Or just invest that development money in the aforementioned wiring trains.
Yes, most definitely.
Or just invest that development money in the aforementioned wiring trains.
Well we certainly won't if we keep throwing money at gimmick solutions.
We have a proven solution.
We have plenty of spare electric units that will do in a pinch, so the budget for near term diesel purchases can instead go to electrification.
From what I understand from this thread, regulations mean that we can't fit an engine under the floor within our loading gauge, so a sensible solution would be to put the engine somewhere else. Call it a gimmick if you like, I call it problem solving.
The "regulations" don't actually mean that an engine can't be fitted under the floor of a new train. What's being assumed is that manufacturers are dragging their feet on providing a solution to the emissions regulations, which is more to do with a lack of orders from the DfT - there are always solutions, repackage the diesel power unit, move parts around, look at revised solutions for exhaust systems and so on - manufacturers aren't going to invest in doing this work without any indication of orders.
The day a regulation says explicitly what I can or can't do will be truly be an amazing day that will go down in the history books - I'll be damned if I can make sense of any statutory instrument the first time I read them![]()
There's also a possibility that if Selby-Hull isn't electrified in CP5 that what's shown as the Hull semi-fast in the HLOS will get terminated at Leeds/Selby and run as an EMU service with a diesel Leeds-Hull service and Hull retaining it's direct Manchester service via a diversion of South TPE.
The "regulations" don't actually mean that an engine can't be fitted under the floor of a new train. What's being assumed is that manufacturers are dragging their feet on providing a solution to the emissions regulations, which is more to do with a lack of orders from the DfT - there are always solutions, repackage the diesel power unit, move parts around, look at revised solutions for exhaust systems and so on - manufacturers aren't going to invest in doing this work without any indication of orders.
The day a regulation says explicitly what I can or can't do will be truly be an amazing day that will go down in the history books - I'll be damned if I can make sense of any statutory instrument the first time I read them![]()
The consultation doesn't include removal of the Manchester via Leeds service.
DfT said:The route between Hull and Selby is not included in current
electrification plans. However, the evaluation of the case for
Hull-Selby electrification is progressing and a decision is
expected to be taken late 2014 or early 2015. Current demand
to/from Hull is shown in Figure 4.2. This shows the main travel
demand is to towns in East Yorkshire, and to Leeds and
London. If the decision is taken to electrify this route, we would
expect through services between Hull and Manchester to
continue and to be operated with electric rolling stock. If a
decision is made not to electrify the route, the train service
options include:
A Hull – Leeds diesel service that allows connections to be
made at Leeds for electric services to Manchester and
beyond;
A through Hull service via the North TransPennine route,
which would require the operation of diesel services ‘under
the electric wires’ to Manchester Piccadilly, Manchester
Airport, Liverpool or Chester.
additional Manchester service via Sheffield (remember i'll take about 30 minutes longer
Ending Manchester-Leeds-Hull direct services is an option included if Hull is not electrified.
Don't forget if 6tph on Manchester-Huddersfield-Leeds goes ahead then 2tph will become semi-fasts. The DfT HLOS for CP5 (which pre-dates the franchise consultation document) indicates that the semi-fasts would be Manchester to Selby/Hull services which would have 5 calls between Manchester and Leeds (Stalybridge, Huddersfield, Dewsbury and 2 stations between Stalybridge and Huddersfield.) Someone on here claimed Metro were pushing for them to stop at some stations between Huddersfield and Leeds as well as those 5 calls.
Indeed, my apologies! I was thinking in the context of the South TP changes - there's no automatic one would replace the other. That's very true about timings, I'm genuinely surprised Hull City Council haven't been more vocal about the potential for journey times to increase. I suppose given the likelihood of electrification any time penalty is likely to be absorbed.
What I was thinking if they announce North TPE will no longer include a Manchester-Hull service, they would announce any South TPE changes at the same time so a news of a new Hull-Sheffield-Manchester service would soften the blow of losing a direct Hull-Leeds-Manchester service.
I'd guess that if Hull isn't electrified in CP5 North TPE will include a Chester-Manchester-Hull diesel service, with Chester-Warrington and Selby-Hull then becoming CP6 electrification projects.
I also think saying the option for cutting Hull services at Leeds isn't the option DfT want to take forward but they've included it so people in Middlesbrough, Scarborough, Barrow and Windermere don't say "What's so special about Hull?"
The "regulations" don't actually mean that an engine can't be fitted under the floor of a new train. What's being assumed is that manufacturers are dragging their feet on providing a solution to the emissions regulations, which is more to do with a lack of orders from the DfT - there are always solutions, repackage the diesel power unit, move parts around, look at revised solutions for exhaust systems and so on - manufacturers aren't going to invest in doing this work without any indication of orders.
The day a regulation says explicitly what I can or can't do will be truly be an amazing day that will go down in the history books - I'll be damned if I can make sense of any statutory instrument the first time I read them![]()
Does a DMU necessarily have to use a drive shaft, gears, etc? Could the engine be used to run a generator which would generate power for traction motors (like a normal diesel-electric loco) or would there not be the room underneath to do it (or would it be too heavy)?
Could the engine be used to run a generator which would generate power for traction motors (like a normal diesel-electric loco) or would there not be the room underneath to do it (or would it be too heavy)?
Does a DMU necessarily have to use a drive shaft, gears, etc? Could the engine be used to run a generator which would generate power for traction motors (like a normal diesel-electric loco) or would there not be the room underneath to do it (or would it be too heavy)?
Of course what is different about Hull is that it is at least 3 times larger than any of the other places.
Really? The unitary authority of Hull had a population of 256,000 in the 2011 census while unitary authority of Middlesbrough had a population of 138,400. So unless Hull has seen a 61% population increase in just 3 years then it's much closer in size to the other places than you think.
Also, don't forget it's just Brough and Hull that would be affected by ending Manchester-Hull services (assuming Selby-Manchester electric services remain), while truncation of Middlesbrough-Manchester Airport services would affect a total of 5 places. In the case of the Barrow-Manchester services some of the intermediate stops between Barrow and Lancaster are very popular with tourists.
I'm getting a tad tired of this "trouble fitting under the floor" twaddle - power packs currently fit under the DMU's, I've yet to see anything that adequately explains why power packs have grown bigger in the rail market, yet engine sizes in the road power market have got smaller and more powerful - I don't really but into the emissions argument either, there's plenty of space inside a 23x2.5x3.5 box that typically form a railway carriage. Sloping floors in IEP ? How much so, is that a result of the A Train bodyshell technology or because extra large power packs are being used to allow the potentially never 140mph operation ? Or other bizarre reasons
The 256,000 figure for the unitary authority of Hull seems to include just 1 station - Hull. The 138,400 figure for Middlesborough also seems to include just 1 station - Middlesbrough.
A very fair comparison I think!
If you compare station usage then Hull gets 37% more usage than Middlesbrough.
I don't know how you can come up with a fair way to make Hull sound 3 times bigger than Middlesbrough.
But do we really, in our heart of hearts, think that we will electrify enough mileage so that if we don't build any more non-InterCity DMU's the current ones will be able to be replaced on life expiry without there being a shortage ?
I'm highly sceptical
Although I would love to see a 100% network, I doubt it will happen in my lifetime.
First off there are a lot of lines to electrify, even doubling the rate of electrficiation it will take a very long time to do it all (given we were at about 33% of the network having been electrified in 2012). There is a total of about 15,000km of rail network in the UK, of which less than 6,000 is currently electrified, leaving us with over 9,000km to wire up. CP5 will take about 1,500km of this, leaving 7,500km. Even allowing for double this in CP6 and CP7 and we are down to about 2,000km (as it's not quite 1,500km per control period and it is over 9,000km to start with).
Linked with the above as more of the network is electrified you start getting dimminishing returns on your electrification teams, as less and less can be done using factory trains and more and more become those lines with tricky features to overcome and more bridge works are required. Meaning that even with double the teams CP7 could be back to about 1,500km. This could then mean that the start of CP8 could still see about 5,000km still to wire up even with throwing double the manpower at it (and probably tripple the cost).
Secondly there are a several lines which only see a few services a day, electrfying these is unlikely to be viable until basicly the rest of the network is electrified (or at least there are few other lines nearby so as to make a DMU fleet wasteful with a high percentage of spare sets needed). Given during CP5 there are lines which are not being wired up with a fairly strong case I doubt that there would be time to wire up enough of the network before a lot of our current DMU's retire in CP6 and CP7 to not purcahse any more DMU's.
If we have to purchase more DMU's anyway as we can not wire up enough of the network, then there is a case not to electrify too fast so as to provide work for said DMU's for a fair length of their lifespan.
However this can be overcome in part by using battery powered trains on short lengths of lines which otherwise would justify early electrification, so as to allow them to be electrified at a later date. As the life span of a battery is less than that of a train, meaning that an new EMU(B) would be able to be converted to a straight EMU at the end of the batteries lifespan as electrification came around to electrifying the line.
It can be further overcome by the use of bi-modal trains (on a potentially longer cycle), which leaves some of the longer lengths of wiring for the factory train(s) to do at a later date whilst focusing on doing lines which free up regional DMU's.
Assuming Cameron doesn't get his way and we leave the EU, presumably then we could stuff the emmissions regulations if we so wished.
I'm getting a tad tired of this "trouble fitting under the floor" twaddle - power packs currently fit under the DMU's, I've yet to see anything that adequately explains why power packs have grown bigger in the rail market, yet engine sizes in the road power market have got smaller and more powerful - I don't really but into the emissions argument either, there's plenty of space inside a 23x2.5x3.5 box that typically form a railway carriage
The coach itself may be 23x2.5*3.5 but there's no problem fitting an engine etc in there if you don't mind losing passenger space. The underfloor area is maybe 10x2x0.8m for a 20m vehicle.
I'd guess that Hull to Manchester is probably a larger market than Middlesbrough to Manchester - partly because a reasonable proportion of travel from Middlesbrough is going to be northbound (to Hartlepool, Sunderland, Newcastle, Metro Centre) plus a reasonable local service (to Darlington, Saltburn etc), whereas Hull has lower demand north (an irregular service to York) and fewer "local" trains.