Thameslink/ Class 700 Progress

Status
Not open for further replies.

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I'm really sorry but I actually meant going north

In which case, either 1W24 (Gat 1108 d110), 2W30 (Gat 1103 d1108) are your only real options, if you can hang around that bit longer. Bear in mind though, that a lot of these services have been cancelled today.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

168lover

Member
Joined
2 Aug 2013
Messages
625
Location
Chiltern Mailine Land
In which case, either 1W24 (Gat 1108 d110), 2W30 (Gat 1103 d1108) are your only real options, if you can hang around that bit longer. Bear in mind though, that a lot of these services have been cancelled today.

I'll be arriving at 10:00 into Gatwick so would there be any before 11:10?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,836
Location
UK
Have any Class 700s had to leave people behind yet?
Can't see that happening for some time. The space inside should make them excellent people movers in the peaks. Perhaps if one or two 12 car trains before get cancelled it will be a different story though!
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,008
Location
St Albans
Can't see that happening for some time. The space inside should make them excellent people movers in the peaks. Perhaps if one or two 12 car trains before get cancelled it will be a different story though!

But still infinitely better than if a 377/387 gets dropped.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,836
Location
UK
Yes. Has anyone worked out the theoretical maximum for people able to get on a crush loaded train? It must be a lot.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Yes. Has anyone worked out the theoretical maximum for people able to get on a crush loaded train? It must be a lot.

It must get worked out, because the train designers design the suspension (and hence determine the kinematic envelope for gauge clearance) for the possibility of crush loading.

I've never seen figures tabulated for a range of mainline rolling stock; however LU have published theoretical crush loads for various tube trains in the past. IIRC they allowed for 7 people per sq m for their crush load condition.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
It must get worked out, because the train designers design the suspension (and hence determine the kinematic envelope for gauge clearance) for the possibility of crush loading.

I've never seen figures tabulated for a range of mainline rolling stock; however LU have published theoretical crush loads for various tube trains in the past. IIRC they allowed for 7 people per sq m for their crush load condition.

The official standing is 1,084 which is probably at 4/sqm ( equivalent of seating +standing of 145 per car and given 190+/car is just possible on some existing stock so at 7/sqm it would be nuts (over 2500 for a 12 car)
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,008
Location
St Albans

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,709
Location
West of Andover
I've knocked-up a timetable sheet based on the diagrams given for this weeks class 700s:

View attachment 27488

These may assist those that intend to intercept the soft launch trains at various intermediate stops. If there are any mistakes in the data, please let me know.

You could probably include that service which runs to/from London Bridge
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,008
Location
St Albans
You could probably include that service which runs to/from London Bridge

I could except it took ages to get a .pdf that accomodated all the stations on a single sheet. Maybe when some more diagrams are released I'll have a try because there will be to many journeys to fit on one sheet horizontally.
 

Class377

Member
Joined
24 Aug 2009
Messages
444
The official standing is 1,084 which is probably at 4/sqm ( equivalent of seating +standing of 145 per car and given 190+/car is just possible on some existing stock so at 7/sqm it would be nuts (over 2500 for a 12 car)

I'm by no means an expert - but I wouldn't be surprised if they took something crazy like that as the crush loading conditions. It's a common occurrence in engineering to go a little over-the-top in extreme cases to give it a bit of built-in redundancy.

If they planned for 4/sqm, and that occurred throughout the train but one more person squeezed on, you'd be in a situation where everybody could feasibly fit in but the train is now heavier than it's been safely designed/tested for. If you sort it out at 7/sqm you're confident that it's never actually going to go above that, and you're in the clear.

Much safer in engineering to over-compensate, than to build it right "on the money" and risk being prone to incredibly extreme conditions.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
.

If they planned for 4/sqm, and that occurred throughout the train but one more person squeezed on, you'd be in a situation where everybody could feasibly fit in but the train is now heavier than it's been safely designed/tested for.

The units I drive will prevent the train from moving if its overloaded. I would hope a 700 has a similar safety system.
 

trainmania100

Established Member
Joined
8 Nov 2015
Messages
3,031
Location
Newhaven
Can the last door on class 700s not open at Gatwick Airport?
The information board stated the front 11 cars only for Gatwick.
Apologies of this has been raised already.
Unit 700112 was at Brighton when the information was raised.
 
Last edited:

Class2ldn

Established Member
Joined
25 Feb 2011
Messages
1,400
All the ones I've had have released 12. There was an issue before.
The big issue we have with them is at some stops if we are terminating we have to go past the normal stop board to the T board associated with flu or all and then do a manual release.
Had it when I brought one out of bridges depot with no headcode and pis. It only released 4 so had to manually override it.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,790
Location
Epsom
Those colourful chevron things? No, these are fairly similar in size to the usual main line stop boards. The differences are that they are diamond shaped and a different colour to the existing "car stop" boards, and use FLU and RLU to denote length, rather than 12 or 8. They are also positioned for viewing from the central driving position on a 700; and so at some stations are not at exactly the same places as the 12 car boards.

Oh those things - yes; I'm aware of them. Just didn't twig from the different description in this thread that it was those...
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Can the last door on class 700s not open at Gatwick Airport?
The information board stated the front 11 cars only for Gatwick.
Apologies of this has been raised already.
Unit 700112 was at Brighton when the information was raised.

Not all platforms can support 12 car working. Can't remember what the situation is but the beacons are fully up and running just yet so interim solution is 11 coaches in the database. Won't be for long.
 

Segedunum

Established Member
Associate Staff
International Transport
Joined
22 Dec 2013
Messages
4,749
Location
Up North
Anybody looking to travel on a 700 today be aware that there is major disruption at Gatwick Airport so 700s are off schedueld diagrams.
Ah that's not great to hear. Was hoping to capture one on the 1140 Bedford-Brighton, assume that's not being 700 worked?
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Anybody looking to travel on a 700 today be aware that there is major disruption at Gatwick Airport so 700s are off schedueld diagrams.

The 750V DC appears to have set itself on fire on the crossover south of the station.
 

zephyr

Member
Joined
18 May 2014
Messages
7
Thameslink are reporting that these trains are not running due to staff being unavailable
 
Last edited:

168lover

Member
Joined
2 Aug 2013
Messages
625
Location
Chiltern Mailine Land
Ah that's not great to hear. Was hoping to capture one on the 1140 Bedford-Brighton, assume that's not being 700 worked?

I was looking at getting the 09:16 Gatwick-West Hampstead but it got cancelled so got a pair of 387s instead. I'm looking at trying to get a 700 later.
 
Status