforms at Waterbeach and so anything calling there is already a very busy 4-car that can't be extended, so they don't want to make these trains even busier than they already are.

As a commuter from Ely working on Cambridge Science Park I was looking forward to the new station, but the timetable currently set for May is really quite pathetic for those commuting from the north :(

If we say the peak time is 0800-0930 - in that time, I make it that there are two services from the north that will stop at Cambridge North

0814 GA from Ely to Liverpool St
0850 GA from Norwich to Cambridge

and six (!) services - 4 GN and 2 XC - which will pass through without stopping.

It is very hard to see how this satisfies what was apparently one of the main aims for the station - to help commuting from the north into Cambridge, especially the area around the Science Park. I appreciate this will improve later, if Waterbeach is ever extended and if Ely North is ever remodelled, but it is a very disappointing start.
 
Last edited:

Firesprite

Member
Joined
22 Dec 2011
Messages
295
Location
Fens
I wish this were true, but the situation for commuters from the north is significantly worse even than that under the current proposed timetable - as well as no XC stops, no GN train from the north is going to call between 0727 and 1019 (!).

As a commuter from Ely working on Cambridge Science Park I was looking forward to the new station, but the timetable currently set for May is really quite pathetic for those commuting from the north :(

If we say the peak time is 0800-0930 - in that time, I make it that there are two services from the north that will stop at Cambridge North

0814 GA from Ely to Liverpool St
0850 GA from Norwich to Cambridge

and six (!) services - 4 GN and 2 XC - which will pass through without stopping.

It is very hard to see how this satisfies what was apparently one of the main aims for the station - to help commuting from the north into Cambridge, especially the area around the Science Park. I appreciate this will improve later, if Waterbeach is ever extended and if Ely North is ever remodelled, but it is a very disappointing start.

I also comute to the Cambridge Science Park from March, Train is already standing room only when it arrives in March. When you get to Ely and you need to change trains, you have to fight your way off in the morning againist people pushing their way on as they don't wait to let you off first. Many people that I also travel with, are also heading to the Science Park. And like me were looking forward to saving money on Plusbus fares with the Park only being ten minutes walk away.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
There will be a (small) number of GA trains calling at Ely and Cambridge North in that time.

At my last job I had a colleague who commuted Waterbeach-Whittlesford, there were often mornings where he was late because he could not board the train at Waterbeach. Sadly until those platform extensions are done GN are right not to stop at both, especially in peak time. Using SDO on 387s wouldn't really be feasible in this situation.

Of course the Waterbeach Barracks plan needs a whole new station in order to be able to build 12-car platforms.
 