Plenty of action this morning between Huyton to Roby, with plenty of cherry pickers on the line west of Roby.
Interesting and clear, thank you.
--- old post above --- --- new post below ---
The left hand end of the portal in 2936m very much looks like it will have a second half added to the left when the fourth rail is added, as the top member is rebated to the left end. I wonder if they will just add registration arms to the left upright in the meantime?
Indeed; I reckon yes to the first and I don't know to the second.
PS: any chance you might be able to visit Dixie's Gap again?
Dave
--- old post above --- --- new post below ---
I'm delighted that both Paul Gaskell and Dixie Dean have sent material for publication.
Dixie has developed a detailed map of the area of land needed for the fourth track east of Huyton station.
I have added it to Dixie's album here:
https://www.flickr.com/photos/127646831@N03/sets/72157649752701067/
Paul has sent more images of the Island Brow bridge in St Helens, which is likely to see the next stretch of electrification on the Wigan Branch, maybe during the blockade this coming Sunday.
I have added them to Paul's album here:
https://www.flickr.com/photos/127646831@N03/sets/72157649792560381/
I have woven all this material into the Combined Volume here:
https://www.flickr.com/photos/127646831@N03/sets/72157648494725811/
Thank you Paul and thank you Dixie.
--- old post above --- --- new post below ---
Made a flying visit to Mill Lane Bridge, Roby and Huyton today, in which time I encountered:
Rain
Hail
Snow
Dazzling sunshine
A bitter wind
Loads of Orangemen, many feeding wires through underground conduits
Roby lifts still not available for public use.
Dave
PS: I nearly forgot-
More wires over Pilch Lane Bridge
A wire under Bridge Road bridge and through Roby station as far as I could see eastwards to wards Huyton
A wire as far as I could see from the west towards Huyton, through Huyton station and meeting up with the one reported as up on Monday (I hope someone can confirm or otherwise that the wire is continuous between Roby and Huyton.)
The eastern limit appears to be unchanged from Monday.
This means that the only stretches of the whole project which are completely wireless are:
1. Huyton Junction from approx the eastern end of the bus station to the Vee where the Wigan trackbed veers north
2. From the same Vee along the Wigan branch to just past Longview Drive bridge
3. Ince Moss Curve (ie just north of Ince Moss Jct northwards to Springs Branch Jct
4. Ince Moss Chord (aka the Bamfurlong Branch)
5. Sankey Viaduct.
No. 4 seems a lower priority to me.
Yippee!
Pictures and Progressometer later.