As a member of the FoSCL (although my involved is really limited to donations given that I live in SW London) I can say with absolute sincerity that I'm grateful for your efforts, especially given that I use the S & C to visit my in-laws who live in Dent Dale.
However, I think its fair to say that its much easier to save a railway that is still in operation rather to re-open one that has been closed for several decades and has lost part of its track bed to a major road. Not to mention one that doesn't run to a important regional centre.
This is a honest and genuine question; how much of a fight was put up to try and stop the line from Keswick to Penrith closing in the 1970's? I've seen a picture in one of the books that I own which shows the last ever train complete with a head board but I've not seen any information regarding protests trying to stop the closure of the line.
--- old post above --- --- new post below ---
Ah, we agree on something. Yes much, much harder to reinstate lines but it is being done in Wales and Scotland.
As I have said previously, so much work was done on the former formation of the Waverley route to stabilize cuttings and embankments and replace bridges that it was like building a new route. The whole reinstatement cost something like £8-£9m per mile including the new build northern section.
There is very little problem with the current disused section from Penrith to Keswick that a couple of JCBs and a team of Orangemen couldn't sort out if funding was available. Non has been lost to road building although two bowstring bridges have been knocked off their abutments in the current torrents, one by a caravan washing down the River Greta. Reinstatement would cost £5-£6m per mile for 17 miles?
This is very economical when you consider that the Bedale bypass in North Yorkshire is costing £22m per mile for just a normal two way road and the A1 widening north of Leeming Bar to motorway standard is a touch under £30m per mile.
The Keswick branch would have to be electrified as we all know electric trains are 30% cheaper to operate and maintain and 25% cheaper to build and lease than diesel traction and would make sense with the WCML already wired.
Unfortunately, I was at Leeds University from 1970-76 and was too busy with studies in medicine and clinical attendances at night and weekends and a new wife to be involved with any campaign to keep the Keswick line open. I now wish I had done. I have a soft spot for this line as my parents spent the first night of their honeymoon in Keswick in September 1929 before catching a train to London for the rest of it.
It will happen if enough pressure is put on Government and a good case can be made to reinstate. I understand a feasibility study has been done but as yet I am unable to find a benefit/cost ratio.
There must have been some kind of resistance from Keswick Town Council and the National Park to closure?