• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Monorail?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Philip C

Member
Joined
21 Feb 2013
Messages
407
I was going to add Rhyl - it was inside the Sun Centre swimming pool, which also had a wave generator

I'm living and learning! The Rhyl monorail to which I made reference was on the seafront. I heard about it, but never saw it. If you have a look, using the link below, you will discover that it was 600 yds long, 15ft above the ground and lasted for just 6-7 weeks in 1980 before closure! I was unaware of the Sun Centre monorail - does this still operate?

http://rhyl-life.blogspot.co.uk/2009/03/monorail.html
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,675
The track is there at Blackpool Pleasure Beach, but it hasn't run for years.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,350
Location
Yorkshire
The monorail at the pleasure beach still runs, reopened when nickelodean land opened.

I remember riding on it as a kid, have a vague memory of there being a (disused) second station which was on the balcony of a former restaurant near the park entrance...?
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Peel wanted to build (or rather wanted others on their behalf to fund) one from the Trafford Centre into Manchester city centre shortly after the centre opened.
 
Last edited:

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,827
Location
Epsom

theageofthetra

Established Member
Joined
27 May 2012
Messages
3,565
Location
Beckenham
They also don't include freight carrying monorails such as the numerous vineyard ones on the slopes of the Cinque Terre in Italy.
--- old post above --- --- new post below ---
I remember going to that Rhyl Sun centre when it first opened in about 1981, but don't remember a monorail. It was always going to be doomed- Stuart Hall did the opening ceremony.
 

mark-h

Member
Joined
14 Jan 2015
Messages
374
They define monorails as having vehicles "wider that the guideway which supports them".

The Betharram system is a rubber tyred vehicle guided by a central rail (similar to many theme park ghost trains). If it were to run above ground then the structure would have to be wide enough to contain the outer wheels, making it not a monorail.


The monorail society only includes "transport" monorails which serve more than one station in their world list.
 

Pigeon

Member
Joined
8 Apr 2015
Messages
1,123
Under hung monorails are more stable than wheel on rail trains. Barring a massive structural failure there's no way for them to derail.

True, but they require a huge amount of structure to make them work in the first place. As a solution to the problem of making something not fall off they are still hugely extravagant compared to simply having two rails.

They define monorails as having vehicles "wider that the guideway which supports them".

Not a good definition, since pretty well all trains are wider than the track...
 

WillPS

Established Member
Joined
18 Nov 2008
Messages
2,431
Location
Nottingham
Flamingo Land has *two*

Alton Tower's track and rolling stock, plus, I understand, associated buildings and spares, came from the Vancouver Expo 86 Monorail
Some of it did, obviously some adaptation was required, primarily new supports - then owner John Broome attempted to have these done on the cheap by a local supplier. The stresses of the track were not fully understood though, and the next closed season Von Roll themselves ended up rebuilding most of it.

Didn't it stop running after the 'House of Fun' through which it ran burnt down?
No. That section was rebuilt.
The monorail at the pleasure beach still runs, reopened when nickelodean land opened.
It didn't close at all for that period, although it ran fairly irregularly for its last few seasons.
Not any more. It's now closed for good.
Sadly so, closed at the end of the 2013 season. The circuit is now incomplete, the former main station having been removed.
 

cjohnson

Member
Joined
3 Sep 2009
Messages
613
Seem to recall a few years back there was a proposal to run a monorail along the A4 corridor from Hammersmith-Heathrow via a new proposed Brentford FC stadium by Kew Bridge station...?
 

Pigeon

Member
Joined
8 Apr 2015
Messages
1,123
Is there a chance the track could bend???? ;)

Could not resist. sorry. :)

Hey, it's not so daft. Primitive points on two-rail systems have been implemented like that. I've an idea I might even have seen a set, on a mine tramway. The incoming track flexes sideways by a few inches to align with one or other of the diverging tracks.

Certainly it's been done on monorails using a hinge to allow the bend. The Listowel and Ballybunion line for one.

Whether a monorail design has used actual flexing rather than a hinge I'm not sure, but I'd be surprised if it hasn't at least been seriously proposed.

Is this classed as a monorail? (Schwebebahn Wuppertal) https://www.youtube.com/watch?v=Nb8Zqr6N3As
Really want to have a ride on it

It is.
 

nidave

Member
Joined
12 Jul 2011
Messages
923
Hey, it's not so daft. Primitive points on two-rail systems have been implemented like that. I've an idea I might even have seen a set, on a mine tramway. The incoming track flexes sideways by a few inches to align with one or other of the diverging tracks.

Certainly it's been done on monorails using a hinge to allow the bend. The Listowel and Ballybunion line for one.

Whether a monorail design has used actual flexing rather than a hinge I'm not sure, but I'd be surprised if it hasn't at least been seriously proposed.



It is.


Thanks for replying and giving a serious reply..
I will leave this here and see if you can keep it out of your head: https://www.youtube.com/watch?v=ZDOI0cq6GZM
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,640
Location
Nottingham
The difference is that a railway point has to move or bend by a couple of inches, a monorail point by several feet. It's rather like if a heavy rail point had two tracks ending before they met, and a piece of flexible track that joined to one or the other.

I think the Listowel and Ballybunion "points" were turntables that allowed a straight piece of track to swivel out of the way and be replaced by a curved one. Still a pretty hefty bit of engineering especially if the curved route is to be useable at a reasonable speed.
 

thenorthern

Established Member
Joined
27 May 2013
Messages
4,712
The now closed Sydney Harbourlink Monorail pretty much sums up the issues with Monorails.

It cost more than light rail to build and run, it was slower, there were many height restrictions for the roads it ran over, it ran in 1 direction, the stock had to be specially made and most of all it was more of a tourist railway than a meaningful means of transport.

The suspended monorails in Japan I am told are good.
 

Philip C

Member
Joined
21 Feb 2013
Messages
407
I think the Listowel and Ballybunion "points" were turntables that allowed a straight piece of track to swivel out of the way and be replaced by a curved one. Still a pretty hefty bit of engineering especially if the curved route is to be useable at a reasonable speed.

The L&B didn't have "points" quite of the nature you describe. Switching between tracks was indeed effected by turntables but these, I believe, never had straight sections of track. The "turntable" comprised an arc of track pivoted at its centre which joined two sections of fixed track (say 'A' & 'B'). By rotating the "turntable" so that the opposite end of the arc aligned with fixed track 'A' the other end would align with, say, fixed track 'C' and thus the "point" would now lead from 'A' to 'C'. At Listowel and at Ballybunion it would also be expedient to use the device to turn the locomotive but I've always understood that pure turntables, as opposed to turntable/points, were not employed.

The attached link gives a view at Lisselton the principal (only?) intermediate station. There are quite a few books available on the subject.

Another oddity of this line was the existence of level crossings which worked like miniature "Tower Bridges" with the roadway being lowered to provide a crossing on the level with the naturally raised track.

Please feel free to add to/correct what I have written.

https://www.facebook.com/permalink.php?story_fbid=1452954551677478&id=1450728208566779
 

L&Y Robert

Member
Joined
22 Apr 2012
Messages
585
Location
Banbury 3m South
There used to be a commercial clip-together monorail system for use on building sites and so-on. Self-propelled vehicles something like a tipper wagon ran along a portable clip-together monorail track. I remember the system in use for the dualling of Church Street in Burnley in the fifties. There the skips were used to carry concrete from the batching plant out to the work-site, the track being altered to suit as the work proceeded. Recently I saw an example of the system in working order in a video taken at the Amberley Chalk-pits museum.
 

RichardN

Member
Joined
29 Nov 2013
Messages
430
Hey, it's not so daft. Primitive points on two-rail systems have been implemented like that. I've an idea I might even have seen a set, on a mine tramway. The incoming track flexes sideways by a few inches to align with one or other of the diverging tracks.

Certainly it's been done on monorails using a hinge to allow the bend. The Listowel and Ballybunion line for one.

Whether a monorail design has used actual flexing rather than a hinge I'm not sure, but I'd be surprised if it hasn't at least been seriously proposed.



It is.

Mumbai. https://youtu.be/HU3SZ7PV02U

I guess multiple hinged sections, but fascinating to watch.

Las Vegas looks simpler in comparison. https://www.youtube.com/watch?v=xT80lCQQjGI
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,974
Is this classed as a monorail? (Schwebebahn Wuppertal) https://www.youtube.com/watch?v=Nb8Zqr6N3As
Really want to have a ride on it

The Wuppertal Schwebebahn is well worth a visit - I was there last month. Also spend a bit of time at the terminal stations to see how their 'points' work (to get trains in and out of the depots) and to see how tight a radius the trains can traverse. The Wuppertaler Brauhaus is also worth the short walk from Alter Markt or Werther Brucke stations but that's going even further off topic!

There are also two smaller but more modern systems nearby, built by Siemens and referred to as H-bahn. One connects Dusseldorf Airport terminals to a car park and main-line station, and the other connects parts of Dortmund University campus to an S-bahn station. I missed the latter as it only runs on weekdays :cry:
 
Last edited:

Yew

Established Member
Joined
12 Mar 2011
Messages
7,230
Location
UK
Butlins Skegness and Minehead has Monorails, both opened in the 1960's and closed in the late 90's or early 2000's when the camps were redeveloped. At least towards the end they were pretty unreliable.

Indeed, i remember going to the skegness one near its demise. It only had one stop and seemed to run very rarely!
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
bending the track is hardly "out there" as an idea. It is, after all, how standard rail switches work!
 
Status
Not open for further replies.

Top