Or maybe Victoria to Ashford? Bromley South and Maidstone East are the only busy intermediate stations.
It's a weather thing - Britain is one of the few countries which gets the right sort of weather to make third rail a not completely idiotic option from the outset.
The northern European nations, for example, Sweden, Norway, Germany, north and east France, northern Italy, Austria, Switzerland, Poland and so on, they get significant snow falls each year, have very cold temperatures in winter, so a third rail at track level would be covered in snow and suffer icing problems.
The southern European nations, south France, south Italy, Greece, Spain and Portugal, they have the opposite problem - it's very hot during the summer, keeping third rail electrically insulated and permitting significant expansion and contraction of the rail overnight isn't easy, much easier to deal with heat through robust autotensioning on overhead wiring.
Britain slots into a nice little niche, it's not usually so hot in summer than the third rail buckles and falls off the insulator pots, nor is it so cold in winter that thick ice is a major problem, snow certainly isn't a regular issue, so third rail can do its (very poor) job for most of the year without any significant issues.
The more spread out nature of European countries doesn't help the case for third rail either - in Britain, looking at London, Brighton, Gatwick, Bournemouth, Southampton, Dover and so on, lots of towns and cities all very close together, third rail is much much harder to do if you've got 100 miles between town, and not 10 miles.
That's where high voltage AC electrification makes sense - you can feed it pretty much at every point you cross a power line or come into a town/city with an HV supply. The GWEp has only needed two new feeders to be installed - Didcot and Melksham.
Is the end is nigh for class 442
I am hopeful that some use can be found fro the class 442's, as in comparison to say the class 313/315/317 trains they are not that old, other than the running gear being from the 1960's using running gear that has been used in class 73's.
Yes, and the REP traction kit is coming up to 50 years old... I remember someone years ago on uk.railway (might have been Mr Catlow) saying the skills and experience to maintain DC motors in particular are beginning to dry up. Not to mention the spares situation.They're almost 30 years old
I was at hassocks today and I saw two bright red class 387 with red seats and Gary doors on trial runs,
I'm guessing this will be the end for the "flying pigs" over the coming months,
I would much prefer to see the continued use of the 442's to free up 377's to see the end of the 313's, but southern has just released the 313,s for £1 per month per train, hahahaha, What's people's thoughts?
The 442s have the EE546 motors removed from 4REPs (which were originally introduced for the class 73 electro-diesels). Those motors are 400hp (300KW) each giving 1600hp (1.2MW). The above figures are only true when the 750V is at its nominal value.
I am hopeful that some use can be found fro the class 442's, as in comparison to say the class 313/315/317 trains they are not that old, other than the running gear being from the 1960's using running gear that has been used in class 73's.
Not sure if the 73's can draw off both the juice and the on board slug at the same time but i am convinced ad a teen i witnessed a 73 stalling on the bank out of tonbridge T Wells bound and in the progress of getting moving not only cranked up the engine but the shoes were zapping some impressive sparks as it tried to regain traction.
They're almost 30 years old, and any significant sums spent on re-engineering the stock will need them to remain in service through 40 years and possibly toward 50 years - that's the sort of number crunching we're seeing with ScotRail and their refurbished HST sets.
There's already a pretty significant concern at ScotRail that pushing their refurbished HST sets to remain in service through to 2039 and completion of electrification to Inverness is quite possibly asking too much, and that something will need to be done, maybe as early as 2029 when it's intended that electrification will reach Dundee and probably by 2034 when it's intended that electrification reaches Aberdeen.
These units, power cars, coaches, none of them can remain in service indefinitely - bogies will begin to crack (we've been there once with HST already) and structural components will start to fail, electrical and mechanical parts will begin to fail and repairing or replacing them without redesign will be harder, we will see a drop in reliability and lots of hard work needed by depots just to maintain what will be pretty poor casualty figures.
It's easy to say doing something with Class 442 units might save a bit of money, but if it costs you a huge amount of TDA payments to other TOCs, a fortune in delay repay payments to your passengers and it needs your engineering people in on overtime 7 days a week just to ensure you're not short forming sets day in, day out and breaching franchise obligations, you'll be spending more every month than if you had just gone to a ROSCO and ordered up new stock, accepting a hefty lease payment.
Why can't this be done for 442s? Admittedly it would be better if the power car could be retractioned for AC power with a pantotograph. Speed limit could then be increased to 110 or 115mph. I am sure someone on the 25kv system would like two dozen units of this quality with plug doors.
What would the minimum ongoing maintenance spend need to be to keep them available for spot-hire / charter? That way the could be available for things like strengthening services when there's a special event on somewhere in 3rd-rail land.
What does your last sentence 'running gear' mean?
AFAIK, the diesel engine uses a separate power controller, so the power sources might not have been interlocked?
I was a regular visitor to Wakefield and Eastleigh when Mark2s were being refurbished in the late 1990s for Virgin. They were totally stripped, reskinned, rewired repainted, reupholstered and bogie strip and rebuild until they were as good as when built 20 years earlier for much less than new build. Some are still in traffic and we would be stuck without them now on the loco hauled Fifes and West Cumbrian services 20 years on.
Why can't this be done for 442s? Admittedly it would be better if the power car could be retractioned for AC power with a pantotograph. Speed limit could then be increased to 110 or 115mph. I am sure someone on the 25kv system would like two dozen units of this quality with plug doors.
What would the minimum ongoing maintenance spend need to be to keep them available for spot-hire / charter? That way the could be available for things like strengthening services when there's a special event on somewhere in 3rd-rail land.
He he, your first three paragraphs started to lead me to believe that you thought the 442s to be a better solution for Scotrail express than the HSTs, oh dearie me, is that one we haven't seen on here yet?!They're almost 30 years old, and any significant sums spent on re-engineering the stock will need them to remain in service through 40 years and possibly toward 50 years - that's the sort of number crunching we're seeing with ScotRail and their refurbished HST sets.
There's already a pretty significant concern at ScotRail that pushing their refurbished HST sets to remain in service through to 2039 and completion of electrification to Inverness is quite possibly asking too much, and that something will need to be done, maybe as early as 2029 when it's intended that electrification will reach Dundee and probably by 2034 when it's intended that electrification reaches Aberdeen.
These units, power cars, coaches, none of them can remain in service indefinitely - bogies will begin to crack (we've been there once with HST already) and structural components will start to fail, electrical and mechanical parts will begin to fail and repairing or replacing them without redesign will be harder, we will see a drop in reliability and lots of hard work needed by depots just to maintain what will be pretty poor casualty figures.
It's easy to say doing something with Class 442 units might save a bit of money, but if it costs you a huge amount of TDA payments to other TOCs, a fortune in delay repay payments to your passengers and it needs your engineering people in on overtime 7 days a week just to ensure you're not short forming sets day in, day out and breaching franchise obligations, you'll be spending more every month than if you had just gone to a ROSCO and ordered up new stock, accepting a hefty lease payment.
What classes of loco can haul them in push-pull? I can see that the motor coaches are almost certainly on a one way trip to the baked bean can factory, but is there a future for the other 4 coaches in each unit to replace ageing hauled charter stock for the likes of Riviera?
The other issue which is conveniently forgotten is just past the short termism of the Class 442, a flood of Mark 3 LHCS vehicles will be coming available when Greater Anglia does something about fleet renewal, and Mark 4 LHCS vehicles will be coming available when IEP lands on the ECML. The Mark 4 flood makes Class 442 life extension moot - supplied with matching driving vehicles, fitted with power doors, capable of working in hauled mode with any normal locomotive and in push-pull mode with only a small number of modifications to the DVT for which basic plans already exist, why would you bother with Class 442s ?
Conversely, virtually all of the Mk3 LHCS don't meet the legal requirements for operation beyond 1/1/2020, same with the IC125 sets. So far only the Scotrail sets have any commitment to have the required work done, so it really comes down to whether the Mk4 sets can cover all of the requirements post- 2020 or are more Mk3 conversions needed - and in the latter case, does a de-tractioned 442 work out better financially than a Chiltern or Scotrail-type conversion? Or new stock, although the window for getting that in service by 2019 is closing rapidly.Very good point. So, what's Gillette's new razor called? The Mach 4(42)?Or is that the number of baked beans in a can...
The added advantage of the 442's is that they are ready imminently. Whereas any availability of GA mk3's or VTEC mk4 and hst are still some 3 to 4 years away. TPE's new services are supposed to be starting in less than a year. Something will be needed and pretty bloomin' soon. There is at least a 2 year lead on new build by the time crew training is also taken into account and fleet needs to be in service before services are introduced and we have already proved there arent enough 185's to cover the existing service.
Granted there arent many more advantages, logistically the engineering side wont be simple....
But they're not ready imminently, that's the point several of us have been trying to make.
The Class 458/5 project is a good example of the length of time it will take to do anything with the Class 442 units - with the 458/5 project, the contract was signed in January 2012 and the last 458/0 units have only just left SWT, with the last 458/5 units not expected in service until Spring 2016, over 4 years from contract signing.
The full 442 fleet doesn't come out of service for a while yet, so even taking 2 or 3 years into account, full entry into service of a major rebuilt Class 442 could be some time around January 2020. There is genuinely a large amount of work needed to convert these units into a LHCS Mark 3 unit, 2 years doesn't seem unreasonable and any horrors in terms of corrosion, fatigue etc, and 3 or 4 years becomes a reality.
What is the rollout time for the GatEx 387s, how long is it expected before they completely bump out the 442s?
TPE's new services are supposed to be starting in less than a year. Something will be needed and pretty bloomin' soon. There is at least a 2 year lead on new build...