Rick1984
Member
- Joined
- 23 Aug 2012
- Messages
- 1,145
Couple for the Lymington branch? They could stay third rail as well! ??????
Last edited:
To be a pedant they can hardly stay third rail as they've never been so... LU is fourth rail...Couple for the Lymington branch? They could stay third rail as well! ��
Assuming you meant "not the north", some suggestions:
Cardiff Valleys, if the wires do not go up quick enough.
West Wales/Central Wales
Greenford branch
Marshlink
Devon/Cornwall short branches
Matlock-Derby-Crewe
Wrexham-Bidston, Llandudno-Blaenau Ffestiniog
some East Anglia locals
Bedford-Bletchley
Aylesbury-Princes Risborough
Glasgow-East Kilbride (until wired)
In the north outside urban areas:
Cumbrian coast
Settle-Carlisle (limited to 60mph)
Middlesbrough-Whitby
Newcastle-Carlisle
Any of these free up "big" DMUs for cascade to "main" routes.
Somehow, I don't think the D78 allocation will be "democratic".![]()
Why don't the Newcastle, Carlisle and Middlesbrough areas count as urban????
How many D stock cars would they need to replace the whole fleet of Pacers?
Would it replace the 142s though with the 143/144s refurbished a la Porterbrook to offer another 10 years of life also.This idea alone can't replace all the Pacers either directly or indirectly. It would need to done alongside other projects.
Would it replace the 142s though with the 143/144s refurbished a la Porterbrook to offer another 10 years of life also.
Except the branches are due to be wired (although I'm not sure if anybody's found the funds or planned the project yet)
A number of around up to 75 ex-LU trains was mooted while there are 94 x 142s in total.
The Porterbrook 143/4 proposal may be sold in as their alternative to 153s, which they don't want to keep in single car formation.
Also there's rumours some 150s and 153s may have to be scrapped in the next few years due to corrosion in the case of the 150s and the bodies sagging in the case of the 153s.
So we could be talking about something like:
* Some 153s reformed in to 155s
* The rest of the 153s scrapped.
* The 'new' 155s directly/indirectly the written off 150s and some of the 153s.
* The refurbished 143/4s replacing the rest of the 153s.
Which leaves a total of 140 x Pacer trains to replace with the Vivarail proposal only going slightly more than half way to meeting that requirement.
I'm fairly sceptical about 15x being written off as fixing them how ever much it cost I think will be cheaper than a new build, we also seen to be ignoring cascades as a result of electrification and IEP HST cascades, yes initially it will be used to increase capacity rather than bin a bus but I doubt that will continue to be the case as we progress further through the electrification program.
I'm fairly sceptical about 15x being written off as fixing them how ever much it cost I think will be cheaper than a new build, unless there is to be a major new build rather than the Viva job, we also seen to be ignoring cascades as a result of electrification and IEP HST cascades, yes initially it will be used to increase capacity rather than bin a bus but I doubt that will continue to be the case as we progress further through the electrification program.
we also seen to be ignoring cascades as a result of electrification and IEP HST cascades, yes initially it will be used to increase capacity rather than bin a bus but I doubt that will continue to be the case as we progress further through the electrification program.
jcollins said:This idea alone can't replace all the Pacers either directly or indirectly. It would need to done alongside other projects.
If the corrosion/fatigue of major structure really has become critical, maybe it will be too expensive to give them another 5-10 years, but I think the powers that be need to consider that very carefully before selling them to Mr Booth.
The first half of your posting (due to be wired) leads me to ask how you can marry that sentiment to the second half of your posting (or planned the project yet). What Control Period has been officially nominated for the said works to be commenced on the Berkshire branches?
I have no idea if they're interested, but LM on Bedford-Bletchley would be ideal. A low-speed route with low loadings suffering a severe reliability problem due to a new unit having to be brought down from Brum every time one breaks. Bletchley CS with plenty of space for maintaining a fleet of say 4 of them.
Or perhaps as a first go the Stourbridge Shuttle? Or the Aylesbury locals replacing the bubble car?
Neil
Use them on the plannedDudley to Dudley Port service, then reinstate the line between Dudley and Round Oak and extend the service to Stourbridge?
Would it replace the 142s though with the 143/144s refurbished a la Porterbrook to offer another 10 years of life also.
This does beg the question, why are the 143/144's suitable for refurb and another 10 years, but the 142's aren't ? They are essentially the same train but with different coach work - or are they ?
I think the 142's should be similar and upgraded.
However 142's were built by Leyland and 143's/144's were built by Alexander hence the worse look on the newer ones.
This does beg the question, why are the 143/144's suitable for refurb and another 10 years, but the 142's aren't ? They are essentially the same train but with different coach work - or are they ?
Time the DfT got their finger out and poked it into the ROSCO's to order a new fleet of DMU's because the Pacers will not be allowed on the network after 2017 and set retirement dates for the Sprinter and Networker DMU fleets. Along with realistic electrification target and expected capacity provision on routes so that the TOC's can work with the ROSCO's on a forward plan for new units, refurbishments and retirements. Faffing about with a new small fleet of old LU units as a stop gap is just kidding themselves and leaving passengers with a lingering poor experience.
--- old post above --- --- new post below ---
Yeah I know they are different bodyshells, but just because one looks uglier doesn't mean it's past it - however, as I've said above, time to scrap the lot
Cheers, just down to ownership then
As there are 75 6 car D78 trains, surely this would replace more than just the 142s?
Assuming you meant "not the north", some suggestions:
Cardiff Valleys, if the wires do not go up quick enough.
West Wales/Central Wales
Greenford branc
Marshlink
Devon/Cornwall short branches
Matlock-Derby-Crewe
Wrexham-Bidston, Llandudno-Blaenau Ffestiniog
some East Anglia locals
Bedford-Bletchley
Aylesbury-Princes Risborough
Glasgow-East Kilbride (until wired)
In the north outside urban areas:
Cumbrian coast
Settle-Carlisle (limited to 60mph)
Middlesbrough-Whitby
Newcastle-Carlisle
Any of these free up "big" DMUs for cascade to "main" routes.
Somehow, I don't think the D78 allocation will be "democratic".![]()
The info Vivarail has suggests only 85 D-Trains can be made. Maybe they never bought all of the D78's?? And they are more 142's than that.
No, the step access to 143/144s can be made PRM compliable whilst the 142s apparently cannot, or at least not without some serious and expensive work.
As another idea, if wikipedia is to be believed, 85 is exactly equal to the combined total of Northern's 156s and 158s. It would presumably make the franchise cheaper to run....
Time the DfT got their finger out and poked it into the ROSCO's to order a new fleet of DMU's because the Pacers will not be allowed on the network after 2017 and set retirement dates for the Sprinter and Networker DMU fleets. Along with realistic electrification target and expected capacity provision on routes so that the TOC's can work with the ROSCO's on a forward plan for new units, refurbishments and retirements. Faffing about with a new small fleet of old LU units as a stop gap is just kidding themselves and leaving passengers with a lingering poor experience.