Can't they use spare masts from Carlisle Kingmoor yard and get the job done cheaply?
Oh, sorry, stuck in the early 80's again.
Just think, if BR had got on with the job then, we could this year be celebrating the 30th anniversary of the introduction of shiny new electric trains to the branch, and looking forward to a second generation of shiny new EMU's operating the service!
Something genuinely worth shouting about.
--- old post above --- --- new post below ---
Given the route is 20 minutes, and presumably a 40 minute round trip, what's the need to have any passing loops? Also these times will surely reduce once electrified.
So that a second train can operate on the branch i.e. a better than hourly regular service, or for less frequent long distance services or for occasional excursions to visit this obscure tourist destination. For example a daily direct service from London on the current WCML, or in future direct from Heathrow Airport, along HS2.
