Is it not a fact that trams are more expensive to operate than a heavy rail solution with equivalent capacity/performance?
Is it not a fact that trams are more expensive to operate than a heavy rail solution with equivalent capacity/performance?
Being in the field of senior management for over thirty years, the only way that I would view this is from the perspective of a business model. Successful businesses do not thrive on sentiment. The question to be asked is if the said branch line is profitable or not. If not, it is meaningless to replace a Class 142 Pacer with another unit. The most sensible financial thing to do is just close down the branch line service, that point being the alternative that you state. That then brings into equation of the actual reality of the franchise requirements.and how the wording of that actually reads, in terms of what action would be allowed.
Let us not enter into "Titfield Thunderbolt" reasoning, which was purely based on sheer emotive sentiment.
But it wouldn't be tram-trains.... it would be trams?
Delta-RAil came to the conclusion that a low performance electric traction supply would be inexpensive to provide - at which point the lower performance and structural demands of a tram will start to tell against a heavy rail diesel unit. If we were permitted third rail it might be a different story - but we aren't.
Is it not a fact that trams are more expensive to operate than a heavy rail solution with equivalent capacity/performance?
As for simply culling branch lines, rather than providing a low-cost solution... eh?
Are you aware of how the Manchester Metrolink system is funded?
History has shown us that a 'lack of demand' can be engineered when it suits the powers that be.I have emboldened the most relevant part of your posting.
Several lines are effectively already completely segregated or could (fairly) easily be made so, for example the St Ives Branch and the Exmouth Branch (you could single the section between Central and Exmouth junction and run a tram on the other track).But how many branch lines are totally segregated from the rest of the network, such that a tram or similar would never have to share track with anything else?
Probably on the back of a low loader.There is also the question of how a unit gets to a depot (unless money is spent on building one on the branch itself)
Why bother?and how a spare unit would be provided for maintenance and breakdown cover.
Well for one thing it won't make any difference, because at £2.5m/track-km it comes out orders of magnitude higher than the proposals in that document anyway.The remit for the Delta Rail report was flawed, in that it only considered electrifying the branch itself and not network issues such as these, or indeed the likelihood of the main line being electrified at 25kV allowing power to be fed onto the branch.
Let's say that the line is profitable, but not excessively so. And you have a choice between a lease of a brand new unit which would eliminate the profit, or a cheaper re-purposed one that would leave a surplus? What then?The question to be asked is if the said branch line is profitable or not. If not, it is meaningless to replace a Class 142 Pacer with another unit.
Blackpool is missing from your listPerhaps someone with more detailed knowledge that I could answer your query, but current systems in operation are:-
Sheffield Supertram
Manchester Metrolink
Edinburgh Trams
Croydon (?) Tramlink
Midland Metro
Nottingham Express Transit
Do not forget that these tramways can all serve parts of city cores in more depth than heavy rail, which is a matter that should not be overlooked. Service frequencies of trams are far better than their heavy rail equivalents, when calculating passengers numbers being carried.
Closing branch lines would mean that people on the branch lines would drive to the nearest station and then get the train from there. I won't explain why this is a bad thing because most of the people on this forum will be able to figure it out.
Let's say that the line is profitable, but not excessively so. And you have a choice between a lease of a brand new unit which would eliminate the profit, or a cheaper re-purposed one that would leave a surplus? What then?
Blackpool is missing from your list
As history shows, that is not a safe assumption to be had.
I'll give it one last go.
No sentiment is involved. The existing units on the line are life expired. New units would be too expensive and tip the line into a loss, however 230s are cheap enough to keep the line open. Would you use them or see the line closed?
Remember this whole conversation started from your comment in #4461.
2019 isn't that far away. I dare say that Booths are already making space for all the Pacers that'll be heading their way.However, you make the hypothetical point above that the existing units on the line are life expired...
However, you make the hypothetical point above that the existing units on the line are life expired. There is no current real-life scenario where this is the case, so I reiterate that you are using a hypothetical premise.
Oh dear, I can well imagine how that particular Class 230 aspiration would be received by certain political parties over the border...![]()
Are the Pacers not long overdue for withdrawal? Do not forget that there exists a franchise currently operating a number of Pacer units for which replacement plans have not been finalised. To add to this, a number of the earlier Sprinter-type classes will only have a limited lifespan beyond 2020, if indeed they are to be made compliant.
Is it not a fact that trams are more expensive to operate than a heavy rail solution with equivalent capacity/performance?
Are the Pacers not long overdue for withdrawal? Do not forget that there exists a franchise currently operating a number of Pacer units for which replacement plans have not been finalised. To add to this, a number of the earlier Sprinter-type classes will only have a limited lifespan beyond 2020, if indeed they are to be made compliant.
No, generally a tram would be between a third and half the running cost of a comparative heavy rail system until you get up in to heavy metro train length systems.
The likely solution for Sprinters is that the toilets will simply be locked OOU.
Job done.
Are the Pacers not long overdue for withdrawal? Do not forget that there exists a franchise currently operating a number of Pacer units for which replacement plans have not been finalised.
Perhaps someone with more detailed knowledge that I could answer your query, but current systems in operation are:-
Sheffield Supertram
Manchester Metrolink
Edinburgh Trams
Croydon (?) Tramlink
Midland Metro
Nottingham Express Transit
Do not forget that these tramways can all serve parts of city cores in more depth than heavy rail, which is a matter that should not be overlooked. Service frequencies of trams are far better than their heavy rail equivalents, when calculating passengers numbers being carried.
The likely solution for Sprinters is that the toilets will simply be locked OOU.
Job done.
You forgot Blackpool!![]()
Is this due to disability regulations requiring a disabled toilet for stock if they have toilets installed? If so that would be quite a shame, almost the opposite of what disability regulations are trying to achieve.
It's one way to ensure that able-bodied and disabled have equal access to toilet facilities. So, technically, the law has had its intended effect.If so that would be quite a shame, almost the opposite of what disability regulations are trying to achieve.