Any evidence of feeder station contruction for these projects yet?
Please see post of 17th June 20:14 (p129 of this thread)
extract below
Notes: Electrification
Edge Hill to Wavertree only new mbs shown, older masts also exist
Bryn to Wigan NW only new mbs shown, older masts also exist
Ince Moss branch bases visible, but no masts yet
mbs in stations not shown, eg Prescot has two large "arch" masts
The rock 'canyon' N of Eccleston Pk will have side fixings, not mbs
Bases & scrapes east of Sankey viaduct, both sides of tracks
Lineside equipment installed (signalling?) Edge Hill-Broad Green
Extensive work on northbound platform at Bryn
Lineside equipment installed (signalling?) Bryn-Wigan
Lineside equipment installed (signalling?) Huyton-Whiston
Substantial electrical gear in place at Tuebrook Sidings
Substantial electrical gear in place at Huyton Quarry
Substantial lengths of "Return Wire" hanging nr Garswood and Bryn
Substantial lengths of "Power Wires" hanging nr Garswood and Bryn
Length of wires hanging in Olive Mount cutting, Liverpool
Length of "Return Wire" hanging between Eccleston Pk & Prescot
New signals lying near WTechPk, Collins Green, Whiston & Rainhill
Greaser at Earlestown definitely on back of flange against checkrail
Trackwork and signalling at Earlestown appears complete.
Huyton, Rainhill and Earlestown stations have no masts, bases or scrapes.
All other stations from Wavertree Tech Pk to St Helen Jct have at least one.