Okay that's enough. Let's not go off on yet another discussion about Hitachi and the 800s. We have a dedicated thread for that already. Thank you.
Interesting. The FLIRTS are shown as an articulated train. I do wonder if they would keep it like this or this is a stock image...
I'm also very happy Bombardier have won the massive contract to build the fleet or the majority of it anyway. These trains will be built in the UK. Stops orders going off to Italy!
Especially considering the announcement says they will refresh the existing stock until the new stock arrives - presumably meaning new seat covers and a repaint.
Interesting. The FLIRTS are shown as an articulated train. I do wonder if they would keep it like this or this is a stock image...
You've never driven a 379![]()
![]()
![]()
It's possible I suppose that a GPS tracking device could calculate what station a train is at and lock the appropriate doors. Or that the driver will have a choice of buttons. You could even have one door on the end units so that the front can overhang.
Longer platforms would be the preferable option though.
It's possible I suppose that a GPS tracking device could calculate what station a train is at and lock the appropriate doors. Or that the driver will have a choice of buttons. You could even have one door on the end units so that the front can overhang.
Longer platforms would be the preferable option though.
I'd say this looks truly excellent news - a huge investment for a massive step change in quality. More, please.
I'd be interested to see how a loss of 2 car units will go down. There are a lot of services were 3 is lightly loaded and 4 would be overkill, plus the 9 platforms (on Norfolk rurals alone) that can't hold 3 cars, let alone however many platforms cant hold 4.
2 x Norwich in 90 mins and 1 x Ipswich in 60, so assume the Norwich in 90 will be fast at Ipswich !in fact fast from Norwich to London and at 3 in the morning
Sudbury to the Town & North, been done before and no one used it, same with the Lowestofts to London's.
Do we need 3 an hour Norwich to London all day ?
Remember when we had 4 an hour Ipswich to London, when 1 was late everything was late for hours after !
surprised they did not resurrect Harwich to Ipswich
If they are articulated, vehicle length will be shorter than normal, like Eurostar.
So 12-car Flirts may be similar to say 10-car normal.
Interesting you say nobody used Low to Londons, are you an east suffolk line user? They sure did and stopped a lot of people driving to ipswich
Sent from my iPhone using Tapatalk
Twitter is going mental with outrage. Why? They have screamed for investment for years and now they have got it they are all moaning again.
Hilarious![]()
I recall the 170's passing Colchester, virtually empty some days...and the Basingstoke's !
Has there been any mention of improvements to 1st class and also onboard catering?
As ever, I wonder what the other bidders offered? I wonder if anyone went down the refurbishment route? I get the feeling the DfT wants new rolling stock and the way to win future bids is to go down that road, sorry, track.
Swiss ones have 16m (6 bay) intermediates.