• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Gatwick Express Industrial Relations

Status
Not open for further replies.

birchesgreen

Established Member
Joined
18 Aug 2015
Messages
7,660
Location
Solihull
Returning to the original news story at the start of the thread i read

"And because the new carriages are slightly shorter than on the old trains, the 12-carriage trains are only actually 14 metres longer than the ones they replace."

Is it just me or is 14m actually quite a difference
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,659
The same argument could be made for additional guards, dispatchers and even a secondman?

It is a balance of risks but you need to discuss changes with your workforce representatives at the very least.

It depends what you are talking of with regards to 14 metres. The trains are already pushing past 200 metres, so it is probably around 7% additional length. My concern is that whilst 14 metres doesn't sound long, can we be confident that it is adequately covered.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,771

NSEFAN

Established Member
Joined
17 Jun 2007
Messages
3,518
Location
Southampton
There's little point in getting lost in "what-ifs", as this will just descend into a standard I love/I hate DOO thread.

It appears that the current agreement on Gatex for DOO is for no more than 10 cars. In which case, there needs to be an agreement in place to permit 12 car operation. If Govia want 12 car DOO then they should talk to the union about it, or otherwise roster enough guards so that 12 car services can run as intended.

This need to agree changes with the unions might seem weird to people who aren't involved in the industry, but the railway is still a highly regimented place where procedures are established and followed to the letter. "It's only 2 extra coaches, what's the harm?" doesn't make it okay for a driver to deviate from the agreed methods of working. If they did, and something went wrong, they would be the one to get it in the neck. The James Street incident made this quite clear.
 

spangles

Member
Joined
26 Feb 2016
Messages
58
Well that puts a different slant on it. No mention of train length. Indeed it is the standard BR era DOO agreement, with one amendment from 1997 re staffing of stations where DOO kit has failed.

However it is possible that there is a separate specific agreement that does detail it. If so, and if I were ASLEF, I would publish it to show all concerned what the issue actually is.

I think Rick has a point here. There appears to be no such agreement (at least within the t&cs which limits DOO to 10 car trains. I can therefore understand GTRs logic:
- 12 car operates on majority of that line already (with the same units)
- ASLEF drive vets drive such trains therefore they themselves can not believe there is a safety issue
- under the T&Cs this is not prohibited
- drivers are not not being asked to drive these trains when they have been trained by n them
- this is a DOO approved route

Why should they therefore have expected an issue here?
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
It depends what you are talking of with regards to 14 metres. The trains are already pushing past 200 metres, so it is probably around 7% additional length. My concern is that whilst 14 metres doesn't sound long, can we be confident that it is adequately covered.

It may be 14m longer, but there are also 4 extra doors for the driver to now watch and act on during door operations.
 

Stow

Member
Joined
12 Oct 2015
Messages
76
I understand GTR have consultative rights with the union, as opposed to needing to 'agree' everything with them. Meaning they discuss changes but can end up with differences of opinion and forcing them through as Sarahj says.

I could imagine the conversation went something like this;
TOC: Can we speak with you about 12 car introduction as DOO
ASLEF: No
TOC: Ok then, we have tried to consult but you won't talk to us so we will run a train and see what happens.

ASLEF now have to come to the table to discuss, otherwise any industrial action could be illegal.

Wonder where this will go now, difficult for ASLEF to stick to their DOO policy given other parts of same TOC.....
 

infobleep

On Moderation
Joined
27 Feb 2011
Messages
13,451
It's a question, but not the key one, which is (I think); was agreement reached or even thought to be needed, for the specific GatEx 12 car operations, or did GTR management assume that the agreement (again, assuming one is in place) for TL 12 car trains would cover the issue? If it hadn't been this 'launch' working, the issue would have arisen, presumably, the first time a 12 car formation was used.

A further question might be; what is different about the GatEx workings in ASLEF's view that sets them apart from the TL workings with virtually the same stock on almost the same route?

Well it's a different brand so it can't apply. Perhaps ASLEF could try and issue a penalty fair notice to Govia for trying to run a Thameslink brand agreed 12 car service on Gatwick Express brand service where it's not been agreed!

Sent from my SM-G925F using Tapatalk
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,771
Is that true though? all stations they stop at have dispatch staff?

I don't think that's the case - there's a 12 car DOO service on its way to Brighton now that stops at Burgess Hill, Hassocks and Preston Park.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,909
Yes but aren't you mostly referring to a previous time period , SWT as we know it hasn't long left to run anyway , TFL will take over some services which may or may not become DOO at some point ,and a future operator will decide on the rest depending I suppose mainly on what's agreed between them and the DFT for the next franchise

http://www.southwesttrains.co.uk/Guards.aspx

Seems pretty current to me and the same publicity is published in full size poster form around their stations at the moment. Far from playing on the DfT/McNulty line of keeping quiet/encouraging DOO.

If any future operator tries it they can expect a full scale attack as DOO is not in any way shape or form even tenuously agreed on SWT following the 1990s issues. The management coming around to the union's train of thought over a period of time is rather unusual and may even be a record!

You might also note from casual observation of Stagecoach Group guards that unlike at other TOCs there has been no direction not to wear the yellow RMT 'keep the guard on the train' badges...

So again, hopefully the drivers and guards on GTR can come up with something. Or at the very least cause the poor excuses for human beings coming up with these ideas some sleepless nights and time away from their families in the process. And yes, I really do bitterly hate them in the same way the miners carry a special card for Thatcher (whether justified or not).
 

neilm

Member
Joined
3 Jan 2012
Messages
501
I don't think that's the case - there's a 12 car DOO service on its way to Brighton now that stops at Burgess Hill, Hassocks and Preston Park.

I do not see any Gatwick Express doing that

Gatwick Express off peak seem to be VIC, GTW, sometimes HHE and BTN.
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
If there is no agreement you don't allocate 12 cars to a train that can't be worked as a 12 car. Who knows what control were doing, not controlling, clearly... The driver can't take it if there is no agreement to do so, the question is how /why did a 12 car end up in the platform for it.

It would be a planning issue rather than control. Control react to issues brought to their attention - quite often as a result of planning errors.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,254
Returning to the original news story at the start of the thread i read

"And because the new carriages are slightly shorter than on the old trains, the 12-carriage trains are only actually 14 metres longer than the ones they replace."

Is it just me or is 14m actually quite a difference

230m vs 244m and the 387s have in cab monitors and carriage mounted cameras
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,254
It may be 14m longer, but there are also 4 extra doors for the driver to now watch and act on during door operations.
Note swap from platform staff and slam door DOO to train mounted cameras, in cab monitors, automatic doors with sensing and smaller platform train gaps
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,519
Location
Isle of Man
I don't think that's the case - there's a 12 car DOO service on its way to Brighton now that stops at Burgess Hill, Hassocks and Preston Park.

As has been alluded to elsewhere on the thread, the limits of the agreement have been stretched. Certainly when the first Thameslink 12-cars operated they did only stop at the stations with despatch; the Electrostars were always on the fasts.

I would say credit to the driver for sticking to his guns. Maybe I'm just a cynic, but I can't help wonder why GoVia stuck a 12-car out at 5.30 on a Saturday morning, when a) you'd normally fit all the prospective passengers into a minibus and b) normally GoVia have no urge to stick anything more than four cars out off-peak even when it's busy.
--- old post above --- --- new post below ---
Note swap from platform staff and slam door DOO to train mounted cameras, in cab monitors, automatic doors with sensing and smaller platform train gaps

The in-cab monitors don't change the fact there's another four sets of doors to watch out for.

I think Merseyrail guards can tell us a few things about the dangers of the passenger-train interface...
 
Last edited:

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
There is at least one other operator who had a similar issue with ASLEF recently, where members were instructed not to drive longer trains under DOO, but on an erroneous basis, as train length was not specified in the DOO agreement. Needless to say in that case the longer trains are running DOO now.

Perhaps the definition of how length is measured needs to be clarified? If the agreement says 'coaches', then the driver has done nothing wrong. If the agreement says 'metres', then if the train was longer than the agreed length for DOO, then the driver has done nothing wrong. The company appear to be trying to bend agreed rules. If it was the other way around, and a member of staff were trying to bend the rules, would the company be so willing to accommodate?
 

Greenback

Emeritus Moderator
Joined
9 Aug 2009
Messages
15,268
Location
Llanelli
I would say credit to the driver for sticking to his guns. Maybe I'm just a cynic, but I can't help wonder why GoVia stuck a 12-car out at 5.30 on a Saturday morning, when a) you'd normally fit all the prospective passengers into a minibus and b) normally GoVia have no urge to stick anything more than four cars out off-peak even when it's busy.

It's either incompetence or a deliberate attempt to bully drivers. I know which one I think is more likely.
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
I guess it's all perception as you say. As an outsider looking in, it seems odd to me that ASLEF can accept a train in one part of a franchise but then disagree with it elsewhere. It makes them look fickle. Yes I know ex-southern and ex-FCC have different terms, but to the general public it just looks like whining to extract yet another allowance after already receiving above inflation pay rises.

Perhaps what ASLEF should be doing is, rather than saying Gatwick Express should be operating 12 car DOO under a Thameslink agreement, perhaps they should be refusing 12 car DOO on Thameslink under a Gatwick Express agreement.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
Perhaps what ASLEF should be doing is, rather than saying Gatwick Express should be operating 12 car DOO under a Thameslink agreement, perhaps they should be refusing 12 car DOO on Thameslink under a Gatwick Express agreement.

It looks like Thameslink drivers are on better terms than Gatwick Express with a pay rise to £49,000 agreed for the latter this year, while the former go up to £51,000. I wonder if the underlying reason is ASLEF want the Gatwick Express drivers brought up to Thameslink level.
 
Last edited by a moderator:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,771
Perhaps the definition of how length is measured needs to be clarified? If the agreement says 'coaches', then the driver has done nothing wrong. If the agreement says 'metres', then if the train was longer than the agreed length for DOO, then the driver has done nothing wrong. The company appear to be trying to bend agreed rules. If it was the other way around, and a member of staff were trying to bend the rules, would the company be so willing to accommodate?

But the Ts & Cs for Gatwick Express drivers, as linked to on the forum, does not specify length by coaches or metres. It is always possible there is a separate agreement though.
 

Llanigraham

On Moderation
Joined
23 Mar 2013
Messages
6,487
Location
Powys
Putting something in bold doesn't make it so. How about a copy of the agreement. You can redact anything not pertinent.

Your posts after all are "not official policy..."

The person making the statement works for the Company and does the job, therefore their comments bear far more sway than yours. <D
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,519
Location
Isle of Man
I wonder if the underlying reason is ASLEF want the Gatwick Express drivers brought up to Thameslink level.

No, the underlying reason is that ASLEF want to protect the jobs of guards. They've been completely clear about this for at least the last two years.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
No, the underlying reason is that ASLEF want to protect the jobs of guards. They've been completely clear about this for at least the last two years.

It's already been said that Gatwick Express did away with guards years ago and ASLEF have agreed to 10 car DOO workings on Gatwick Express (10 car previously being the longest working), so do they now want to employ new guards opposed to keep existing guards in jobs?
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,519
Location
Isle of Man
But the Ts & Cs for Gatwick Express drivers, as linked to on the forum, does not specify length by coaches or metres. It is always possible there is a separate agreement though.

Has that agreement been superceded since 2012? The agreement also lists which classes of train GatEx drivers are expected to drive, and 387s are (obviously) not listed in that. I'd also mention the limit to how many DOO trains can be passed on an adjacent line in a 60-minute period, given how busy the Brighton Main Line is these days...

jcollins said:
It's already been said that Gatwick Express did away with guards years ago and ASLEF have agreed to 10 car DOO workings on Gatwick Express (10 car previously being the longest working), so do they now want to employ new guards opposed to keep existing guards in jobs?

GatEx has changed, with more trains through to Brighton. These were traditionally operated by Southern, which do have guards.
 
Last edited:

BestWestern

Established Member
Joined
6 Feb 2011
Messages
6,736
Note swap from platform staff and slam door DOO to train mounted cameras, in cab monitors, automatic doors with sensing and smaller platform train gaps

"Slam door DOO"...?? Could you tell us what rolling stock that is, it sounds rather interesting?!
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,254
Oops I keep forgetting the 442s have automatic doors.:oops:
 
Last edited:
Status
Not open for further replies.

Top